a OPERATING DATA REPORT DOCKET NO 50-413 3 ATE March 14. 1997 ~
OPERAi!NG STATUS COMPLETED BY-R.A. Willians TELEPHONE 704-382-5346 1.UnitNase:Catanha1
- 2. Reporting Period: February 1, 1997-February 28,1997
- 3. Licensed Thereal Power (Mil:
3411
-' 4. Naseplate Rating (Gross We): :
1305 Notes'+NaseplateRating
- 5. Design Electrical Rating (Net Welt-
!!45 (6ross Wel calculated as t'
- 6. Itaxinus Dependable Capacity (Gross MWe):
!!92 1450.000 MVA x.90 poser
- 7. Maxleue Dependable Capacity (Net MWel
!!29 factor per Page 111,
' O. If Changes Occur in Capacity Ratings (! tens Nueber 3 Through 71 Since Last NURE6-0020.
Report. Give Reasons
. 9. Power Level To_Which Restricted, if Aay (Net Me):
- 10. Reason For Restrictions, If any:-
This Month. Yr.-to-Date Cueulative f
!!. Hours in Reporting Period
-672.0
-1416.0 -
'102313.0
- 12. Number Of Hours Reactor Was Critical 672,0 1416.0 79649.8-L
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
l-
' 14 Hcurs 6enerator On-Line -
672.0-
~1416.0 78313.8 13.UnitReserveShutdownHours
- - -0--
H-
- 16. 6tess Thereal Energy Senerated ( M H) 2266904 4799979 255503440 l
17.GrossElectricalEnergyGenerated(MH) 817194 1732285 90351691 l
18.' Net Electrical Energy Generated ( MH):
776310
'1646375 B5001741 l
'19.UnitServiceFactor 100.0 100.0 76.5
- 20. Ur.it Availability Factor-100.0 100.0 76.5
- 21. Unit Capacity Factor (Using MBC Net) 102.3 103.0 73.4 22.UnitCapacityFactor-(UsingDERNet) 100.9 101.6 72.6 23.UnitForcedDatageRate 0.0 0.0 7.8 2b Shutdoen Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None 1
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in Test Status (Prior to Coseercial Operation):
Forecast Achieved i
F INiilALCRit!CALITY INITIAL ELECTRICITY COMMERCIALOPERATION 9703190140 970314 PDR ADOCK 05000413J R
PDR e.
h l
l OPERATING DATA REPORT i
DOCKET NO 50-413 UNIT Catawba 1 DATE March 14. 1997 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH February. 1997 LAY AVERASE DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL (MWe-Net)
'(MWe-Net)
I 1171 17 1169 2
1171 19 1170 3
1168 19 1165 t
!!67 20 1166 1169 21 1162 6
1172 22 1164 7
1171 23 1171 8
1172 24 1166 9
!!?4 25 1166 10 1173 26 1166
!!73 27 1161 12 1172 29 1159 13 1171 14 1171 15 802 16 1165
UNIT SHUTDOWMS AWD POWER' REDUCTIONS DOCKET NO.
50-413 UNIT NAME uuawtsa 1 DATE-u.s /14 / 3 f,1iams REPORT MONTH February 1997 COMPLETED BY x.
A.
W11 TELEPHONE t i u s i
.s e z - d.s e d i.
(1)-
(2)
(3)
(4)
(5)
^
R MET-E-
HOD T
A OF LICENSE' N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT-TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 1-P 97-2-15 F
A HH INSTRU "1A" FEEDWATER PUMP TURBINE SPEED SENSOR I
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other--(Explain)
File E-Operator Training & License. Examination F-Administrative (5)
Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
.-_..____1-_--_--______-___--wr,,
s a,-
DOCKET: 50-413 UNIT: Catawba 1 Date: 03/14/97 NARRATIVE
SUMMARY
MONTH: February,1997 Catawba Unit I began the month of February operating at 100% full power. The unit operated at or near 100% full power until 02/14/97 at 2348, when the unit began decreasing power and held at 59% power from 02/15/97 at 0435 to 1618 due to "l A" feedwater pump turbine speed sensor. The unit returned to 100% full power on 02/16/97 at 0244, and operated at or near 100% full power the remainder of the month.
l I
Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
l
l l
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 1 l
2.
Scheduled next refueling shutdown: November 1997 3.
