Q-11 Issue 4 0 Service Pubile FORT ST. VRAIN NUCLEAR GENERATING STATION Page 1 of 7 PUBLIC SERVICE COMPANY OF COLORADOp~m m ew_,

N TITLE:

TEST CONTROL 9 NONiCONTROLLED 13

[y f, COPY L]

~

r=

_ vta8FY issurz m -

i STATUS.WsyH :

I 8

ISSUANCE

/

h PRKHt To ust{ - gj

[// mk/[J 29&

AUTHORIZED

%"Mx=:

"*k BY PORC@2 8 JUL1-d385 EFFECTIVE PORC DATE

'l-15 -9 5 REVIEW 1.0 PURPOSE This procedure describes the testing program and practices employed at the FSV Nuclear Generating Station for safety-related items.

2.0 APPLICABILITY This procedure applies to all activities involved in the designing, prescribing, scheduling, performing and verifying of tests required to demonstrate the conformance of safety-related items to specified requirements.

(U

)

3.0 GENERAL REQUIREMENTS l

3.1 Testing practices employed on safety-related items are required to assure that:

l 3.1.1 All structures, systems and components; whether maintained, modi fi ed,

repaired, reworked or replaced; perform in accordance with expected requirements.

I 3.1.2 All testing is performed in accordance with written procedures incorporating requirements, and acceptance limits specified by design or other appropriate documents.

l 3.1.3 The program provides for, as appropriate, proof tests, pre-operational tests, operational tests, l

and special tests.

8508200266 850006 e'

PDR ADOCK 05000267 Iv)

PDR p

FORM (8)372 22 3642

Q-11 Issue 4 0 SerVlCe" Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 2 of 7 PUBLIC SERVICE COMPANY OF COLORADO l

3.1.4 Test procedures provide for assuring that all l

testing prerequisites have been

met, that l

adequate test instrumentation is used and that a test is performed under suitable environmental conditions.

l 3.1.5 Test results are documented and evaluated by l

qualified individuals to assure test requirements have been satisfied.

l 3.2 SURVEILLANCE TESTING PROGRAMS l

Surveillance testing

programs, as described in l

administrative procedures SMAP-1 and SMAP-2, allow for l

Technical Specification and Non-Technical Specification l

surveillance testing to be performed in accordance with l

approved Surveillance Test procedures.

l 3.3 ROUTINE OR NONROUTINE MAINTENANCE

Tests, as appropriate, are performed by maintenance l

organizations during the course of the work being l

performed.

Such tests are prescribed in maintenance or surveillance procedures or are. scheduled as described by l

Procedure P-7.

These tests are reviewed by QA Services to (n) l identify and specify any appropriate test witnessing or

'V l

data verification requirements.

l 3.4 TESTS REQUIRED BY MODIFICATIONS l

3.4.1 The need for Cold Checkout Tests (CCT's),

l Functional Tests (FT's), or Special Tests (T-Tests) l relating to modification work, is identified by Technical Services and verified by the Work Review Committee.

Technical Services coordinates the l

preparation of CCT's, FT's, and T-Tests with appropriate organizations.

l 3.4.2 Tests required as a conseoiti-of modifications are identified and speciM H NED in Change Notice (CN) documents.

l 3.4.3 CN's are reviewed by QA Services to verify incorporation of appropriate testing requirements.

l 3.4.4 Controlled Work Procedures (CWP), developed to l

facilitate implementation of a CN, are reviewed by QA Services to identify and specify any appropriate test witnessing or data verification requirements, iL/

FORMtC)372 22 3643

Y Q-11 Issue 4 0 Service

  • Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 3 of 7 PUBLIC SERVICE COMPANY OF COLORADO

!nJ l

3.4.5 Completed CN documentation reviews by QA Services verify performance and acceptance of all required tests.

l 3.5 NONROUTINE OR SPECIAL TEST Tests not ccecred by paragraphs 3.2, 3.3 and 3.4 are occassiord iy determined to be necessary. Such tests may be appropriate to verify equipment or component conformance to requirements following rework / repair, to perform a failure analysis to determine cause of a failure, or to determine the extent of performance deterioration of in-service equipment or components.

l 4.0 PROCEDURE Tests required by Modification and Non Routine or Special Tests are accomplished as follows:

RESPONSIBILITY ACTION TEST REQUESTOR 1.

