ML20136H131
| ML20136H131 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/01/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20136H136 | List: |
| References | |
| NUDOCS 8508200196 | |
| Download: ML20136H131 (2) | |
See also: IR 05000311/2005017
Text
,
!
!
l
'
'-
t
,
AUG 011985
j
l
'
l
In Reply Refer To:
i
Docket:
50-458/85-19
l
,
1
i
Gulf States Utilities
ATTN: WII11am J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
8eaumont. Texas 77704
,
l
Gentlemen:
This refers to the inspection conducted by Messrs. R. G. Taylor and I. Barnes of
this of fice during the period March 11-May 17,1985, of activities authorized by
i
NRC Construction Permit CPPR-145 for River Bend Station, and to the discussion
'
of our findings with you and other members of your staff during and at the
conclusion of the inspection.
Areas examined during the inspection included mechanical components,
t
containment penetrations, site design control, and licensee management of
l
quality assurance activities.
Within these areas, the inspection consisted of
,
l
selective examination of procedures and representative records, interviews with
i
personnel, and observations by the inspectors.
These findings are documented
l
in the enclosed inspection report.
l
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
,
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10 Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
'
i
Violation enclosed with this letter.
t
We have also examined actions you have taken with regard to previously
i
identified inspection findings.
The status of these items is identified in
l
paragraph 2 of the enclosed report.
!
.
/
ht./
~
[
k
i
r
.
IV:Rr81/A
RP81/A
RPB A,
RP8
i
,
l
18arnesidf
RGiaylor
JPJ sdon
f.ft,EHJohnson
g/(/85
y/,/85
'd///85
2/l/85
,
r
i
fJ'
l
0
1!
.
..
. -
,
Gulf States Utilitics
-2-
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you hwe any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
a
-
,
d . U . J __
a
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/85-19
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB1/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSTS Operator
- EP&RPB
- RIV File
- w/766