Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings IR 05000272/19990011999-04-0101 April 1999 Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings IR 05000272/19990011999-04-0101 April 1999 Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings IR 05000272/19990011999-04-0101 April 1999 Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings IR 05000272/19990011999-04-0101 April 1999 Insp Repts 50-272/99-01 & 50-311/99-01 on 990117-0307.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number PNO-I-98-057, on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal1998-12-0101 December 1998 PNO-I-98-057:on 981130,util Commenced Shutdown of Salem Unit 2 to Repair 21 RCP Seal.Resident Inspectors Observed Portions of Plant Shutdown & Plan to Observe Continuing Maint Activities on RCP Seal IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support 1999-09-08
[Table view] |
Inspection Report - Salem - 2005017 |
---|
|
|
Text
- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
'
.
APPENDIX B ;
U. S. NUCLEAR REGULATORY COMMISSION REGION IV {
!
l NRC Inspection Report: 50-458/85-19 Construction Permit: CPPR-145 Docket: 50-458 I
Licensee: Gulf States Utilities '
P. O. Box 2951 i Beaumont, Texas 77704 !
Facility Name: River Bend Station !
!
Inspection At: River Bend Site, St. Francisville, Louisiana l Inspection Conducted: March 11-May 17,1985
!
Inspectors: 1 U JId's'
R.'~ Tfylor, Reactor Inspector, Project Section A, Dafte Reactbr Project Branch
/ f]lYb i g,I. BarneA, Reactor Inspector, Project Section A, DMe ReactdrProjectBranch
/
l Approved: . M s/ M _C J.g.J{udon,C flef, Project lection A. Reactor Uate wrojeet Brang1 ,
,
Inspection Summary ,
l Inspection Conducted March 11-May 17. 1985 (Report 50-458/85-19) ,
I i
Areas Inspected: Routine, unannounced inspection of mechanical components !
containmentpenetrations,sitedesigncontrol,licenseemanagementofqua1Ity :
assurance (QA) activities, and licensen action on previous inspection finding }
The inspection involved 251 inspector-hours onsite by two NRC inspector I i
Results: Within the five areas inspected, two violations were identified (
(incorporation of engineering and design coordination report information into i
, drawings, paragraph 2.e; and use of external historical data in evaluation of j suppliers, paragraph 6).
l l t
{jeaj${$ e
!
~ _ _ - _ _ _ _ _ _ _ _ - _ _ - _ - ---- ---_ -
I
'
.
-2-DETAILS 1. Persons Contacted The following persnnnel attended one or more of the exit interviews conducted on April 26, 1985, May 10, 1985, and May 17, 198 An NRC senior resident inspector attended the meetings held on April 26, 1985, and May 10, 198 Culf States Utilities (GSU)
W. J. Cahill, Senior Vice President J. C. Deddens, Vice President T. L. Crouse, Quality Assurance (QA) Manager R. B. Stafford, Director, Quality Services I. M. Malik, Supervisor, Quality Engineering P. J. Dautel, Licensing Staff Assistant L. R. Sutton, QA Engineer G. V. King, Plant Services Supervisor K. C. Hodges, Supervisor, QA Systems R. E. Hebert, Senior Purchasing Agent G. Kelley, Supervisor, Purchasing and Materials R. Callegati, System Engineer, Technical Staff T. W. Over11d, Process Systems Supervisor A. D Kowalcruk, Assistant Plant Manager, Maintenance and Materials G. D. Mahan, QA Engineer B. Bryson, QA Engineer T. F. Plunkett, Plant Manager R. E. Turner, QA Engineer P. D. Graham, Assistant Plant Manager D. R. Gipson, Assistant Plant Manager R. W. Helmick, Director, Projects L. A. England, Supervisor, Nuclear Licensing Stone and Webster (SA.W)
R. L. Spence, Resident QA Manager B. R. Hall, Assistant Superintendent, Field Quality Control (fQC)
G. M. Dyrnes, Asei. tant Superintendent, FQC W. I. Clifford, Senior Construction Manager T. M. Batee, Assistant Superintendent, Engineering H. E. Stuobs, Supervisor, Mechanical FQC T. M. Vears, Lead Structural Engineer D. M. Scheele. QC Engineer The NRC inspectors also contacted other site personnel including administrative, technical, and inspection personne *
.
