BSEP-86-0012, Monthly Operating Repts for Jan 1986
| ML20153B624 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 01/31/1986 |
| From: | Dietz C, Harrison F CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| BSEP-86-0012, BSEP-86-12, NUDOCS 8602140363 | |
| Download: ML20153B624 (12) | |
Text
.
DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: February 1986 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
~
BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 100 percent availability factor for the month of January with a 97.69 percent capacity factor. There were four power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.
1EV I, k k B602140363 860131 I
P,DR ADOCM 0 % g4
m._
PLANT PERFORhANCE DATA SYSTEM PAGE i
CP&L CO-RUN'DATE, 02/03/86 APPENDIX D - AVERAGE DAILY POWER. LEVEL RPD39 i
RUN TIME 12:35:50
' BRUNSWICK UNIT i' 1
i
}
' DOCKET No. 050-0325 COMPLETED BY FRANCES HARRISON 2,.
TELEPHONE (919)457-9521' i
JANUARY
.1986 3
i f
' DAY AVG.' DAILY POWER LEVEL.
DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 784 17-772 2
750 18 657 a
l
-3 782 19 740 J
4 767 20-700 5
781 21 780 i
6 782 22 782 i
-7 783 23 782 l
8 783 24 697 n
i i-19; 784 25 775 i
i 10 786 26 783 ii 780 27.
782.
l 12 704 28 759 1
13 785 29-779 i-14 785~
30 776
-15 785 31
.767 1
- 16 783 i
f 1 !6 - 3 m---
g y_
i l
1 j
b CP&L CO.
PLANT PERFORMANCE DATA SYSTEM
~.PAGE ij j.
RUN'DATE 02/03/86 OPERATING' DATA REPORT RPD36 il RUN; TIME. 12i35154 BRUNSWICK UNIT i d'
I DOCKET.NO. 050-0325 j'
COMPLETED BY FRANCES HARRISOh j
-OPERATING STATUS TELEPHONE (919)457-952i l
j:
i NOTES I'
1.. UNIT NAME:.DRUNSWICK UNIT'1 4
i-
- 2. REPORTING PERIOD: ' JANUARY
-86 I
.1 !
I i '
- 3. LICENSED THERMAL POWER (MWT) 2436 l
1 4.. NAMEPLATE RATING (GROSS MWE) 067.0 1
l!
5.
DESIGN ELECTRICAL-RATING (NET MWE). 021.0 t
I'
- 6. MAX: DEPENDABLE CAPACITY (GROSS MWE) 015.0 1 1:
7 MAX DEPENDABLE; CAPACITY (NET MWE)~ 790.0
I i
8..IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,
}
GIVE REASONSI
~
i l
i r
j --
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)-
- 40. REASONS FOR RESTRICTION IF ANY i
i l-t i
[
.THIS YR TD-CUMUL !
MONTH DATE ATIVE !
i.
h
- 11. HOURS.IN. REPORTING PERIOD 744.00 744.00 77009.00-
- 12. NUMBER.0F HOURS REACTOR CRITICAL 744.00 744.00 47575.48
- 13. REACTOR. RESERVE-SHUTDOWN HRS
.00
.00 1647.10 744.00 744.00'
'44881.38 l
i4'.' HOURS _GENERATGR ON LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 11.'
O E
N GY IE kMW 59 374 46 0
5 118.. NET ELEC. ENERGY GENERATED (MWH) 574210.00 574210.00 29132907.00
- 19. UNIT SERVICE FACTOR 100.00 100.00 57.68
.20. UNIT AVAILABILITY FACTOR 100,00.
100.00 57260'
- 21. UNIT CAP. FACTOR-(USING MDC NET) 97.69 97.69 47.39 22 UNIT CAP. FACTOR (USING DER NET) 94.01 94.01 45.60
- 20. UNIT. FORCED OUTAGE RATE
.00
.00 19.72
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHE (TYPE, DATE, AND DURATION OF EACH)
- 25. IF'SHU'TDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START. UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)' FORCAST-ACHEIVED
-INITIAL CRITICALITY
~~
INITIAL ELECTRICITY COMMERCIAL OPERATION
.t.16
-9
DOCKET NO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswick I DATE February 1986 COMPLETED BY Frances Harrison REPORT MONTil January 1986
- i TELEPHONE 919-457-9521 c
[?
