ML20136G417
| ML20136G417 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/18/1985 |
| From: | Grimes B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20136G423 | List: |
| References | |
| NUDOCS 8511220343 | |
| Download: ML20136G417 (5) | |
See also: IR 05000498/1985022
Text
W
'
/
'
- o
UNITED STATES
8
^
NUCLEAR REGULATORY COMMISSION
n
h
- E
WASHINGTON, D. C. 20555
%, ...../
NOV 181985
D:cket Nos. 50-498
50-499
Mr. J. H. Goldberg
Group Vice President - Nuclear
Houston Lighting and Power Company
P. O. Box 1700
5
Houston, Texas 77001
'
Oear Mr. Goldberg:
SUBJECT:
SOUTH TEXAS PROJECT ENGINEERING ASSURANCE PROGRAM (EAP)
INSPECTION REPORT 50-498/85-22
This letter conveys the results and conclusions of NRC's evaluation of Stone
and Webster Engineering Corporation's (SWEC) EAP task " Independent Technical
Assessment, Task-85-3, Offsite AC Power and Medium Voltage AC Power Supply
Systems." The inspection was conducted by a team of personnel from the NRC's
Office of Inspection and Enforcement and consultants at the SWEC offices in
Boston, Massachusetts, from October 15, 1985, through October 17, 1985.
The
objective of the inspection was threefold:
(1) to verify that SWEC's audit of
the aforementioned EAP topic was performed in sufficient technical depth to
achieve objectives of EA program; (2) verify that the background documentation
supported the findings and conclusions of the reports; and (3) to review the
status of items identified by the NRC in Inspection Reports 50-498/85-09
and 50-498/85-14 that related to EAP Task 85-3.
Based on our inspection, the NRC found that task 85-3 was acceptably completed
subject to resolution of NRC's comments, as described in the enclosed report.
The SWEC review was comprehensive, checklists were thoroughly completed, files
vere in good order and backup documentation was auditable and supported SWEC's
findings and conclusions.
In addition, all items relating to Task 85-3 from our
two previous inspection reports had been satisfactorily resolved.
hhhDO
O
L
"
,
'.
l
J. H. Goldberg
-2-
The next inspection of your EAP is tentatively scheduled for December
The purpose of this inspection is to verify the adequacy of corrective actions
2-6, 1985.
associated with EAP Tasks 83-1, 83-2, 83-3, 84-1, 84-2 and 84-3.
Sincerely,
-,<
M
Brian K. Grimes, Director
,
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
.
Enclosure:
Inspection report
.
._
_ _ _ _ . . _ _ _ . _ _ _ _
_.
_
_ _ - _ _ __.
__ _._.
_
'
.
!
Mr. J. H. Goldberg
.
Houston Lighting and Power Company
South Texas Project
.
cc:
William S. Jordan, !!I, Esq.
,
Harmon, Weiss & Jordan
Brian Berwick, Eso.
!
2001 S Street, NW
Assistant Attorney General
n
!
Suite 430
Environmental Protection Division
P. O. Box 12548
Washington, D.C.
20009
Capitol Station
Mr. J. T. Westemeir
,
Manager, South Texas Project
Resident Inspector / South Texas
I
Houston Lighting and Power Company
Project
P. O. Box 1700
t
Houston, Texas 77001
c/o U.S. Nuclear Regulatory Comission
t
I
P. O. Box 910
!
I
Mr. H. L. Peterson
Bay City, Texas 77414
'
Mr. G. Pokorny
City of Austin
Mr. Jonathan Davis
P. O. Box 1088
Assistant City Attorney
,
i
t
City of Austin
i
i
1
P. O. Box 1088
~
i
Mr. J. B. Poston
,
l
Mr. A. Von Rosenberg
City Public Service Boad
Ms. Pat Coy
i
'
P. O. Box 1771
Citizens Concerned About Nuclear
Power
i
San Antonio, Texas 78296
i
5106 Casa Oro
j
Jack R. Newman, Esq.
San Antonio, Texas 78233
i
Newman & Holtzinger, P.C.
i
1615 L Street, NW
Mr. Mark R. Wisenberg
i
Washington, D.C.
20036
Manager, Nuclear Licensing
Houston Lighting and Power Company.
Melbert Schwartz, Jr., Esq.
P. O. Box 1700
>
Baker & Botts
Houston, Texas 77001
'
,
One Shell Plaza
l
Houston, Texas 77002
Mr. Charles Halligan
Mr. Burton L. Lex
j
Mrs. Peggy Buchorn
Bechtel Corporation
Executive Director
P. O. Box 2166
Houston, Texas 77001
!
Citizens for Ecuitable Utilities, Inc.
.
Route 1, Box 1684
i
Brazoria, Texas 77422
Mr. E. R. Brooks
r
i
Mr. R. L. Range
j
Central Power and Light Company
'
P. O. Box 2122
Corous Christi, Texas 78403
1
i
4
i
k
!
i
i
l
!
,
- -
,
!
Houston Lighting & Power Company
-2-
South Texas Project
cc:
Regional Administrator, Region IV
U.S. Nuclear Regulatory Commission
Office of Executive Director
.
for Operations
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
Mr. Lanny Sinkin
Citizens Concerned About Nuclear Power
3022 Porter Street. lnd #304
'
Washington, D.C.
20008
Mr. S. Head, Representative
Houston Lighting and Power Company
Suite 1309
I
'
7910 Woodmont Avenue
Bethesda, Maryla.nd 20814
.
e
4
>
L- ---
-
- - - - - - - .
- -
. . -
- - - .
- . - .
- -
- -
-
- -
- . . - -
- -
- -
- - - - - -
- -
-
1
-
,
.
'
J. H. Goldberg
-3-
0"STR"BUTION:
s u.a. 5: 51
NRC PDR
Local PDR
QAB Reading
DQAVT Reading
JMTaylor, IE
RHVollmer, IE
,
BKGrimes, IE
JGPartlow, IE
GTAnkrum, IE
JLMilhoan, IE
EVImbro, IE
RWParkhill, IE
SVAthavale, IE
HWang, IE
WJDircks, EDO
HRDenton, NRR
PKadambi, NRR
HThompson, NRR *
TMNovak, NRR
WButler, NRR
EHylton, NRR
OELD
ACRS (10)
Regional Administrators
Regional Division Directors
TSpets, NRR
ELJordan, IE
JAxelrad. IE
'
Team Members
HBoulden, OIA
SECY
OPE
($7f
gy
p
JZC g
m
V
.
IL:QAVT:QAB
IE:QAVT:QAB
IE:QAVT:QAB
IE:QAVT:QAB
IE:QAVTQAB
SVAthavale:mv RWParkhill
EVImbro
et JLMilhoan
GTAnkrum
11/5/p
11/ 5 /85
11/^'/85 1 /ri/85
11/et/85
'