-3-2. Licensee Action on Previous NRC Inspection Findings Closed (50-458/78-05) Open Items: These open items all centered around NRC followup on a 10 CFR 50.55(e) report dated November 1, 1977, relative to problems identified at a supplier of reinforcing stee These items are closed as a matter of record based on final closure of the 10 CFR 50.55(e) report as documented in NRC Inspection Report 50-458/80-0 Closed (50-458/79-06) Unresolved Item: This item is considered closed based on correspondence related to an NRC Immediate Action Letter dated December 13, 1979.
l I Closed (50-458/80-04) Open Item: Maintenance of nonsafety switchgear.
l This item is considered closed for record purposes since the NRC inspector was stating his intention to follow up on an area of interest which was not within the jurisdiction of the NRC.
l Closed (50-458/80-13) Unresolved Item: Qualification of H.V.
l Electrical Cable
, Closed (50-458/81-09) Unresolved Item: Qualification of NSSS l Equipment i
l Closed (50-458/82-01) Unresolved Item: Qualification of HPCS l Equipment
! Closed (50-458/84-36-11) Unresolved Item: Qualification Records for H.V. Electrical Cable
! The above four items all involving an aspect of the licensee's program l for environmental qualification of electrical equipment are considered l closed for Region IV inspection purposes since the responsibility for the l activity has been assumed by the Office of Nuclear Reactor Regulation as l documented under Section 3.11 of the Safety Evaluation Report related to
'
the Operation of River Bend Station, NUREG 0989.
( e. Closed (458/8436-12) Unresolved Item: Drafting errors in incorporation of Engineering and Design Coordination Report (E&DCR) information into l
<
drawing Apparent drafting errors in incorporation of E&DCR information into design drawings with respect to cable tray supports AB 375 KS-1, FB 183 KS-1, and AB 572 S-1 were identified in NRC Inspection Report 50-458/84-36 as an unresolved item. The report additionally indicated that S&W had agreed to research these errors further and identify the possible generic scope of the problem. Followup of this unresolved item during this inspection revealed that Engineering Assurance (EA) had performed a surveillance (i.e., EA Surveillance #32) on November 27, 1984, with respect to this subject. Examination of the surveillance report dated December 17, 1984, I
.
-
,
-4-showed that the auditor had selected a sample of 21 E&DCRs which affected various 340 series EE drawings. The surveillance ascertained that approximately 33% of the sample reflected apparent incorporation errors or omissions on the drawing / tab sheets. EA concluded that the NRC inspector's observations could not be regarded as an isolated occurrence and recommended that the last major incorporation of E&DCRs into electrical drawings be reviewed for accuracy and identified errors be corrected. Review of the response dated March 13, 1985, to EA Surveillance #32 showed, however, a commitment by the Cherry Hill Operations Center electrical design group to only correct errors associated with the E&DCRs identified in the surveillance repor The NRC inspector was informed during review of this subject that the EA surveillance program was an additional activity to the committed EA audit program and was not addressed by a written procedure. Formal criteria had therefore not been established in regard to surveillance performance and review and acceptance of
,
corrective action responses to surveillance findings. As a result of the apparent failure to assess the scope of E&DCR incorporation errors in electrical drawings and perform required corrective actions, the unresolved item has been closed and replaced by an apparent violation (458/8519-01).
