Proposed Tech Spec Changes,Correcting Value of P(A) as Given in Snupps FSAR Section 6.2.1.4.3.3ML20136G411 |
Person / Time |
---|
Site: |
Callaway ![Ameren icon.png](/w/images/0/06/Ameren_icon.png) |
---|
Issue date: |
11/15/1985 |
---|
From: |
UNION ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20136G404 |
List: |
---|
References |
---|
NUDOCS 8511220342 |
Download: ML20136G411 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS ML20115J0181996-07-18018 July 1996 Proposed Tech Specs 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20107H3931996-04-17017 April 1996 Proposed Tech Specs 3/4.3 Re Adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2 & Revising Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3251996-04-12012 April 1996 Proposed Tech Specs 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases,Addressing Installation of Laser Welded Tube Sleeves in Plant SGs ML20107F0791996-04-12012 April 1996 Proposed Tech Specs 3/4.4 Re Changing TS, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant SGs ML20101R4211996-04-0909 April 1996 Revised TS Pages That Adhere to Testing Methods of ASTM Std D2276-78,Method a for Diesel Fuel Oil Particulate Concentration ML20101J0381996-03-22022 March 1996 Proposed Tech Specs,Implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4351996-02-28028 February 1996 Proposed TS 3/4.8.1,ac Sources ML20106G4131996-02-23023 February 1996 Proposed Tech Specs Paragraph 1.A. Re Operating License Change to Reflect Union Electric as wholly-owned Subsidiary of Ameren Corp ML20097D5801996-02-0909 February 1996 Proposed Tech Specs Allowing Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6151996-02-0909 February 1996 Proposed Tech Specs & Bases Re Containment Systems ML20097D6341996-02-0909 February 1996 Proposed Tech Specs Re AFW Sys ML20097F8991996-02-0404 February 1996 Proposed Tech Specs 4.6.1.2.a Re Containment Sys ML20097C2791996-02-0202 February 1996 Proposed Tech Spec 3/4.6.3, Containment Isolation Valves ML20096B1891996-01-0202 January 1996 Proposed Tech Specs 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ML20094A1721995-10-23023 October 1995 Proposed Tech Specs,Relocating Audit Frequencies in Former TS 6.5.2.9 to Operational QA Manual 1999-09-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20135E7351996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl ML20135E7431996-12-11011 December 1996 Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl ML20135E7391996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS 1999-09-08
[Table view] |
Text
.
Attachment 3 ULNRC- 12.08 PROPOSED TECHNICAL SPECIFICATION CHANGES BS11220342 851115 3 DR ADOCK 0500 s
. ,mg u,. +; w ,..e . .,,
- jy . ,
.. c. :.. .._
p .',
. 3/4.6 CONTAINMENT SYSTEMS REVIS101/2. j
- 3/4.6.1 PRIMARY CONTAINMENT CONIAINMENT INTEGRITY .
LIMITING CONDITION FOR OPERATION
- 3. 6.1.1 Primarf CONTAINMENT INTEGRITY shall be saintained.
APPLICABILITY: MODES 1, 2, 3, and 4 -
ACTION:
Without primar/ CCNTAINNENT INTEGRITY, restore CCNTAINMENT INTE*3RITf within- ~
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDSY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD ~
SHUT 00%N within. the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS _
f-
~~ ~"
4.5.I.I. Frimarv- CONTAINMENT. INTE3RITI snali be demonstrated:. -
m
- a. At Teast once per 3I days Oy veriff fag- that aTT penetrations" not -
- cacacie of being crosed ':y GPERAELE contain=ent automatic -isciaticn valves and requirec Oc be cTosed' during actfdent. canditions are cTosed by valves, bTind flanges,. or deactivatad autcmatic valves
~
secured in their positions, excent as proviced in Tacle 2.5-L of Specification .T.6.3, s
- b. By veriffing cat aaca c::ntain=ent ifr iccx is in ec=c!fanca with ne requirementa of Specificaf.ica 3.5. '. 2; and
- c. Aftar eacn c!csing of aaca penet ation sucject is Type 3 testing, excact te containment air locxs, if scened failcwing i Type A 2r 3 tast, by leak rata tasting .ne seaI with gas at a pressura act Tes's jE/
e
" . nan s $psig, and verif ingf :nat wnen :ne :easurad Teakage cata >(
for indse seais is idced Oe leakage -atas detarained pursuant to Scecification 1.5.1.2d. fcr ali otter Type 3 anc C penet: ations, ce
~
ccmcined leakage cata is less nan 0.50 L,.
