ML20137K230

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for June 1985 & Revised Unit 2 Repts for Apr & May 1985.Repts Revised Due to Error in Gross Generation Metering Sys
ML20137K230
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/15/1985
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20137K234 List:
References
NUDOCS 8509120102
Download: ML20137K230 (1)


Text

r T-Southern California Edison Company SW s AN oNormt nucle Am oENEn A tiNo st a tion p.o. som tat s&N C LEME N T E, C ALIF QRNI A 924?2 H. E. MORG AN tate *Mome

...o

..N....

July 15, 1985 Director Office of Management Information and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Str:

Subject:

Docket Nos. 50-361/50-362 Monthly Operating Reports for June 1985 San Onofre Nuclear Generating Station, Units 2 and 3 Enclosed are the Monthly Doerating Reports as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.

Also p ovided herein, are revised Operating Status Reports for April and May 1985 and a revised Average Daily Unit Pow 1r Level Report for April 1985.

The affected portions of these reports have been annotated with an asterisk in the right hand margin. The revision to the April Operating Status Report and Average Daily Unit Power Level Report was necessitated by an error discovered in the gross generation metering system for Unit 2 for the period April 17 to 19.

Please contact us if we can be of further assistance.

Sincerely, MEM U

Enclosures cc:

J. B. Martin (Regional Administrator, USNRC Region V)

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)

J. P. Stewart (USNRC Resident Inspector, Units 2 and 3) 0509120102 050715 d

PDH R

ADOCK 05000361 V

PDN t i

.