3. Mechanical Components The purpose of this inspection was to examine the entire process of purchasing, source and/or receipt inspection, maintenance and installation of a selection of mechanical components typical of a broad range of similar components utilized in safety-related systems. The goal of the inspection was to determine whether the process complied with NRC requirements and licensee commitments including compliance to the ASME Boiler and Pressure Vessel Code,Section II The components selected, their respective safety classes, and relevant documentation reviewed follow; Standby Liquid Control System Pump C41*PC001, Class II The NRC inspector reviewed General Electric (GE) Purchase Specification 21A1921, Revision 4, Data Sheet 21A1921AE, Revision 2 and Drawing 10505648, all of which describe an electric motor driven positive displacement pump that meet the commitments contained in FSAR Section 9.3. Certifications were available from GE, the vendor, and the ASME that all requirements of the purchase specification had been satisfied. The manual was found to contain recommended practices for maintenance and instructions for installatio Review of the S&W Equipment Storage History Card for the component established that the requirements provided the craft maintenance force were comparable to the practices recommended by the vendor. Field QC inspection reports indicated that the maintenance work had been accomplished. Review of QA Inspection Plan R1229160F05240A01 and associated inspection reports . - _ - . . _ -_ - - - . - - _ - _ . . . - - . - - - . - . -_
i
'
.
l' t
'
-5- i
!
indicated the installation work had been done and verified in !
l- accordance with the manufacturer's requirements. The NRC inspector's ,
i examination of the installed components did not reveal any l l inconsistencies with these instruction i i
l
'
b. Mainsteam Safety-Relief Valve 1821*F041G, Class I The NRC inspector reviewed the following GE documents which establish I requirements for the above and like valve ,
(1) 22A6441, Revision 3: Specification for S/R Valve OS i
! (2) 21A9538, Revision 2: Safety-Relief Valve Purchase !
Specification Data j (3) 21A3530, Revision 0: Specification for Valve Actuators, '
l Safety-Related, Pneumatically Operated f (4) 767E897, Revision 3: Purchase Part Drawing - Safety Relief i
- Valve !
l The NRC inspector reviewed the vendor supplied installation and l
.
'
maintenance manual and found that the vendor statement of valve performance characteristics was comparable to the above i specification requirements and were found to be comparable to the r i commitments pertaining to the family of valves contained in FSAR -
Section 5.2. The vendor stated in the manual that no in-storage .
maintenance was required. The vendor provided instructions for l
- tightening the two flanged connections and for installation of [
[ electrical and pneumatic connections to the actuator attached to the I
'
valv The NRC inspector reviewed the vendor quality data package and I i the code data form which indicates'that the valve met the t specification and ASME Code requirements, j The NRC inspector reviewed QC records pertaining to the setting of the l
! valve (installation) and torquing of the bolts in the flanged connections and found that the work had been accomplished as .
recommended by the vendo Visual examination of the installed i q -
valve revealed no inconsistencies with.the above requirement t Y c. Mainsteam Isolation Valve 1821*F028A, Class I f
I The NRC inspector reviewed the following GE document pertaining to s
<"
( !
L' the above identified valve: .
l (1) 21A9506, Revision 5: Purchase Specification for Valve, MS !
!
(2) 10504935AT, Revision 0: MSID Data Control Sheet j i
(3) 10504935, Revision 8: Purchase Part Drawing i
i
I r
I !
U
, _ _ _ _ _ _ _ _ _
.
-6-l The commitments contained in FSAR Section 5 were found to be . l satisfied by the requirements imposed by the above documents. The NRC inspector reviewed the vendor's quality documentation and the code data form which indicated that the valve conformed to the above specifications. Review of the vendor manual indicated that *
in-storage maintenance should include a quarterly inspection of the .
