ML20137D605
| ML20137D605 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/13/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20137D610 | List: |
| References | |
| NUDOCS 8601170046 | |
| Download: ML20137D605 (2) | |
See also: IR 05000423/1985058
Text
DESIGNATED ORIGINAIi
Certified Eyth khum%
- .
.
JAN 13 N
^
Docket No.
50-423
License No. CPPR-113
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: . Inspection No. 50-423/85-58
This refers to the Preoperational Security Program Review conducted by
Mr. William Madden of this office on September 30 - October 4,1985 of activ-
ities authorized by NRC License No. CPPR-113 at the Millstone Nuclear Power
Station, Unit 3, Waterford, Connecticut and to the discussions of our findings
held by Mr. W. Madden with Mr. L. J. Nadeau and other members of your staff at
the conclusion of the inspection.
The review was conducted to. assess progress on the development and implementa-
tion of the Unit 3 Physical Protection Program. Areas examined during this
review are described in the NRC Region ! Inspection Report which is enclosed
with this letter. Within these areas, the review consisted of selective exam-
ination of your physical security plan and procedural commitments for meeting
the requirements of 10 CFR 73.55.
It also included discussions with key mem-
bers of the site security organization and project engineering staff respon-
sible for the testing and installation of security systems, equipment and
facilities. The inspector confirmed that implementation of the security
program was on schedule.
Certain paragraphs in the enclosed inspection report contain details of your
security program that have been determined to be exempt from public disclosure
in accordance with 10 CFR 9.5(a)(4) (Commercial or Financial Information).
Therefore, the paragraphs so identified in the inspection report will not be
placed in the NRC Public Document Room and will receive limited distribution.
This letter and the remainder of the enclosures will be placed in the Public
Document Room, in accordance with 10 CFR 2.790(a).
l
-
,
fy
ADom
W
a
i
OFFICIAL RECORD COPY
IR MILL 3 85-58 - 0001.0.0
12/30/85
-
!
~ - . _ _
.
- .-
-
=
= . ,
-
-
-
..
.
Northeast Nuclear Energy Co.
2
JAN 131986
'
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
tirf ainal Signed BFA
James H. Joyner
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-423/85-58 (Contains
Commercial or Financial Information (C0FI) in Paragraph 3)
cc w/ enc 1: (w/oC0FI)
V. Papadopoli, Construction Quality. Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
local Dublic Document Room (LPDR)
Nuclea. Safety Informatica Center (NSIC)
NRC Senior Resident Inspector (w/C0FI)
State of Connecticut
4
bec w/ enc 1: (w/oC0FI)
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
G. Walton, SRI, BV-2
T. Shedlosky, SRI, Millstone 1&2
E. Doolittle, LPM, NRR
C. Gaskin, NMSS (w/C0FI)
RI
S
RI OffSS
Madden /ca
Ke's g
Joyner
Ma in
l
IF9 /86
1(/9/85
14/fa/86
1/
85
0FFICIAL RECORD COPY
IR MILL 3 85-58 - 0003.0.0
12/30/85
=
_
_ _,. .. - - .-. - -
-
.
- - - .
-.--
.