Informs That QA Program Change Submitted on 850604 Re Reorganization to Accommodate Shift in Activities Due to Near Completion of Const & Initiation of Operational Phase Activities
ML20137H337
Person / Time
Site: Beaver Valley
Issue date: 08/22/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
References
NUDOCS 8508280258
Download: ML20137H337 (2)


Text

_. ~ _.

i f _,i 4 1

l 22 AUG 1985 Docket No. 50-412 Duquesne Light Company ATTN: Mr. J. J. Carey Vice President i

Nuclear Group i

Post Office Box 4 Shippingport, Pennsylvania 15077 1

Gentlemen:

j m

Subject:

10 CFR 50.55(f) Quality Assurance Program Description Change Review Beaver Valley Power Station Unit No. 2

Reference:

Duquesne Light Company (DLC) letter 2 NRC-5-085 to USNRC dated j

June 4, 1985 i

We have received the above referenced letter which documented changes to the l

Beaver Valley Power Station Unit No. 2 Quality Assurance Program description, l

in accordance with the requirements of 10 CFR 50.55(f). These changes reflect a proposed reorganization at the Duquesne Light Company to accomodate the shift in activities due to the near completion of Unit 2 construction and the initia-t i

tion of the operational phase activities, such as, system turnovers and preoper-i ational tests. Region I staff has reviewed and found the proposed reorganiza-tion to be acceptable, as it did not reduce the commitments in the Quality Assurance Program previously accepted by the NRC.

)

i The effectiveness of your QA program implementation will continue to be the subject of future routine NRC inspections.

l If you have any questions concerning the above, please contact Mr. Madan Dev at (215) 337-5328.

l l

Sincerely, l

l Original signed gy i

Stewart D. Ebneter, Director t

Division of Reactor Safety l

N $00$! $

2 A

0FFICIAL RECORD COPY OL BV2 QA ACT - 0001.0.0

,o' 08/16/85 gV &

h

I e-Duquesne Light Company 2

cc:

E. J. Woolever, Vice President, Nuclear Construction Division E. Ewing, Quality Assurance Manager R. J. Swiderski, Manager, Startup Group R. E. Martin, Manager, Engineering E. F. Kurtz, Jr., Manager, Regulatory Af fairs P. RaySircar, Stone and Webster Engineering Corporation Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania IE/QUAB bec:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

DRP Section Chief T. Rebelowski, SRI, Millstone 3 M. Dev, DRS P. Eapen, DRS DRP Licensing Assistant (w/ concurrences)

Region I Docket Room (w/ concurrences)

R S

I S

RI:DRP RI:DRS De /fi/mjd pen Tripp

}rgfrbneter E

a 08/aq/85 08/JQ/85 8/2v 85 08/);/85 0FFICIAL RECORD C0P OL BV2 QA ACT - 0002.0.0 08/21/85

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _