Text
._
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 01/02/06 APPENDlX B - AVERAGE DAILY POWER LEVEL.
RFD39 RUN TIME 14:50: 30 BRUNSWICl< UN11 i DOCKET NO. 050-0325 COMPLETED BY FRANCES IIARRISON TELEPHONE (919)457-9521 DECEMBER 1935 DAY AVG. DAILY POWER LEVEL DAY AVG DAILY POWER LEVEL (MWE-NET)
(MWE-NEI) 1 772 17 731 2
765 iG 769 3
772 19 761 4
770 20 766 5
776 21 764 6
750 22 690 7
764 23 719 G
7'76 24 761 9
778 25 700 iO 777 26 70i li 777 27 704 12 775 28 776 13 764 29 784 14 S7i 30 703 15 637 31 784 16 660 1
1.16 -B i
8601170107 851231 i
PDR ADOCK 05000324 l
R PDR
'f LW '
ij.
~-
m y
)
e
'O -'
1 i CP&LtCO.
. PLANT PERFORMANCE' DATA. SYSTEM-TAGE '. JiL
' R'UN ?DATE l 01/02/86-OPERATING 1DA1A. REPORT-
.8PD361 RUNiTIME 'Li 4 : 50 : 33 L
. BRUNSWICK-UNIT 1~
DOCKET NO.iO50-0325
~
L COMPLETED B.Y FRANCES.HARRISOK l
OPERATING STA1U9 TELEPHONE-.(919)457-9521.
b o
l
- 1. UNIT HAME: DRUNSWICK-UNIT i.
t NOTES' l.
[
2.. REPORTING PERIOD: DECEMBER. 85 1
-1 L
- 3. LICENSED THERMAL POWER-(MWT>i 2436_
l li l
.4. NAMEPLATE RATING (GROSS MWE): -.867.0 26 I
'll 5.. DESIGN ELECTRICAL' RATING.(NET MWE); 821.0
- 6. MAX. DEPENDABLE CAPACITY-(GROSS-MWE) '815.0 t I
- 7. MAX DEPENDABLE 1 CAPACITY-(NET' hue)4-790.0
~~~~-~~------------------*-----
8.-IF CHANGES OCCUR IN CAPACITY RATINGS ( I T E M S - 3 '. f M R U. 7 ) SINCE LAST-REPORT, GIVE-REASONS:
9 POWER' LEVEL TO WHICH. RESTRICTED IF ANY'(NET'dUE)'
- 10. REASONS FOR RESTRICTION IF ANY.
l THIS
' YR:TO' TCUMUlc
. MONTH
-DATE:
ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 0760.00.
377065.00;
- 12. NUMBER OF HOURS REACTOR CRITICAL
~744.00 3409.62' 146831.40
- 13. REACTOR. RESERVE ~ SHUTDOWN HR5
.00- 11647;10'
- 14. HOURS. GENERATOR ON LINE 744.00 J3240.55-
'44137.30:
- 15. UNIT RESERVE SHUTDOWN-HOURS'
-. 0 0
.'0 0 '
- e 00 i
- 16. GROSS THERMAL 1 ENERGY = GEN. (MWH) 1730430.73-6057466.73-90106663;657 L
- 17. GROSS ELEC. ENERGY GEN. (MuH)-
- 575076;00.
,2009176.00
- 29751273 00-j
- 18. NET ELEC.. ENERGY GENERATED (MWH) ~
~ 559835.009
- 1.912914.00'-
2055069.7.00 l
- 19. UNIT SERVICE FACTOR
.iOO.-00E
- 37.00 57.27
- 20. UNIT AVAILABILITY FACTOR (100'.00' 37 57.27-21.
UNIT ~ CAP. FACTOR (USING MDC NET)-
95.25:
27.64:
- 46191
- 22. UNIT CAP. FACTOR.(USING DER NET) 91165; L26.60
'45.14 23.' UNIT.' FORCED OUTAGE RATE
. 00-4.30.
19.99:
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHG (TYPE, DATE; AND-DURATION'0FLEACH):
V 25c IF SHUTDOWN AT' END. OF REPORT' PE'tIOD, ESTIMATED - DATE '0F STARTUUPi 5
H
- 26. UNITS IN TEST STATUS (PRIOR'TO COMMERCIAL OPERATION): FORCASTm ACHEIVED L
INITIAL ~ CRITICALITY
---,--~~\\'
r--~~~~
' INITIAL ELECTRICITY-
~~--:.-
L--~~~'
LCOMMERCIALSOPERATION L---------
.--s-+++
m j
I'
~
1:.' i b; - 9
~
j 4
h s..