valve packaging and a yearly replacement of the vapor phase '
inhibiting covering. Review of inspection reports indicated the i
'
quarterly inspection had been accomplished and the phase inhibitor was replaced as recommended. Review of inspection reports pertaining to field welds FW-A7 and FW-A8 as shown on drawing
~
1-MSS-600, Revision 21, revealed that the valve had been installed ,
during August and September 1982, the only principal installation l action involved. The NRC inspector's examination of the installed valve did not reveal any inconsistencies with the above documentation, d. Standby Liquid Control System Valve IC41*F004, Class I The NRC inspector reviewed the following GE documents pertaining to -
the component:
(1) 21A9370, Revision 6: Purchase Specification (2) 21A9370AB, Revision 7: Purchase Specification Data Sheet ;
(3) 1101434: Drawing - Outline These documents describe a positive zero leakage valve which can only be opened by an electrically activated explosive squib installed into the valve body. The data generally satisfies a functional description contained in FSAR 9.3 and would also satisfy the requirements for a Class I valve as contained in ASME Code,Section III. The NRC inspector reviewed the vendor's quality documentatica and the code data report which indicated that the valve satisfied all requirements of the above specifications. Review of the vendor's manual indicated no in-storage maintenance was required. Inspection reports pertaining to Drawing 1-SLS-006, Revision 6 showed that upon installation, the flanged connections had been tightened to prescribed torque valves. The NRC inspector verified that the valve was installed and had no indications of damage or deterioratio ,
e. Fuel Pool Cooling Heat Exchanger ISFC*E1A, Class !!!
The NRC inspector reviewed S&W Specification 223.312 with addenda to No. 7 dated February 2, 1982. This specification stipulates that the heat exchanger should meet performance requirements that are equivalent to those provided in the FSAR Section 9.1. In addition, the specification requires the component be designed, fabricated, tested, and certified in accordance with ASME Section III,
!
!
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
f
!
'
.
-7- <
Subsection N The NRC inspector selectively reviewed material test [
reports and other quality data along with the code data report and the certification by S&W Procurement Quality Control that components met all requirements. The documentation reviewed satisfied code and l specification requirement l The NRC inspector reviewed the vendor furnished " Installation, l Operation and Maintenance Instruction." Maintenance inspection was i recommended bimonthly for evidence of contaminates and monthly for :
condition of desiccant. The NRC inspector noted during review of f Specification 223.312, Addendum 7, that the component design had j been changed such that sealed covers were installed on nozzles to ;
allow for use of a nitrogen purge other than using desiccants to keep the interior of the component dry. The change reflected that i Specification 229.170, " Storage and Maintenance of Permanent Plant Equipment," would be utt11 zed as the inspection requirement. This specification requires a quarterly inspection of heat exchangers for '
attributes detailed on an Equipment Storage History Card. The NRC i inspector verified by review of inspection reports that the .
'
component had been under continuous purge untti piping was connected to the nozzles of the unit based on quarterly inspection l The NRC inspector reviewed inspection documentation pertaining to f fabrication of the lower and upper component supports, Drawings l 1-SFC*Sup.1AB, Revision 4, and 1 5FCaSup. IA, Revision 5, respectively. The documents indicated that all work had been [
accomplished and accepted by QC in January 198 !
The NRC Inspector verified that the component was in place and '
connected to piping but could not examine the unit or Its supports due to the facility design and a lack of scaffolding that would '
facilitate acces No violations or deviations were identified in the overall inspection [
are '
4. Containment penetrations
The NRC inspector examined procedures for and records of the receipt, l storage, and installation of one electrical penetration assembly and one i process piping penetration as reasonably representativo of activities in i this general are l f
'
The eltctrical penetration assembly was identified as 1RCp*LV105A. This component carries safety-related instrumentation cab 11ng for the " red" j i segregated train. The NRC inspector initially reviewed the applicable
- component specification, 241.211 Revision 1, to establish the technical (
i
'
requirement The pressure boundary portion of the assembly was required to be designed, fabricated, tested, and certifled in accordance with the ,
1977 (with amendments to summer 1979 version of) ASMC Section !!!,
'
l 1 l
!
i
! i
'
.
-8- !
!
