Forwards Engineering Assurance Program Insp Rept 50-498/85-22 on 851015-17. Independent Technical Assessment,Task 85-3,Offsite AC Power & Medium Voltage AC Power Supply Sys, Acceptable
ML20136G417
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 11/18/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20136G423 List:
References
NUDOCS 8511220343
Download: ML20136G417 (5)


See also: IR 05000498/1985022

Text

W

'

/ '

  1. o^ UNITED STATES

8 n

NUCLEAR REGULATORY COMMISSION

h  : E WASHINGTON, D. C. 20555

%, ...../

NOV 181985

D:cket Nos. 50-498

50-499

Mr. J. H. Goldberg

Group Vice President - Nuclear

Houston Lighting and Power Company

P. O. Box 1700 5'

Houston, Texas 77001

Oear Mr. Goldberg:

SUBJECT:

SOUTH TEXAS PROJECT ENGINEERING ASSURANCE PROGRAM (EAP)

INSPECTION REPORT 50-498/85-22

This letter conveys the results and conclusions of NRC's evaluation of Stone

and Webster Engineering Corporation's (SWEC) EAP task " Independent Technical

Assessment, Task-85-3, Offsite AC Power and Medium Voltage AC Power Supply

Systems." The inspection was conducted by a team of personnel from the NRC's

Office of Inspection and Enforcement and consultants at the SWEC offices in

Boston, Massachusetts, from October 15, 1985, through October 17, 1985. The

objective of the inspection was threefold: (1) to verify that SWEC's audit of

the aforementioned EAP topic was performed in sufficient technical depth to

achieve objectives of EA program; (2) verify that the background documentation

supported the findings and conclusions of the reports; and (3) to review the

status of items identified by the NRC in Inspection Reports 50-498/85-09

and 50-498/85-14 that related to EAP Task 85-3.

Based on our inspection, the NRC found that task 85-3 was acceptably completed

subject to resolution of NRC's comments, as described in the enclosed report.

The SWEC review was comprehensive, checklists were thoroughly completed, files

vere in good order and backup documentation was auditable and supported SWEC's

findings and conclusions. In addition, all items relating to Task 85-3 from our

two previous inspection reports had been satisfactorily resolved.

hhhDO

O

L_

"

,

'.

l

J. H. Goldberg -2-

The next inspection of your EAP is tentatively scheduled for December 2-6, 1985.

The purpose of this inspection is to verify the adequacy of corrective actions

associated with EAP Tasks 83-1, 83-2, 83-3, 84-1, 84-2 and 84-3.

Sincerely,

-,< M

,

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

. Office of Inspection and Enforcement

Enclosure:

Inspection report

.

._ _ _ _ _ . . _ _ _ . _ _ _ _ _. _ _ _ - _ _ __. __ _._. _

'

.

!

.

Mr. J. H. Goldberg

Houston Lighting and Power Company South Texas Project

.

cc:

William S. Jordan, !!I, Esq. Brian Berwick, Eso.

,

Harmon, Weiss & Jordan  !

n

2001 S Street, NW Assistant Attorney General

! Suite 430 Environmental Protection Division

Washington, D.C. P. O. Box 12548

  • 20009 Capitol Station

Austin, Texas 78711 ,

Mr. J. T. Westemeir

Manager, South Texas Project

I

Resident Inspector / South Texas

Houston Lighting and Power Company Project

P. O. Box 1700 *

t

Houston, Texas 77001 c/o U.S. Nuclear Regulatory Comission t

I P. O. Box 910

I Bay City, Texas 77414  !

' Mr. H. L. Peterson

Mr. G. Pokorny

City of Austin Mr. Jonathan Davis ,

i

P. O. Box 1088 Assistant City Attorney t

i

Austin, Texas 78767 City of Austin i

1 ~

P. O. Box 1088 i

,

Mr. J. B. Poston Austin, Texas 78767

l Mr. A. Von Rosenberg

'

i

City Public Service Boad Ms. Pat Coy

P. O. Box 1771 Citizens Concerned About Nuclear

i

San Antonio, Texas 78296 Power

i 5106 Casa Oro

j Jack R. Newman, Esq. San Antonio, Texas 78233

i

Newman & Holtzinger, P.C.

i 1615 L Street, NW Mr. Mark R. Wisenberg

i Washington, D.C. 20036 Manager, Nuclear Licensing  ;

Houston Lighting and Power Company. >

Melbert Schwartz, Jr., Esq. P. O. Box 1700

'

Baker & Botts Houston, Texas 77001 ,

One Shell Plaza

l Houston, Texas 77002 Mr. Charles Halligan

Mr. Burton L. Lex

j Mrs. Peggy Buchorn Bechtel Corporation

Executive Director P. O. Box 2166

Houston, Texas 77001

! Citizens for Ecuitable Utilities, Inc.

.

Route 1, Box 1684

i Brazoria, Texas 77422 Mr. E. R. Brooks r

i Mr. R. L. Range '

j Central Power and Light Company

P. O. Box 2122

Corous Christi, Texas 78403

1

i

4

i

k  !

i

i

l

!

,

- -

,

!

Houston Lighting & Power Company -2- South Texas Project

cc:

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

Office of Executive Director .

for Operations

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

Mr. Lanny Sinkin

Citizens Concerned About Nuclear Power

3022 Porter Street. lnd #304 '

Washington, D.C. 20008

Mr. S. Head, Representative

Houston Lighting and Power Company

Suite 1309 I '

7910 Woodmont Avenue

Bethesda, Maryla.nd 20814

.

e

4

>

-

, 1

.

'

J. H. Goldberg -3-

0"STR"BUTION:

s u.a. 5: 51

NRC PDR

Local PDR

QAB Reading

DQAVT Reading

JMTaylor, IE

RHVollmer, IE ,

BKGrimes, IE

JGPartlow, IE

GTAnkrum, IE

JLMilhoan, IE

EVImbro, IE

RWParkhill, IE

SVAthavale, IE

HWang, IE

WJDircks, EDO

HRDenton, NRR

PKadambi, NRR

HThompson, NRR *

TMNovak, NRR

WButler, NRR

EHylton, NRR

AEOD

OELD

NMSS

RES

ACRS (10)

NSIC

NTIS

Regional Administrators

Regional Division Directors

TSpets, NRR

ELJordan, IE '

JAxelrad. IE

Team Members

HBoulden, OIA

SECY

OPE

m .

($7f gy p V

JZC g

IL:QAVT:QAB IE:QAVT:QAB IE:QAVT:QAB IE:QAVT:QAB IE:QAVTQAB

SVAthavale:mv RWParkhill EVImbro et JLMilhoan GTAnkrum

11/5/p 11/ 5 /85 11/^'/85 1 /ri/85 11/et/85

'