ML20136G489
| ML20136G489 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/05/1985 |
| From: | Martin L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20136G493 | List: |
| References | |
| NUDOCS 8511220371 | |
| Download: ML20136G489 (2) | |
See also: IR 05000458/1985071
Text
.
.
~
NOV 0 51995
!..
"
In Reply Refer To:
Docket:
50-458/85-71
Gulf States, Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
Beaumont,-Texas 77704
Gentlemen:
This refers to the inspection conducted by Messrs. M. E. Skow and C. C. Harbuck
of this office during the period October 7-11, 1985, of activities authorized by
NRC Operating License NPF-40 for River Bend Station, and to the discussion of
our findings with Mr. Deddens and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection included follow-up of various open items
and license conditions for possible closure.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and observa-
tions by the inspectors.
These findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of
.
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not
Office of Management and Budget as
subject to the clearance procedures o r
n
1
. required by the Paperwork Reduction AC of 1980, PL 96-511.
,
I
B
R
RPB
r-R
Skoe:sj
le
CHai b
JPJ udon
LEMartin
(l/l /85
g(/}
tuck
ll/ /85
p/g/85
/85
8511220371 851105
DR
ADOCK 050
8
II f
\\
.
i..
'
,
f
s
4
.
.
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
"FM fNI Signed By:
l E. MARTIN'*
L. E. Martin, Acting Chief'
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/8571
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib, by RIV:
- RPB
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA~
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- M.
E'.
Skow RPB/A
- R&SPB
- C. C. Harbuck, RPB/A
- RIV File
- w/766
i
.
.
.
.