Subsection N The NRC Inspector then reviewed the vendor, Conax Corporation, manual describing storage and installation requirements for the component. The vendor records were examined and it was found that pressure boundary of the ASME pressure test had been conducted and all other ASME requirements had been satisfied as attested to by a code data report dated July 1, 198 The specification required leak rate test was performed on July 16, 1981, with a member of S&W Procurenient QA as a witness. The component was received onsite on July 30, 1981, as ;
documented by Material Receiving Report 81-13267 and provided with appropriate warehouse storage until it was installed on November 7, 198 !
The NRC inspector examined Equipment Storage History Card No. 667 and .
found that maintenance both prior to and af ter installation had been l carried out as recommended by the vendo The S&W QA Plan No. R1999999507, RevisionA,documentedtherequirementsofthevendorforInstallatio ;
Inspection Report E1100114 documented inspection of the installation in accordance with the attributes specified by the QA plan. The NRC inspector noted that several Nonconformance and Olsposition Reports were issued following installation, which documented a shorted feed through tube in ,
'
one module of the penetration, a general problem with nicked conductc,rs and unsatisfactory butt splices in the pigtall connection Engineering i and Design Coordination Reports C25074, C25074A, and C250420 documented investigative and corrective actions for these problems that provided .
satisfactory resolutions to these problem I The NRC Inspector chose pipe penetration 1KJB*Z8 as typical of its typ This penetration is essentially a 20 Inch pipe of standard wall 10 feet long with a collar welded approximately 9 inches from one end, which at installation is welded to the containment vessel proper. The penetration ,
serves to carry water from the suppression pool in containment to the high pressure core spray pump located outside. The NRC inspector found i that Graver Tank and Manufacturing Company had furnished the component in accordance with Specification 219.710 Revision 12, both of which were reviewe Manufacturing records indanddrawingEV-1Klcatedth
,
had been heat treated, radiographed, and hydrostatically tested in the period of June through October 1981 in accurdance with the ASME Code, Section !!!, Subsection NE, 1974 as required by specificatio ,
No violations or deviations were identified in this inspection are <
0. Sito Dosion Cnntrn1 l The scope of this inspection was to review compliance of current design l change control activities with program commitments. The results of two ,
'
areceding inspections of site design control activities are documented in !
1RC Inspection Report Nos. 50 450/85 10 and 85 12. The examples noted by the NRC Construction Appraisal Team of what were termed isolated deficiencies in design change control were considered during performance ;
of the Inspection. The NRC inspector reviewed the design change control ;
program requirements contained in procedure R0p 12.0 13 through Change
>
'
Notice No. 4 dated March 20, 1985, "En0ineering & Design Coordination
!
l
{ l
--
'
.
. Report Procedure," and Engineering Assurance Procedure 6.5, Revision 0 through Change Notice No. I dated July 27, 1984, " Preparation, Review, Approval, and Control of Engineering and Design Coordination Reports -
Computerized Logging and Tracking System." Twenty-seven E&DCRs (i.e.,
C31701, C31703, C31704, C31706, C31707, C31712, C31739, C31751A, C31773, C25539, C25540, C25542, C25545, C25568A, C25580, C25587, C25589, C25590, C25593, P12950, P12957, P12960A, P12961, P12967, p12990, P129910, and P13042C) were reviewed with respect to apparent adequacy of dispositions, compliance of processing with program requirements, and reficction of correct status in the computerized tracking system. Dates of current revision of affected drawings were compared against approval dates of unincorporated EADCRs and a computer printout of construction completion status, to assure that all available EADCRs had been incorporated at the time a drawing revision was mad Within this area of the inspection, no violations or deviations were identifie . Licensco Managnment of QA Activitics QA Program: The NRC inspector reviewed Chapter 17.2 of the FSAR through Amendment 16. " Quality Assurance During the Operations Phase," and Chapter 17.1 of the Preliminary Safety Analysis Report (PSAR), Revision 2. " River Bond Station Construction QA Program."