Scheduled restart following refueling: January 1998 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CIIANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: J.93 (b) in the spent fuel pool: 6]2 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---
9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2009 DUKE POWER COMPANY DATE: March 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
e OPERATING DATA REPORT I
DOCKET NO 50-414 DATE March 14. 1997 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Name: Catawba 2
- 2. Reporting Period: February 1, 1997-February 28,1997
- 3. Licensed Thersal Power (MWtli 3411
- 4. Naseplate Ratir.g (Bross MWel:
13058 Notes eNaseplate Rating
- 5. Design Electrical Rating (Net MWel:
!!45 (Gross MWe) calculated as
- 6. Maxisua Dependable Capacity (6ross MWel:
1192 1450.000 MVA :.90 power
- 7. PL: laus Dependable Capacity (Net NWo):
1129 factor per Page 111,
- 8. If Changes Occur in Capacity Ratings (!!eas Nusber 3 Through 7) Since Last NURES-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Period 672.0 1416.0 92329.0
- 12. Number Of Hours Reactor Was Critical 672.0 1416.0 73785.1
- 13. Reactor Reserve Shutdown Hears
- --0--
--0--
- 10. Hours 6enerator On-Line 672.0 1416.0 72662.2
- 15. Unit Reserve Shutdown Hours
--0--
--0-- 16. Gross Thersal Energy Generated (MWH) 2268704 4786054 235498130
- 17. Gross Electrical Energy Generated (MWHI 815419 1722691 83571324
- 18. Net Electrical Energy Generated (MWH) 775109 1638171 78784063
- 19. Unit Service Factor 100.0 100.0 78.7
- 20. Unit Availability factor 100.0 100.0 78.7
- 21. Unit Capacity Factor (Using MDC Net) 102.2 102.5 75.4
- 22. Unit Capacity Factor (Using DER Net) 100.7 101.0 74.5
- 23. Unit Forced Dutage Rate 0.0 0.0 8.6
- 24. Shutdown Schedaled Over Next 6 Months (Type, Date, and Duration of Each):
Re(ueling - March 22, 1997 - 45 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test aatus (Prior to Ceasercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.. _ _ _. _. _ ~
l I
DPERATING DATA REPORT DOCKET NO 50-414 llNIT Catamba 2 DATE March 14. 1997 _
COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 l
l
- MONTH Februarv.' 1997 -
EE AVERA6E DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL (Me-Net)
(Me-Net) 1 1163 17 1164
-2 1163 18 1161 3
!!62 19 1157 4
4 1161 20 1158 5
1163 21'
'1152-6
'1164-22 1156 i
1163 23 1163 8
1163 24 1162 9'
!!64 25 1161 10 1164 26
!!61 11 1164 27 1152 12 1164 29 936 13
!!64
'10
!!64 15
!!64 l'
16 1164 j.-
l l.
. _. _ - - - _ - _ - - _ _ _ _ _ _ - _. - - _ _ _ - _ _ _ _ _. _ _ - - _ - - _ _ _ _ _ _ - - _ _ _ - _ - - - _ - _ ~ _ _ _ _ -
UNIT SHUTDOWMS AND POWER REDUCTIONS DOCKET NO..
50-414 UNIT NAME CArantsa 2 i
DATE us/ _Le / s /
iams REPORT MONTH February 1997 COMPLETED BY x.
A.
will 1
TELEPHONE.
t/us)-sez-dase (1)
(2)
(3)
(4)
(5)
R MET-E HOD f
T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT
.. PREVENT RECURRENCE ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE 1-P 97-2-28 F
A HH PUMPXX "2B" FEEDWATER PUMP TURBINE i
l i
l t
(1)
(2)
(3).
(4)
F Forced Reason-Method:
Exhibit G - Instructions i
S Scheduled A-Equipment Failure. (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licenseei C-Refueling-3-Automatic Scram (LER i
Event Report ( M EG-0161))
i D-Regulato g Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
H-Other - (Explain) (Explain)
G-Operator Error Exhibit I --Same Source i
r f
I
~
I 4
DOCKET: 50-414 UNIT: Catawba 2 i
Date: 03/14/97 t
NARRATIVE
SUMMARY
l.
MONTH: February,1097
. Catawba Unit 2 began the month of February operating at 100% full power. The unit operated at or near 100% full power until 02/28/97 at 1012, when the unit began decreasing power and held at 48% power l
from 2110 to 2245 to repair suspected condenser tube leak in "2B" feedwater pump turbine. The unit began increasing power and ended the month operating at approximately 51% full power.
{
I L-
)
l ls 6
i l
l l
Prepared by: R. A. Williams Telephone: (704)-382 5346 i
?
f 4,
4
--m,-.
MONTIILY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 2 2.
Scheduled next refueling shutdown: biarch 1997 3.
Scheduled restart following refueling: May 1997 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TilROUGH 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereatler require a technical specification change or other license amendment? -
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
t 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
i 7.
Number of Fuel assemblies (a) in the core: J93 (b) in the spent fuel pool: 524 J
2 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9.-
Projected date oflast refueling which can be accommodated by present license capacity:
September 2nl!
j DUKE POWER COMPANY DATE: March 14.1997 i
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l