j $E Licensee
[ *,
l"3 Cause & Corrective h
Dale i
jj i;
j55 Event gy Action to gU Prevent Recurrence f
E jgg Report e mO H
g 5
86-003 011786 S
00 B
5 Reduce Power to 80% to Perform pts on TCV, MSIV, TSV, and Maintenance on MSR.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explaia) 1-Manual for Preparation of Data B. Maintenance or Test 2 Manual Scrarn.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repor (LER) File (NUREG-0161)
D Regulatory Restriction l-Continuat.ons i
E-Operato
' ining & License Examination F Administrative 5-Load Reductions s
G-Operational Error (Explain)
(,-Other Exhibit I - Same Source pl/77 )
Il Other (Explain)
050-0325 DOCKETNO.
UNIT SHUTDOWNS *AND POWER REDUCTIONS UNIT NAME Brunswick I DATE February 1986 COMPLETED BY Frances Harrison REPORT MONTil January 1986 TELEPHONE 919-457-952I c
}
Licensee j-r, gn, Cause & Corrective
[-
'h j [5 2 E Event a?
O Action to Daic
- E 4
f0 C
j(
5 jd Report e N0 Prevent Recurrence d5 86-004 011886 F
00 A
5 Reduce Power to Troubleshoot Heater Drain Pump IB Problem.
l 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram.
Event ReporI (LER) File (NUREG-0161)
D Regulatory Restriction l-Continuations i
E-Operator Training & License Examination F Administrative 5-Load Reductions 3
G-Operational Eiror (Explain) 6-Other Eshibit I Same Source l'8/77)
Il-Ot her (E xplain)
q J
f i
DOCKET NO. 050-0325 UNIT N AME Brunswick I f
UNIT SHUTDOWNS AND POWER REDUCTIONS DATE February 1986.
TELEPHONE 919-457-952I f
COMPLETED BY Frances Harrison REPORT MONTil January 1986
~.
i u, :
8
=.
e Cause & Corrective Licensee 5%,
3 7
N" DJ
I 2E 4
2 ; a:
Event
?
3 Action to
(
H s-
- s Report e vi o' Eu Prevent Recurrence A
jmg g
oO f
86-006 012486 F
00 A
5 IB Heater Drain Pump Maintenance.
~
l h
E I
2 3
4 C
F: Forced Reason:
Method:
Exhibit G -Instructions l
S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee
/
C Refueling 3 Automatic Scram.
Event ReporI(LER) File (NUREG-l 0161)
D Regulatory Restriction h-Continuations
[
E-Operator Training & License Examin. tion i
F Administrative 5-Load Reductions s
i G-Operational Error (Explain) 6-Other Exhibii 1 - Same Source i
I 19/77)
Il-Other ( Explain t l
[
DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME Brunswick I DATE February 1986 REPORT MON 111 January 1986 COMPLETED ay Frances Harrison TELEPHONE 919-457-9s?I e.
E E
jE 3
-* Ei Licensec
,Ew Cause & Correceive
_j No.
Date R
5g 4
2s5 Ev'ent 3,7
^' **'"
$5 5
j;f3g Repost a mO EU Prevent Recurrence H
g 6
Reduce Power Due to Control Rod 86-008 012886 F
00 A
5 Drift Problem.
I 2
3 4
F: Forced Reason:
Method:
Exhibis G - Inst ructions S: Scheduled A-Equiprnent Failure (Explain) l-Manual for Preparanion of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report iLER) File INUREG.
0161)
D-Regulatory Restriction 4-Continuatlons Eoperator Training & Ucense Examination F-Administrative 5-toad. Reductions 5
GOperational Error (Explain) 6-Other Exlubis I - Same Source 19/77)
Hother(Explain)
DOCKET NO.:
050-0324 UNIT:
Brunswick 2 DATE:
February 1986
. COMPLETED BY:
Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 l
The unit was removed from service on-November 30,- 1985, for the refueling /
maintenance outage.
There are 1168 BWR and 144 PWR spent fuel. bundles in the Brunswick Unit 2 fuel pool.
- 560_ bundles have been moved to spent fuel' during refueling.
i P
CP&L'CO PLANT PERFORMANCE DATA ~ SYSTEM PAGE 2,
tRUN DATE 02/03/86 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39
-. R U N ' T I M E 12:35:50 BRUNSWICK UNIT 2 i
DOCKET NO. 050-0324 a
I.