Excsot valves, clind flanges, 2nc :eactivatad succmatic valves *nica tra locatad insice me containment and tre locxed, sealed ar- attervise secur-c in :ne c!csec ;csition. These genetrations snali ce verified closed curing esca C3LO 3HUTC0%N excact Oat sucn verificaticq need act te ;erfor ac core of tan man 2nca :ec 32 days. -
CALLWAY - UN CT '. 1/ a 3 *. S
/
-/
- g ; - .;' 3- r .
. ;.,, ,y-; m. . m - . : ., w .
3 p- , ,
7 REVisl0N
. . ; I' g)N1AINMENTSYSTEMs CONTAINMENT LEAKAGE .
7 LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shaiT be limited to:
a.
An overall integrated leakage rate of less than or equal to L,, 0.20%' N'/ i
' by wei~ght of the. containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P,,@psig.
for all penetrations
- b. A combined Teakage rate of less than 0.60 L,,
and valves subfect to Type 3 and C tests, when pressurized to %
Pa & **iT- y, APPL [CABILITY_t MODES ~1 ,2,_I and 4 - Y.*[
w ACTION _:
With eith i- the :neasured overaIT fatagratad containment Teakage rata exceedins 0.75 L, or the :neasured coacfned Teakage rata for aTT penetrations a
.<. d ,
subfect to Types- 3' and.C testsJaxceeding 0.60 t ,. restare .the overaTT f ateg _
leakage rate to Tess than G;75 Eg and'the concined Teakage rata for alt pene 2 Tess thart O'.50 L, prior to fac easing
- trations sublect to- T'ype T and C' tast t: , ,
.y the Reactor Coat' ant. System tamcerature. above 200*F.
.k SURVEILLANCE REOUIREMENT5'
~
- 4. 5.1. 2 The containment Teakage ratas shall se demonstratadi at thei foTTcwinq test fied in schedule and shaIT CFR ? art 50ce usingdetarmined
.Me metaccs and in conformance
- 2revisicas of ANSI with
- ne N45. 2-1972:. g,7 ntagrated Cantainment L:rakage lata)
Three Type A tasts (Overait acnth incarvais during shurc::wn a.
snall be c::ncuctad at 10 : ' icsatperled.
1 %
- 2ressure not less than ?,,.t
- @psig, during each 10 year serv The third :ast of eacn sat shaII be c nductad during the shutdown far the 10 year ;21 ant inservice inscac.fon; a the tast senecule
- b. If sny ;:ecicdic Type 4 test fails ts teet 0.75 L,,
for sucsequent Type 4 tasts shall be reviewed Cammission.
3 and accr=ve 0.o 1
Type A test shal f te ;:erformee at atwnien leasttime every ne 13 months acove tast untii c::nsecutive Type A :ests meet 0.75 L,, .
schedule may be esumed:
i 2/45-2 .J CALLAWAY - UNIT :.
s b
,c - -- _
g.7.g y 23;
> . s t_ _
[,' I CONT INMfM1 SYSTEMS Y/Sfg ;
RVI il_t ANCF ,R, EQtitR1MFKT5 (Continued)
- c. The accuracy of each Type A test shall be verified by a supplemental test which:
1)
Confirms the accuracy of the test by verify.ing that the supple-mental test result, L,, minus the sum of the Type A and the superimposed leak. L , is equal to or less than 0.25 L,, '
- 2) Has a duration sufficient to establish accurately the change in leakage rata between the Type A test and the supplemental test, and
- 3) Requires that the rate at wnica gas is infec*,ad into the contain-ment or bled frcm the containment during the supplementai test is between 0.75 L and 1.25 L*
fd Type S and C t ts shall be conducted witn gas at a pressure nor.
- d. X less than F,, psig, at. incarvals, no greatar than 24 months except for- tests involving:
E' '
I): Alr- locks , and
~-[ --
2)- Purge supply and exnaust isolation valves with resilient :natarfal: ,
sears. .
- e. Air locks shall se tasted and demonstratad CPERABLE ty 'the requirements of Specification a. 6.1. 3 ._
's.
Purge sucply and exnau. isolation salves with resfTient satarfar seals -
f.
~
shaII Oe testad and demonstrated GPERA8LE ty ne requir-ments at" Scecifications 4 s.1.7. 2 and 4. s.1. 7.1,. as acpticacie; anc
- g. The ;revisiens of Icecification 1.0.2 tre not accifcacie.
~
I/a 3-1 CALL.WAY - 4MCT .
