Letter Sequence Request |
|---|
|
|
MONTHYEARML20076G8671983-06-0101 June 1983 Outlines Plan to Complete Review & Update Tech Spec Requirements for Inservice Insp & Testing Pertaining to Other Reactor Auxiliary & Support Sys That Perform Safety Function for Postulated Design Basis Events Project stage: Other ML20023D9071983-06-0101 June 1983 Requests Fr Publication of Notice of Consideration Amending License DPR-34 Re Radiological Effluents & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Request ML20079M0521983-12-30030 December 1983 Forwards Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements Project stage: Request ML20079M0591983-12-30030 December 1983 Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements. Summary of Proposed Changes to Inservice Insp Requirements Encl Project stage: Request ML20079M0701983-12-30030 December 1983 Proposed Tech Spec Changes Re Inservice Insp Requirements Project stage: Other ML20244D3821985-06-28028 June 1985 Forwards Draft Evaluation of Util 831230 Proposed Changes to Tech Specs for Inservice Insp & Testing,Per Region IV Mar 1985 Request.Items Requiring Addl Info Will Be Resolved at Site Visit Scheduled for Wk of 850722 Project stage: Draft Other ML20244D5201985-08-22022 August 1985 Forwards Tp Speis 850812 Memo Transmitting PM Williams 850628 Memo & Draft Evaluation of Tech Spec Changes for Inservice Insp & Testing,Per Task Initiation Action 85-01, Task 3.Encl Should Be Transmitted to Util for Response Project stage: Draft Other ML20134M1841985-08-27027 August 1985 Forwards Evaluation of 831230 Application for Proposed Changes to Inservice Insp & Testing Requirements.Application Does Not Complete Surveillance Program Committed to by Licensee Project stage: Other ML20137H5321985-11-26026 November 1985 Application for Amend to License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H4991985-11-27027 November 1985 Forwards Application to Amend License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H5661985-11-27027 November 1985 Proposed Tech Specs Re Inclusion of Phase II of Inservice Insp & Testing Program Project stage: Other ML20211B8551986-05-30030 May 1986 Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing,Per ASME Code Section Xi,Div 2, Rules for Insp & Testing of Components of Gas Cooled Reactors Project stage: Draft Approval ML20211B8331986-05-30030 May 1986 Forwards Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing & marked-up Tech Spec Pages.Incorporation of Recommendations & Resubmittal of Tech Spec Change Requested within 45 Days Project stage: Draft Approval ML20207J6281986-07-24024 July 1986 Responds to 860718 Telcons W/Nrc Re 851127 Tech Spec Amend Application for Phase II Inservice Insp & Testing.Revised Application Will Be Submitted on 860901 Project stage: Request ML20214M7841986-09-0404 September 1986 Proposed Tech Specs Incorporating Phase II of Inservice Insp Program Project stage: Other ML20214M7741986-09-0404 September 1986 Application to Amend License DPR-34,changing Tech Specs to Include Phase II of Util Inservice Insp Program.Summary of Proposed Changes Also Encl Project stage: Request ML20212M7431987-03-0909 March 1987 Requests Fr Publication of Notice of Issuance of Amend 51 to License DPR-34,revising Tech Specs to Comprise Phase II of Facility Inservice Insp Program Project stage: Approval 1985-08-22
[Table View] |
Text
e 4
~..
mr PUBLIC SERVICE COMPANY OF COLORADO f
h o t w v c m, COLORADO eO201 P. o. sox e4o OSCAR R. LEE 16805 WCR 19 1/2, Platteville, Colorado 80651 VICE PRES 40E947 December 30, 1983 Fort St. Vrain Unit #1 P-834M*[d@ M W/P
[
Jef - 4 M Mr. John T. Collins, Regional A6ninistrator Region IV Nuclear Regulatory Commission S
611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011 Docket No. 50-267
SUBJECT:
Proposed Technical Specification Changes - In. Service Inspection and Testing Requirements
REFERENCE:
P-83195, Brey to Collins, dated June 1, 1983
Dear Mr. Collins:
This letter is to propose changes to the Fort St. Vrain Technical Specifications concerning the In-Service Inspection (ISI) and Testing requirements as outlined in the referenced letter. A summary of the proposed changes is provided in Attachment 1,
and the proposed changes themselves are provided in Attachment 2.
Please note that due to the insertion of additional requirements in existing specifications, certain pages are included because of page renumbering only. contains the safety analysis report for the proposed changes. This report concludes that since the proposed changes do not result from maaifications to plant equipment nor involve reductions in the margins of safety, no unreviewed safety question is raised.
Therefore, the proposed changes involve no significant hazards considerations.
8401270140 831230 OI PDR ADOCK 05000267
'O P
PDR 2
r--
. Attachment 4 is provided to summarize a detailed review of the adequacy of the applicable Technical Specification Surveillance Requirements for the Fort St.
Vrain reactor auxiliary systems important to safety and not addressed in Amendment No.
33 to the Operating License.
In accordance with the provisions of 10 CFR 170, we believe that the proposed changes are for Class III deemed to involve no safety hazards considerations.
A check in the amount of 54000.00 is enclosed for fee payment.
If ' you have any questions, please contact Mr. Don Warembourg at (303)785-2224.
Very truly yours, hhh
- 0. R. Lee Vice President Electric Production Attachments cc: Albert J. Hazle, Colorado Department of Health ORL/dkh