If other than the department responsible for performing the test, prepares an Action Request q

(AR) as described by Procedure G-3.

RESPONSIBLE DEPARTMENT 2.

On receipt of AR, and subsequent to l

review by Technical Services; upon identification of a requirement for l

a test, initiates action to develop l

or obtain the required test l

procedure using the Test Control l

Form, Attachment Q-11A.

l l

3.

Develops required procedure in the I

format and

headings, as l

appropriate, as described by i

Proced;re G-2, Attachment G-28.

l l

4.

Obtains approvals as required by l

l Procedure G-2, as appropriate, in l

l accordance with Procedure G-2, l

Attachment G-2A.

l S.

Signs and dates " prepared by" and l

" reviewed by" sections of the Test l

Control Form, Attachment Q-11A.

l Forwards to QA Services.

10 l

l FORM (Cl372 22 3643 m

Q-11 Issue 4 0 service" Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 4 of 7 PUBUC SERVICE COMPANY OF COLORADO O(G l QA SERVICES 6.

Reviews Test Procedure for adequacy l

and for inclusion of QC l

Hold / Witness

points, as l

appropriate.

Signs and dates l

Review / Concurrence section of Test l

Control Form, Attachment Q-11A.

l Forwards to Nuclear Licensing l

Operations.

l NUCLEAR LICENSING-l OPERATIONS l

7.

Complete the Environmental l

Evaluation and Safety Evaluation if l

required by administrative l

procedure Q-3 and attaches to test.

l Signs and dates l

" Safety / Environmental Evaluation l

Approved" section of the Test l

Control Form, Attachment Q-11A.

l Forward to Technical Services.

l TECHNICAL SERVICES 8.

Reviews the test procedure and l

Safety / Environmental Evaluations.

l Indicates concurrence by signing

,o l

and dating the

()

l

" Safety / Environmental Evaluation l

Concurrence" section of the Test l

Control Form, Attachment Q-11A.

l Indicates if PORC Review and NFSC l

Review is required.

Forwards to l

Nuclear Documents for PORC l

approval, as required.

l NUCLEAR DOCUMENTS 9.

Schedules procedures for Plant l

Operations Review Committee, as l

appropriate.

Forwards approved l

procedure to responsible l

department.

l RESPONSIBLE DEPARTMENT

10. Obtains the Station Manager's l

signature and date on the " Approved l

for Use" section of the Test I

Control Form, Attachment Q-11A.

l

11. Assigns Test Conductor.

l TEST CONDUCTOR

12. Obtains the Test Procedure.

l

13. Reviews Procedure including Data Sheets with persons involved in the test.

i

%s FORM (C)372 22 3643

Q-11 Issue 4 0SerVlCe" Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 5 of 7 PUBLIC SERVICE COMPANY OF COLORADO

\\

l

14. Obtains Clearance (Procedure P-2) and/or Radiation Work Permit (ProcedureP-1) if required.

l

15. Obtains the Shift Supervisor's l

signature and date on the l

" Permission to Initiate Test" l

section of the Test Control

Form, l

Attachment Q-11A.

The Shift Supervisor's signature verifies that:

a)

Plant conditions necessary for performance of the test have been met.

b)

Required Operations personnel are on duty and have been informed the test is to be performed.

c)

Performance of the test will not result in violation of the Technical Specifications.

,,m i

)

d)

Appropriate clearance and/or Radiation Work Permits have been provided, if required.

l

16. Assembles required test equipment, special tools and items specified by the test procedure.

I

17. Conducts test in accordance with the procedure requirements.

Assures that all procedure spaces or data sheet blanks are properly checked or explained and required signatures, initials, dates and data are obtained for each page of the procedure.

l

18. Assures that " Procedure Deviation l

Reports" are submitted for PORC l

Review within 14 days of their l

approval.

l 19.

Promptly informs Shift Supervisor and Department Supervisor of any deficiencies found during the test.