WW.~wy Jn-; g.,
, . w m,,
n r. -
. REVISIOy' 1 - 7
' CONI AINMENI ',YSit MS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION k
3.6.1.3 Each containment air lock shall be OPERABLE with: -
- a. Both doors closed except when the air Tock is being used for nonnal transit entry and exits through the containment, then at least one -
air lock door shall be closed, and
- b. An over air Tock leakage rata of Tess than or equar ts 0.0E L, x
at P ,, psig. -
_ + r. /
APPLICABILITY: MODES 1, 2,. 3, and 4 ACTION:
- a. With one containment afr Tack daar fnoperabTe:
- 1. Maintain at least the OPERABLE air Tock door cTosed and either
' restore the- inoperabTe air Tock door ts GPERABLE status within.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or Tock.the OPERAELE air Tock. door crosed,.
~~
- 2. Operation :nay then. continue untiT. performanes of the next s required overait air Tack Teakage test provided that the OPERABLE 1:
air-Tock door is verffied' to be rocked cTosed at. Teast onca ;:er ./
31 days,.
- 3. Otherwise, be in at least HOT STAND 8Y within the next i hours and in CDLD SHUTDC%N within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,. and
- 4. The provisions of Specification 3.0.a tre not acclicacie.
With the containment air lack inoceracle, excant is tne result of in b.
inoperable air locx door, saintain ac Teas: one air lock door closed:
restore the inoceraale air Iack to GPERABLE status within 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> or be in at Teast HOT STANOBY within the next 5 nours Inc #
in CLO SHUTCC%N within ene following 30 nours.
'w l s CAL.LAWM - UNii 1 3/4 5-a l
l
M. i .
, , s.
- v. . . ,. : . e
. i REVIS10N y~ .
CONTAINMENT SYSTEMS f
SURVEILLANCE REQUIREMENTS 4.6'.1.3 Each containment air lock shall be demonstrated OPERABLE:
- a. Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each. closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that the seal leakage is less than 0.005 L, as datarmined by precision flow seasurements when measured for at least 30 seconds with the volume bat,veen the- seals at a constant pressure of greater than or equal to 10 psfg; .
- b. By conducting ~ overall au . lock Teakage tests at not Tess than P,,
$psig, and verifying the overall air Tock Teakage rata is within X ff, / -
its Timit:
- 1) At least crice per 6 aanths,# and
- 2) Prior to estanifshing CONTAINMENT INTEGRITf when maintenanca has been performed on the air lock that couTd affect the air
.Tock sealing capability."
- c. At Teast enca per :s scnths by- verifying that onTy one dear in each air Tack can be opened at a time.
8 t he ;2rev is ions 2 f iceci ficacion 1.0. 2 2n ciac acciicaci.e.
'This recru encs in esemot:cn is accencia .' . 2373g73cn ::,3.2.(3)(fi), ;f
!,0 CR 33r*. $0.
~
~
CAL' ,WAY - UN '.7 *. 2/ 7. 3-5
ihvf. W ~.'~- .
. ;+4 y y -
^'
4 REVISloy 3
CONTAINMENT SYSTEMS
~~)
SURW.ILLANCE REQUIREMENTS Each 36-inch containment shutdown purge supply and exhaust isolation 4.6.1.7.1 shall be verified blank flanged and clos,ed at least once per 31 days.
valve (s)" M r.IEach 36-inch containment shutdown purge supply and ex
- 4. 6.1. 7. : its associated blank flange shall be leak tested at least once per i d valve an< and following each reinstallation of the blank flange when pressur ze K 24 mont to P ,
valv$5 and flanges, including stem for allleakage, other Type S is andaddedC to the leak determined pursuant to Specification 4.6.1.2d.
penetrations, the c::moined leakage rate is less than 0.60' L,. .
The cumulative time that all 18-inch containment mini-purge ll~ be supply 4.6.1.7.3 and exhaust isolation valves have been open curing a calendar year sha determined-at least once per 7 days.
At least once per 3 months each 18-inch containment mini-purgel seals shall be 4.6.1.7.a h supply and exhaust isolation valve with resilient :natariademon 0.05 L, when pressucited to Pa' o
t These vaives
'!<cect eniees and fianges .nica tre Iccatad i insice concainment.hiant, .s flanges insalled pri shall be eeri fied to :e closec '.i ta .ne :-
into NUE a following taca COLD SHUTCC'nN.
..n tr f 3/4 5- 12 -
C.TLLNaY - UNIT '.