COMPLETED BY FRANCES HARRISON l,
TELEPHONE-(919)457-9521
[
' JANUARY
'1986
~
-DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL
- i
-(MWE-NET >
(MWE-NET)
-1;
-5 17
~5 i
2'
-5 18
-5 3
-5 19
-4 4
-5 20
-4 5
-5 21
-5 4
6
-5
'22
-4 7
-4 23
-4 I-8
'-5 24
~4 1
i 9-
-5 25
-4 4
10
~5 26
-4
{
i1
-5 27
-5 12
-5 26
-5 7
0 13
-5 29
-4
~
-5 30
-4 7
}
.1 -4 i
l '.
15
-5 31
-4
[-
-16
~5 i;
i i
f J-I<
i 1.16 - 8 V
4 6
L
PLANT PERFORMANCE DATA SYSTEM PAGE 2;
CP&L'CO.
.0PERATING DATA REPORT RPD36 RUN-DATE. 02/03/86 RUN TIME 12:35:54 BRUNSWICK UNIT 2 i
DOCKET NO. 050-0324 i.
COMPLETED BY FRANCES HARRISON s
l OPERATING STATUS 4'
lELEPHONE (919)457-9521
- i. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES i
- 2. REPORTING PERIOD: JANUARY 86 l
1-
- 3. LICENSED THERMAL POWER (MWT) 2436 l
l 4.
NAMEPLATE RATING (GROSS MWE) 867.0 1
1
- 5. DESIGN-ELECTRICAL RATING (NET MWE) 821.0 1.
l.
~6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 815.0 i 1
- 7. MAX DEPENDABLE CAPACITY (NET MWE) 790.0-8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 iHRU '7) SINCE LAST REPORT, j
GIVE REASONS:
- 9. POWER LEVEL TO WHICH REisiRICTED'IF ANY (NET MWE)-
- 10. REASONS FOR RESTRIOTION IF ANY THIS fR TO
'CUMLIL MONTH DATE ATIVE i
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 09833.00
' 12. NUMBER OF HOURS REACTOR CRITICAL
.00
.00 54512.36;
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE
,00
.00 51011.09
- 15. UNIT RESERVE SHUTDOWN HOUR 5
.00
.00
.00;
- 16. GROSS THERMAL ENERGY GEN. (MWH)
.00
.00 98829872.53-
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00
.00 32795434.00
- 10. NET ELEC.' ENERGY GENERATED (MWH)
-3550.00
-3550.00 31434449.00
- 19. UNIT SERVICE FACTOR
.00
.00 56.78
- 20. UNIT AVAILABILITY FACTOR
.00
.00 56.78
.60
.60 44.29
- 22. UNIT CAP. FACTOR (USING DER NET)
.50
.50 42.62 i
- 23. UNIT FORCED OUTAGE RATE
.00
.00 15.48
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) f
-1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ECTIMATED DATE OF START UP l
- 26. UNITS IN TEST STATUS-(PRIOR TO COMMERCIAL OPERATION)
FOREAST ACHEIVED l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
[
- 1. i 6 -9 t
F
!l DOCKET NO. 050-0324 j
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswietc TT l
DATE February 1986-COMPLETED BY Frances Harrison REPORT MONTil January 1986 TELEPHONE 919-457-9521 5
5 j 5' ~
Licensee h
Cause & Currective
[?
?
Action to No Darc i,
5i 4
2i5 Event gy gV j
E j ;f, g Report e mU Prevent Recurrence g
6 k
85-078 851130 S
in C
4 NA RC FUELXX Re fueling / Maintenance Outage.
Progress 4
l i
I i
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructitms S: Scheduled A-Equipmeni Failure (Explain) l Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entr> Sheets fur Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-0161)
- D Regulatory Resitiction i-Continuations t
E Operator Training & License Examination F Administratise 5-Load Reductions 5
G-Operational Error (Explain)
(,-Other Exhibit 1 - Same Source 19/77) li-Other (E xplain t
L
~
l GA&L
~
Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 3, 1986 FILE: B09-13510C SERIAL: BSEP/86-0012 Mr. J. M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washfugton, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT l
Dear Mr. Taylor:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam l
Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submita l
the report of operating statistics and shutdown experience for the month of January 1986.
Very truly yours, MT C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/ag MSC/85-0014 Enclosures cc:
Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. C. F. Lassiter Ms. D. J. Vicks INPO
' I
_ _ _ _ _ _