The scope and adequacy of the documented QA program were assessed by review of the following sample of QA and related procedures:
- QAl-2.0, Revisfon 0 through Change Notice 2.0-0-2, approved January 31, 1985 " Planning and Scheduling GSU Quality Assurance Audits and Surveillances"
- QAl 2.1, Revision 1 through Change Notice 2.1-1-1, approved November 14, 1984, " Audit Performance and Reporting"
- QAl 2.2, Revision 5 dated March 27, 1985, "QA Review of Procurement Documents"
- QAl-2.4, Revision 0 dated September 23, 1981, and Rt: vision 1 through Change Notico 2.4-1 2, approved March 8, 1985, " Quality A9suranco Evaluation of Supp1 tor / Contractor QA Programs"
- app QAl 2.7, Revision November 1 through 14, 1984, " QualityChange Notico Surveillance of 2.7-1 Supp11l ors ' roved
- QAl-2.11, Revision 0 dated December 11, 1981, and Revision j through Chango Notice 2.11 3 1, approved March 8, 1905,
" Qualified Suppliers List" e QAP 1,3, Revision 2 offcctive January 29, 1985, " Indoctrination, training, Qualification and Certification of Quality Assuranco Audit /Survelliance Personnel"
_ _ _ _ _ _ _ _ _ - - - - _ _ _ _ _ _ -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
.
,
-10-
- QAP-1.7, Revision 0 effective August 24, 1984, "QA Trend Analysis Reporting"
- QAP d.8, Revision 1 effective July 3, 1984, " Processing Corrective Action Reports (CAR) to Management"
- QAP-1.9, Revision 1 effective September 4, 1984, " Initiation and Processing of Stop Work Directives"
- QAP-1.10, Revision 1 effective March 5, 1985, " Reporting of Status of Open Items to Management"
- ADM 0004, Revision 6 effective January 31, 1985, " Procurement of Items and Services"
- ADM-0034, Revision 1 effective January 4, 1985, " Industry Experience & Technical Document Review"
- Project Procedure RBPP 4.1, Revision 1 effective May 7, 1982,
" Processing NRC Correspondence"
- PEP-0007, Revision 3 through Temporary Change Notico 85-042, approved March 19, 1985, " Technical, Quality and Documentation Requirements for Purchase Requisitions" The NRC inspector interviewed the QA Hanager and Director, Quality Services with respect to irrplemented and planned changes in organizational structure and responsibilities, staffing plans, and QA policies. Changes to two procurement related procedures, QAl- and QAl-2.11, from original issue to current version were assessed and a review rnade of the findings contained in the document, " Combined Utl11ty Assessment of Gulf States Utilities QA Program," which was performed during September 24-28, 1984. The NRC inspector also reviewed the QA subject material contained in the document, "!NPO Corporate Assistance Visit to Gulf States Utilities," which was performed during October 22-26, 1984. The approach and status of the QA trend analysis system was discussed with responsible QA personnel and a review made of the initial draft repor Within this area of the inspection, no violations or deviations were identiffe b. Desijn: The NHC inspector reviewed the following documents in FeliardtoGSUauditsoftheS&Wdostonprocess: (1) PSAR 17.1.18A, (2) Regulatory Goldes 1.28,1.33,1.144, and 1.146; (3) QAl-2.0, Revision 0 through Change Notice 2.0 0 2 " Plan OSUQualityAssuranceAuditsandSurveillances;ningandScheduling and (4) QAl 2.1, Revision 1 through Change Notice 2.1-11, " Audit Performance and Reporting." four quarterly CSU audits of S&W site activities (i.e. , G50 Audit Nos. SWCli/IIVAC-8S/04, S&WS PPf185/03, SSWS 84/12,
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,. .