?f
~
?
- s. _
DOCKET NO.: 050-0325 UNIT: Brunswick 1
.DATE: --January 1986 COMPLETED-BY: Frances ~ Harrison.
OPERATIONS
SUMMARY
c BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 100 percent availability factor for the month' of' December with a 95.25 percent capacity factor. There were three power reductions. Details are in the Unit-Shutdowns'and Power: Reductions sheet.
There are 840 BWR and 160 PWR spent-fuel bundles in the Brunswick Unit.1 fuel pool.
N i
i e -
l
- u
. =..
a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.'
050-0325 UNIT NAME Brunswick I DATE January 1986 COMPLETED BY._ Frances Harrison REPORT MONill December 1985 TELEPHONE 919-457-9521 f =u. 5 E
-i?
g X
Licensee
[v, Cause & Curreceive DJte h
3 4
2iE Event g7 i
Atsum to
[U
$5 j di g Report e mO Preveni Recurrence d
85-012 851206 F
00 A
5 Reduced power to 80% due to inoperable reed switch position 38 on rod 26-35 in order to move rod to operable reed switch position.
I 3
4 F: Forced.
Reas m-Method:
Exhibit G - Instructiims S: Scheduled A Equipment Failure (Emplain) 1-Manual for Preparation of Data
' 8-Maintenance of Tes 2 Manuel Scram.
Entr> Sheets for Licensee C Refueling 3 Automatic Scram.
Event RepoeilLERi File INURLG-D-Regulator) Restriction 0161) 8-Continuations 1
E-Operator Training & License Emanunation F-Adnunistrative 5-Load Reducttons s
G-Operainmal Eerus IExplain)
(,-Other Eshibii 1 - Same Souru l'8/77)
Il-Othes (E splain)
DOCKET NO.
050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick I DATE January 1986 COMPLETED BY Frances Harrison I
REPORT MONTil December 1985 TELEPHONE 919-457-952I
(
f; Y
u.
5*
Cause & Currective 1
5s E
73y lk' n5cc 5 *.,
gi Ac,jon go 25 4
.2 3 ce Event uv y"-
g' ' '.
{
$5 5
j dj g Repint e
$0 0
Prevent Recurrence s.
6 i
85-014 851214 F
00 F
5 Decreased power due to high.deaerator level and low condensate booster pressure alarm.
4 4
4 i
i
'l i
i 1
2 3
4 F: Forced Reason:
Method:
Exlubit G Instructisms S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scrarp.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repsut ILER) File INUREG-0161)
D-Regulator) Restriction Is-Continuations E4)perator Training & License Examination F Adninistrative 5-Load Reduetions s
G-Operatismal Error IExplain) 6-Other Eshibit 1 Same Source 19/77)
Il-Other (E splaini
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.
050-0325 UNIT NAME - Brunswick I DATE January 1986-COMPLETED BY Frances Harrisorg -
REPOR T MONTil December 1985 TELEPHONE 919-457-9521 5
E 3
[?
h 5 5' Lesensee j%
Cause & Cenrettive 5?
4 2sE Event g7 3
Action to DJ'r
[U
$E 5
jgg Report e mO Prevent Recurrence 6
i 85-018 851222 S
00 B
S Reduced power for rod improvement.
-l l
l' 2
3 4
. F: Forced Reason Method; Exhibit G Instructions S Scheduled A-Equipmen Failure (Emplain)
I-Manual for Preparavion of Data 3-Maintenance of Tess 2-Manual Scrarn-Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report ILER) File INUREG-D-Regulator) Restriction 01611 i-C ntinuations t
E-Operator Training & License Examination F-Adninistrative 5-t.oad Reductions 3
G-Operational Ee os IL: plain) 6-Other Esliibit I - Same Source 19/77) 11 Diher IExplain
i 4
r 1
I CP6L'CO PLANT PERFORMANCE DATA. SYSTEM PAGE 2.l RUN DATE Ci/02/86 APPENDIX D - AVERAGE DAILY POWER LEVEL RPD39 4
.RUN TIME 14.S0:30 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLET ED D t' FRANCES; HARRISON TELEPHONE (919)457-9521 DECEhbER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL j
(MWC-NET)
(MWE-NET) l 1
-10 17
-6 2
-10 10
~5 3
A 3
-9 19
-5 4
~8 20
-5 5
-8 21
-5 l
e 6
G 22
-5 7
-8 23
-5 E
-7 24
-5 f
4 9
-6 25
-S
)
l 10
~4 26
~5 11
-5 27
-5 12
-6 28
-5 13
-6 29
-5
{
e i
14
-5 30
-5 l
l 15
-5 31
-5 t
16
-5 i
1.16 - 8
(
..x J
39.-
p FLANT PCRFORMANCESDATA' SYSTEM'
' PhGE-l2H i
CP&L';CQe JRUN1DATE -Oi/02/06'
' OPERATING DATA' REPORT-RPD36 RUN' TIMEL - 15 t 20 i t ?