[v FORM (C)372 22 3643

Q-11 Issue 4 Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 6 of 7 0SerVIC9" PUBLIC SERVICE COMPANY OF COLORADO im$d l

20. Prepares a Station Service Request in accordance with Procedure P-7, as appropriate for any deficiencies noted.

l

21. Conducts retest after repair of any deficiencies, if required.

l

22. Compares test results with specified acceptance criteria and determines acceptability of tested item.

l

23. Prepares Test Report, if required.

l

24. Signs and dates the Test Completed I

section of the Test Control

Form, l

Attachment Q-11A.

Forwards to l

Quality Control.

l QUALITY CONTROL

25. Verifies Test was completed l

satisfactorily and/or has taken the l

appropriate action for any

[

discrepancies which were p

l identified.

Signs and dates the Q

l

" Inspection Completed" section of l

the Test Control Form, Attachment l

Q-11A.

Forwards to the Responsible l

Department Supervisor.

l DEPARTMENT SUPERVISOR

26. Reviews Data Sheets and evaluates the
results, any reported deficiencies / malfunctions and Test Conductor's conclusions.

l 27.

Resolves any questions with Test Conductor and approves Data Sheets.

The approval signature verifies acknowledgement of the deficiencies and that any required actions have been taken and logged as l

appropriate.

Signs and dates the l

" Supervisor Review" section of the l

Test Control

Form, Attachment l

Q-11A.

Forwards to the Shift l

Supervisor.

(3 V

FORM (C)372 22 3643

Q-11 Issue 4 0 service Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page 7 of 7 PUBLIC SERVICE COMPANY OF COLORADO

~ b)

'd l SHIFT SUPERVISOR

28. Takes appropriate action, whenever required by reported deficiencies I

or malfunctions.

Signs and dates j

the

" Notification of Test l

Completion and Results" section of l

the Test Control Form, Attachment I

Q-11A.

Forwards to the Station l

Manager.

l STATION MANAGER

29. Reviews the Test procedure package l

for acceptability.

If test results l

may involve NRC reportability per I

10CFR50.72 and 50.73, contacts l

Technical Services.

Signs and l

dates the " Completed Test Reviewed" l

section of the Test Control Form, 1

Attachment Q-11A.

Forwards to l

Nuclear Licensing - Operations.

l NUCLEAR LICENSING-l OPERATIONS l

30. Verifies 10CFR 50.59 review l

complete.

Signs and dates the l

"10CFR 50.59 Review" section of the l

Test Control

Form, Attachment

(

l Q-11A.

Forwards to Record Storage.

5.0 REFERENCES

5.1 FSAR - Appendix B, " Quality Assurance Program for Plant Operation" 5.2 Technical Specification, Section 5,

" Surveillance Requirements" 5.3 Procedure G-2, "FSV Procedure Systems" 5.4 Procedure G-3, " Action Request-Preparation and Processing" 5.5 Procedure P-1, " Plant Operations" 5.6 Procedure P-2,

" Equipment Clearances and Operations Deviations" 5.7 Procedure P-7, " Work Control - Maintenance" 6.0 ATTACHMENTS l

Q-11A Test Control Form DG FORM (Cl372 22 3643

1 Attach. Q-11A

{

Issue 4 1

0 service

  • Public FORT ST. VRAIN NUCLEAR GENERATING STATION Page I cf 1 PUBLIC SERVICE COMPANY OF COLORADO Il l

V l TITLE: TEST CONTROL FORM i

l Type: O FT O CCT O T-Test l Prepared By:

Reviewed By:

l (Preparer)

(Date)

(Supervisor)

(Date) l Review / Concurrence:

l (QA Services)

(Date) l Safety / Environmental l Evaluation Approved:

l (Nuclear Lic. - Operations)

(Date) l Safety / Environmental l Evaluation Concurrence:

l (Technical Services)

(Date) l

,q l PORC Review Required:

O Yes O No PORC #:

i i

1 l NFSC Review Required:

O Yes O No NFSC #:

l Approved for Use:

l (Station Manager)

(Date) j l Permission to Initiate l Test:

l (Shift Supervisor)

(Date) l Test Completed:

l (Test Conductor)

(Date) l Inspection Completed:

l (QA Services)

(Date) l Supervisor Review:

l (Department Supervisor)

(Date) l Notification of Test l Completion and Results:

l (Shift Supervisor)

(Date) l Completed Test Review:

l (Station Manager)

(Date)

[3 l 10 CFR 50.59 Review: