MONTHYEARML20076G8671983-06-0101 June 1983 Outlines Plan to Complete Review & Update Tech Spec Requirements for Inservice Insp & Testing Pertaining to Other Reactor Auxiliary & Support Sys That Perform Safety Function for Postulated Design Basis Events Project stage: Other ML20023D9071983-06-0101 June 1983 Requests Fr Publication of Notice of Consideration Amending License DPR-34 Re Radiological Effluents & Proposed No Significant Hazards Consideration Determination & Opportunity for Hearing Project stage: Request ML20079M0521983-12-30030 December 1983 Forwards Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements Project stage: Request ML20079M0591983-12-30030 December 1983 Application for Amend to License DPR-34,consisting of Tech Spec Changes Re Inservice Insp & Testing Requirements. Summary of Proposed Changes to Inservice Insp Requirements Encl Project stage: Request ML20079M0701983-12-30030 December 1983 Proposed Tech Spec Changes Re Inservice Insp Requirements Project stage: Other ML20244D3821985-06-28028 June 1985 Forwards Draft Evaluation of Util 831230 Proposed Changes to Tech Specs for Inservice Insp & Testing,Per Region IV Mar 1985 Request.Items Requiring Addl Info Will Be Resolved at Site Visit Scheduled for Wk of 850722 Project stage: Draft Other ML20244D5201985-08-22022 August 1985 Forwards Tp Speis 850812 Memo Transmitting PM Williams 850628 Memo & Draft Evaluation of Tech Spec Changes for Inservice Insp & Testing,Per Task Initiation Action 85-01, Task 3.Encl Should Be Transmitted to Util for Response Project stage: Draft Other ML20134M1841985-08-27027 August 1985 Forwards Evaluation of 831230 Application for Proposed Changes to Inservice Insp & Testing Requirements.Application Does Not Complete Surveillance Program Committed to by Licensee Project stage: Other ML20137H5321985-11-26026 November 1985 Application for Amend to License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H4991985-11-27027 November 1985 Forwards Application to Amend License DPR-34,revising Tech Specs to Include Phase II of Inservice Insp & Testing Program Project stage: Request ML20137H5661985-11-27027 November 1985 Proposed Tech Specs Re Inclusion of Phase II of Inservice Insp & Testing Program Project stage: Other ML20211B8551986-05-30030 May 1986 Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing,Per ASME Code Section Xi,Div 2, Rules for Insp & Testing of Components of Gas Cooled Reactors Project stage: Draft Approval ML20211B8331986-05-30030 May 1986 Forwards Draft SER Supporting Util 851127 Proposed Tech Spec Changes for Category I & II Inservice Insp & Testing & marked-up Tech Spec Pages.Incorporation of Recommendations & Resubmittal of Tech Spec Change Requested within 45 Days Project stage: Draft Approval ML20207J6281986-07-24024 July 1986 Responds to 860718 Telcons W/Nrc Re 851127 Tech Spec Amend Application for Phase II Inservice Insp & Testing.Revised Application Will Be Submitted on 860901 Project stage: Request ML20214M7841986-09-0404 September 1986 Proposed Tech Specs Incorporating Phase II of Inservice Insp Program Project stage: Other ML20214M7741986-09-0404 September 1986 Application to Amend License DPR-34,changing Tech Specs to Include Phase II of Util Inservice Insp Program.Summary of Proposed Changes Also Encl Project stage: Request ML20212M7431987-03-0909 March 1987 Requests Fr Publication of Notice of Issuance of Amend 51 to License DPR-34,revising Tech Specs to Comprise Phase II of Facility Inservice Insp Program Project stage: Approval 1985-08-22
[Table View] |
Text
.
p
. l public Service Company &Odonde 2420 W. 26th Avenue, Suite 100D D,enver, Colorado 80211
==si? "?50* i I:= k' 1 m
R\\Y
\\v ' Ml 0@ 'h 0
J""*
983 Fort St. Vrain k'
P-83195 Unit No. 1 y..
Mr. John T. Collins, Regional Administrator Region IV Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
SUBJECT:
Fort St. Vrain Inservice Inspection and Testing - Status Update
REFERENCE:
- 1) PSC letter P-80218; J.K. Fuller to James Miller, dated 7/16/80
Dear Mr. Collins:
- Recently, the Technical Specifications for Fort St.
Vrain were revised by License Amendment No. 33 to update various Surveillance Requirements pertaining to inservice inspection and testing for the Prestressed Concrete Reactor Vessel (PCRV), Reactor Internals, Primary Coolant System, Secondary Coolant System, and PCRV Auxiliary Systems.
This letter outlines PSC's plan to complete the review and update of Technical Specification Requirements for inservice inspection and testing as they pertain to other reactor auxiliary and support systems that perform a safety function for postulated design basis events.
Principal auxiliary and support systems to be reviewed are the helium
~
circulator auxiliary system, the helium purification system, the reactor auxiliary cooling water systems, the reactor building HVAC system, and ACM equipment.
The review of the reactor auxiliary-cooling water systems is essentially complete and was submitted to the NRC in preliminary fann by Reference 1.
This review covered the 8306160286 830601 gDRADOCK 05000267
- 005' PDR llO
P-83195 Page 2 circulating water system, the service water system, the fire water supply system, the reactor plant cooling water system and the purification cooling water system, and provided drafts of proposed changes to the applicable Technical Specification requirements.
Because of the nature of the remaining work, PSC does not plan to submit the results of further reviews in preliminary form.
- Instead, changes to the Surveillcoce Requirements, resulting from these reviews, will be assembled in one package and submitted with an application to amend the Technical Specifications. The adequacy of the Surveillance Requirements applicable to these systems will be discussed in the safety evaluation accompanying the application.
This submittal will complete PSC's commitment to review and update the inservice inspection and testing requirements for Fort St. Vrain.
PSC anticipates that the remaining system re/iews and preparation of the license amendment will be completed by the end of 1983.
Should you have any questions concerning PSC's plan to complete this update, please contact Mr. Mike Holmes at (303) 571-8409.
Very truly yours, WL s
H. L. Brey, Manager i
Nuclear Engineering Division HLB /JRJ:pa
-~r,
,,-,s,.- - -, -
,,m,
+
-