ML20137E146
| ML20137E146 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/18/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20137E151 | List: |
| References | |
| NUDOCS 8511270209 | |
| Download: ML20137E146 (1) | |
See also: IR 05000414/1985050
Text
p
fBur~
i
.
'
- -
NOV 18 m
Duke Power Company
JTTN:
Mr.
H.' B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-50
On October 21 - 26, 1985, NRC inspected activities authorized by NRC Construction
-Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these
areas, the --inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
3a
6 M/F
'
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-50
cc w/ enc 1:
d . L. Dick, Vice Preside't - Construction
J. W. Hampton, Station Manager
c w/ encl:
. N. Jabbour, NRR
Document Control Desk
State of South Carolina
dRC Resident Inspector
,d
[
WMillTdr:sa
TCon1on
!Herdt
11/$85
11/ /85
/lt/85
\\\\
0511270209 851118
DR
ADOCK 050
4
ya