-11-and SWSP-84/09) were reviewed with respect to audit plan and procedural requirements, of which SSWS-84/12 included site design activities in the audit scop Similar reviews were performed of two semiannual GSU audits (i.e., GSU Audit Nos. SWCH-84/11 and SWCH/ MISC-85/04) of the S&W Cherry Hill Operations Center and a GSU audit, GSU Audit No. SSWT-84/12, of S&W Toronto. Each of these three audits included design in the audit scope. The qualification records of eight GSU auditors were reviewed relative to the requirements of GSU Procedure QAP-1,3, Revision 2, " Indoctrination, Training, Qualification and Certification of Quality Assurance Audit / Surveillance Personnel."
The NRC inspector reviewed GSU Project Procedure RBPP 4.1, Revision 1, " Processing NRC Correspondence," with respect to evaluation and tracking of required actions resulting from receipt of NRC Information Notice Procedure compliance was assessed by review of the status and actions taken with respect to Information Notice Nos. 83-20, 83-28, 83-63, 83-80, 84-50, and 84-7 Within this area of the inspection, no violations or deviations were identifie c. Procurement: The NRC inspector was informed on commencing review of U5U procurement controls, that procurement of spare parts was in the process of transition from GSU direct procurement to utilization of Nuclear Parts Associates (NuPA) for supply of spare and replacement parts. From review of the NuPA QA program, the NRC inspector ascertained that NuPA would utilize the QA programs and QA organizations of its parent companies (i.e. , Gti and S&W) for vendor qualification, audit, and surveillance activitie On completion of the transition, GSU procurement activities for parts would be limited to definition of purchase requisition requirements. GSU QA personnel indicated that procurement of services would remain as a GSU activit The NRC inspector compared the requirements of the procurement procedures identified in paragrapn 6.a above against the guidance contained in ANSI N45.2.13 and Regulatory Guide 1.123. Responsible QA supervisors were interviewed with respect to their understanding of respective responsibilities for procurement document review and evaluation, audit, and surveillance of vendors. The purchasing function's knowledge of types of procurement requiring QA review was confirmed by interview of the lead purchasing agent. Eight vendors currently identified on the Qualified Suppliers List (QSL) were selected for review of GSU compilance to the requirements of procedure QAl-2.4, Revision 1 through Change Notice 2.4-1-2, approved March 8, 1985, " Quality Assurance Evaluation of Supplier / Contractor QA Programs." The NRC Inspector included in this sample two vendors (f.e., Transamerica Delaval Engine and Compressor Division and llayward Tyler Pump Company) for which the NRC had previously identified quality assurance problem . 4
,
-12-Review of the Transamerica Delaval evaluation file showed memoranda prepared by a QA System engineer and his supervisor relative to the initial evaluation of the vendor for supply of spare and replacement part The QA engineer's memorandum reflected acceptance of the vendor's QA Manual and cognizance of both equipment problems reportec to the NRC and the results of two followup NRC inspections at the vendor facilit The memorandum additionally recommended that, if the vendor was to be included on the QSL a prior facility survey and/or source inspections prior to release of shipments be performe The supervisor's memorandum dated December 2, 1983, approved Transamerica Delaval on the basis of the acceptability of the documented QA program, GSU involvement in prior S&W audits of the vendor, and the ability to perform source and receipt inspection The memoranda were referenced in the supplier certification forwarded to Purchasing, but mandatory source inspection was not specifically identified as a procurement document requirement. Review of 1984 and 1985 purchase orders to Transamerica Delaval for parts did not show any provisions for source inspection at the vendor facilit Review of the Hayward Tyler evaluation file showed that the vendor was approved on September 19, 1983, on the basis of QA Manual review and analysis of S&W audit records. The approval was unconditional and did not reflect any required procurement actions resulting from the issue of IE Bulletin 83-05 dated May 13, 1983, pertaining to this vendor. The NRC inspection report referenced by IE Bulletin 83-05 was present in the evaluation fil Review of procurement records did not indicate that any spare parts had been ordered by GSU from this vendo Subsequent to this inspection, additional information in this subject area was forwarded to Region IV by the NRC Vendor Program Branch (VPB).
