ML20137E327

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-414/85-49 on 851021-25.No Violation or Deviation Noted
ML20137E327
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/15/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20137E332 List:
References
NUDOCS 8511270238
Download: ML20137E327 (2)


See also: IR 05000414/1985049

Text

je//m

..

,

November 15, 1985

fukePowerCompany

ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

~Gentiemen:

SUBJECT:

REPORT NO. 50-414/85-49

On October 21 - 25, 1985, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

.

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by VLBrownlee)

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-414/85-49

cc w/ enc 1:

LA. L. Dick, Vice President - Construction

td. W. Hampton, Station Manager

bec w/sncl:

%, Johnson, ELD

tK. N. Jabbour NRR

Document Control Desk

State of South Carolina

$112 ggg ggggg g

NRC Resident Inspector

a

PDR

RII

RII

RII

I

RII

L ackson

GABelisle:sa

CJh

AG s

HDance

an

11/p/85

11//t/85

11//j/85

/ /85

11/l{/85

.Cuc)

- -

- -