BRUNSWICK' UNIT 2 DOCKEToNO. 050-0324 COMPLETED BY' FRANCES liARRISdN OPERATING STATUS TELEPHONE- (919)457-9521'
- a-----
u--------
1.
UNIT NAME: BRUNSWICK tiNIT 2 1 NOTES 1:
- 2. REPORTING PERIOD: DECEMBER 85 t
i
- 3. LICENSED THERMAL POWER (MWT) 2436 i
d' 4.' NAMEPLATE RATING (GROSS nWC) 867.0
.b 15. DESIGN ELECTRICAL RATINC (NET MWE). 821.0 1
'{.
6., MAX DEPENDABLE CAPACITY (GROSS MWE)- 815.0 1 1
7, MAX DEPENDABLE CAPACITY (NET MWE)' 790.0- ' ---------------------------- --*
~
S.
IF CHANGEG OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST. REPORT 4 GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF'ANY (NET MWE)-
- 10. REASONS FOR RESTRICTION IF ANY' THIS:
YR TO CUMUL-MONTH DATE ATIVE 11 HOURS.IN REPORTING PERIOD
- 744.00 8760.00; 89009.00:
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00 7134.84 54512.36.
e
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
'.00
' 00.
14 HOURS GENERATOR ON LINE-
.00 6906.02
-51011.09 15.-UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENEPGY GEN. (MWH)
. 00 15719005.22 96829072.53
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 5193700.00 i 32795404.00-
- 19. NFT ELEC. ENERGY GENERATED (MWH)
-4493.00~
5017525.00- - 31437999.00?
- 19. UNIT SERVICE FACTOR
. 00
-79.75 57.26
- 20. UNIT AVAILABILITY FACTOR
.00 79.75 5'.26' 7
.76 72-.50 44.671
- 22. UNIT CAP. FACTOR-(USING' DER NET)'
.74-69.7.7.
.-42.98
- 23. UNIT FORCED QUTAGE RATE
- 00
'9.37
. -15.48
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS 7(TYPE. DATE, AND' DURATION :0F ~ EACH) t 25.'IF5 SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE 0F START;UPi
- 26. UNITS IN TEST. STATUS-(PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED
'INITI AL CRITICALITY:
INITIAL ELECTRICITY'
- --r
e o
' COMMERCIAL GPERATION
- --~~~--- ~~---- "
4
' t i16 - 7 =
C
..m -
m.
.c
.t u
.m o
__m.,_
r 6
DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: January 1986 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 The unit was removed from service on November 30, 1985, for the refueling /
maintenance outage.
There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
~
4 0
q
't L.j DOCKETNO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswsek II DATE-January 1986 COMPLETED BY Frances Harrison REPORT MONTH Decernher 1985 TELEPHONE 919-457-9521-E E*
~ Ei Latensee
[g g' *,,
Cause & Currective
{,
W Daic
{.
3?
?
2s5 Event g
g$
6.
A'""" ' "
E Prevent Recurrence i
yE E
jgg Report e in O 6
85-078 851130 S
In C
4 NA RC FUELXX Refueling / Maintenance Outage.
Progres s I
2 3
i
-- Reason:
Method:
Exhibit G. instructions F: Forced S: Scheduled.
A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test -
- 2. Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram.
- Event Report (LER) File (NUREG.
0161)
D-Regulatory Restriction 4-Continuations f
E-Operator Training & License Examination F.Adrninistrative 5-Load Reductions s(
G-Operational Error (Explain) 6-Other Eshibit 1. Same Source
- I'8/77)
Il-Ot her (Esplain) l
^
r a /
o CD&L
' Carohna Power & L6ght Company.
Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 January 6, 1986
?
FILE: B09-13510C SERIAL: BSEP/86-0012 i
Mr. J. M. Taylor, Director.
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT
Dear Mr. Taylor:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of December 1985.
Very truly yours,
,6d. (bhaar o
. R. Dietz, eneral Manager Brunswick Steam Electric Plant FH/ag MSC/85-0014 Enclosures cc:
Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. C. F. Lassiter Ms. D. J. Vicks INPO