Text
i
0lluhicd
'*
s
JAN 0 71996
pukePowerCompany
VATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church. Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT N0. 50-414/85-64
On December 2-6, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-11) for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Pratice," Part 2,
~ Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC's Public Document Room.
.Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-64
cc w/ encl:
HI. L. Dick, Vice President - Construction
L6.'W. Hampton, Station Manager
bec w/ encl:
WRC Resident Inspector
Document Control Desk
d. N. Jabbour, NRR
State of South Carolina
gt g
RII
R
RI
v
PStoddart:jw
kWCline
DCollins
HDance
'1/ 'D/' 86
1/3/26
1/J /86
1/[/86
esiiJEE Sk#
if/
Isoi