This information was obtained by the VPB during a visit to the River Bend site in regard to NuPA activities. VPB pers'onnel indicated that Guildline Instruments were placed on the active QSL on December 1982 following completion of corrective actions required by a December 1981 survey. The corrective actions consisted of preparation of a QA Manual and procedures. Procedure QAI-2.4 requires an annual evaluation be performed of suppliers. The December 1983 annual evaluation of this vendor was based on a survey by another utility which identified numerous omissions in the QA program and lack of documented evidence of performance of QA activitie The vendor was maintained on the QSL without any apparent actions in regard to the utility survey finding Paragraph 3.9 in Procedure QAI-2.11, Revision 3 dated December 19, 1984,
" Qualified Supplier List," provides for conditional approval of suppliers whose quality programs have been found to not meet specified requirements. Subparagraph 3.9.2.b shows, as an example, evaluations based on historical data from sources such as CASE, architect engineers, NRC Inspection Reports / Bulletins / Notices, and other t __
r -
'
'
,
-13- i
<
utilities, in which these sources have identified problem area Conditional approval is permitted for this example, provided either source inspection's stipulated in the procurement document, or if the problems are not believed sufficient to warrant source inspection, adequate followup corrective action is specified and can be verifie Paragraph 3.5 of this procedure requires annual evaluations per
.
QAI-2.4 to determine _whether their approved status should be maintained, modified, or revoked. The evaluations are required to be based on the review of the supplier's performance history, audits, surveillances, NRC Inspection Reports, receiving inspections and any other supplier information availabl Revision 0 of this procedur dated December 11, 1981, was ascertained to not include provisions for conditional. approval of suppliers and was not as specific in regard to annual evaluations; i.e., paragraph 3.5 states, in part, " . . . The annual evaluation shall be based on the review of suppliers performance, audits and/or surveillances performed."
The continuing approval of vendors with identified QA deficiencies, without implementing actions to assure their effective control of quality, is an apparent violation (458/8519-02).
The NRC inspector additionally noted other minor isolated deficiencies
- during review of the QSL and vendor evaluation files. The QSL was not uniform in its identification of vendors approved for furnishing parts subject to the rules of Subarticle NCA-3800 in Section III of the
~
ASME Cod For example, Pyco was denoted as being approved for supply of thermowells. Review by the NRC inspector established that thermowells are installed in Section III piping systems and would be accordingly subject to NCA-3800 requirement On examination of receiving inspection reports for purchase orders (P0s) to this vendor, the NRC inspector ascertained, however, that receiving inspection personnel had identified that the vendor was not appropriately approved for supply of Section III material This subject is considered an open item pending review of the NuPA program and GSU/NuPA interface (458/8519-03). The NRC inspector also observed a few examples of documents, which were required by procedure to be maintained in the-working files, that were missing; e.g., a copy of the Velan ASME Certificate of Authorization and an evaluation checklist for Aloyco were not in the vendor files. A copy of the Velan ASME Certificate was placed in the file prior to the end of-the inspectio The NRC inspector reviewed seven P0s and applicable purchase requisi-tions for compliance of processing and content to QA program requirements. Receiving inspection reports and vendor documentation for received items were examined to ascertain adequacy of receiving inspection review of vendor documentation review. No violations or deviations were identified in this area of the inspection.
l r
. - - . . - - , . . . - . - .
.. -
,
3 ,
.
%4
, - , , o-14-7. Exit Interview-e i Exit interviews were conducted during the inspection on April 26, 1985, and May 10, 1985, and at the conclusion on May 17, 1985. Personnel
- attending one or more of these exit interviews included those personnel denoted in paragraph 1 of this report. At these exit interviews, the NRC inspectors sumarized the scope and findings of this inspectio i
..
l-l 1: