ML20137E327
| ML20137E327 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/15/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20137E332 | List: |
| References | |
| NUDOCS 8511270238 | |
| Download: ML20137E327 (2) | |
See also: IR 05000414/1985049
Text
je//m
..
,
November 15, 1985
fukePowerCompany
ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
~Gentiemen:
SUBJECT:
REPORT NO. 50-414/85-49
On October 21 - 25, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
.
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by VLBrownlee)
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-49
cc w/ enc 1:
LA. L. Dick, Vice President - Construction
td. W. Hampton, Station Manager
bec w/sncl:
%, Johnson, ELD
tK. N. Jabbour NRR
Document Control Desk
State of South Carolina
$112 ggg ggggg g
NRC Resident Inspector
a
RII
RII
RII
I
RII
L ackson
GABelisle:sa
CJh
AG s
HDance
an
11/p/85
11//t/85
11//j/85
/ /85
11/l{/85
.Cuc)
- -
- -