ML20136G411
| ML20136G411 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/15/1985 |
| From: | UNION ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20136G404 | List: |
| References | |
| NUDOCS 8511220342 | |
| Download: ML20136G411 (6) | |
Text
.
ULNRC-12.08 PROPOSED TECHNICAL SPECIFICATION CHANGES BS11220342 851115 DR ADOCK 0500 3
s
. g u,. +; w
,..e
,m
- jy
- c. :..
p REVIS101/
2.
j 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONIAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION
- 3. 6.1.1 Primarf CONTAINMENT INTEGRITY shall be saintained.
APPLICABILITY: MODES 1, 2, 3, and 4 ACTION:
Without primar/ CCNTAINNENT INTEGRITY, restore CCNTAINMENT INTE*3RITf within-
~
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDSY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD ~
SHUT 00%N within. the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS f-
~~
4.5.I.I.
Frimarv CONTAINMENT. INTE3RITI snali be demonstrated:.
~"
m a.
At Teast once per 3I days Oy veriff ag-that aTT penetrations" not f
cacacie of being crosed ':y GPERAELE contain=ent automatic -isciaticn valves and requirec Oc be cTosed' during actfdent. canditions are
~
cTosed by valves, bTind flanges,. or deactivatad autcmatic valves secured in their positions, excent as proviced in Tacle 2.5-L of Specification.T.6.3, s
By verif ing cat aaca c::ntain=ent ifr iccx is in ec=c!fanca with ne b.
f requirementa of Specificaf.ica 3.5. '. 2; and Aftar eacn c!csing of aaca penet ation sucject is Type 3 testing, c.
excact te containment air locxs, if scened failcwing i Type A 2r 3 tast, by leak rata tasting.ne seaI with gas at a pressura act Tes's
. nan s $psig, and verif ing :nat wnen :ne :easurad Teakage cata
>(
jE/
f e
for indse seais is idced Oe leakage -atas detarained pursuant to Scecification 1.5.1.2d. fcr ali otter Type 3 anc C penet: ations, ce
~
ccmcined leakage cata is less nan 0.50 L,.
.Excsot valves, clind flanges, 2nc :eactivatad succmatic valves *nica tra locatad insice me containment and tre locxed, sealed ar-attervise secur-c in :ne c!csec ;csition.
These genetrations snali ce verified closed curing esca C3LO 3HUTC0%N excact Oat sucn verificaticq need act te ;erfor ac core of tan man 2nca :ec 32 days.
CALLWAY - UN CT '.
1/ a 3 *.
S
/
-/
3
- g ; -.;' 3-r
. ;.,,,y-;
- m..
m -
- ., w.
p-REVisl0N I' 7 g)N1AINMENTSYSTEMs CONTAINMENT LEAKAGE 7
LIMITING CONDITION FOR OPERATION Containment leakage rates shaiT be limited to:
3.6.1.2 An overall integrated leakage rate of less than or equal to L,, 0.20%' N'/
i by wei~ght of the. containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P,,@psig.
a.
A combined Teakage rate of less than 0.60 L,, for all penetrations b.
and valves subfect to Type 3 and C tests, when pressurized to P & **iT-y, a
APPL [CABILITY_t MODES ~1,2,_I and 4 -
Y.*[
w ACTION _:
With eith i-the :neasured overaIT fatagratad containment Teakage rata exceedins 0.75 L, or the :neasured coacfned Teakage rata for aTT penetrations a d
subfect to Types-3' and.C testsJaxceeding 0.60 t,. restare.the overaTT f ateg leakage rate to Tess than G;75 Eg and'the concined Teakage rata for alt pene 2 Tess thart O'.50 L, prior to fac easing trations sublect to-T'ype T and C' tast t:
the Reactor Coat' ant. System tamcerature. above 200*F.
.y
.k SURVEILLANCE REOUIREMENT5' The containment Teakage ratas shall se demonstratad at the foTTcwinq
~
i i
test schedule and shaIT ce detarmined in conformance with :ne CFR ? art 50 using.Me metaccs and ;2revisicas of ANSI
- 4. 5.1. 2 fied in N45. 2-1972:.
g,7 ntagrated Cantainment L:rakage lata)
Three Type A tasts (Overait acnth incarvais during shurc::wn at 1 snall be c::ncuctad at 10 : '
ics perled.
a.
- 2ressure not less than ?,,.t
- @psig, during each 10 year serv The third :ast of eacn sat shaII be c nductad during the shutdown far the 10 year ;21 ant inservice inscac.fon; a
If sny ;:ecicdic Type 4 test fails ts teet 0.75 L,, the tast senecule b.
for sucsequent Type 4 tasts shall be reviewed and accr=ve 3
Cammission.
Type A test shal f te ;:erformee at least every 13 months untii 0.o c::nsecutive Type A :ests meet 0.75 L,, at wnien time ne acove tast 1
schedule may be esumed:
i 2/45-2
.J CALLAWAY - UNIT :.
s b
g.7.g y 23;
,c
>. s t_ _
Y/Sfg
[,'
CONT INMfM1 SYSTEMS I
RVI il_t ANCF,R, EQtitR1MFKT5 (Continued)
The accuracy of each Type A test shall be verified by a supplemental c.
test which:
Confirms the accuracy of the test by verify.ing that the supple-1) mental test result, L,, minus the sum of the Type A and the superimposed leak. L, is equal to or less than 0.25 L,,
Has a duration sufficient to establish accurately the change in 2) leakage rata between the Type A test and the supplemental test, and Requires that the rate at wnica gas is infec*,ad into the contain-3) ment or bled frcm the containment during the supplementai test is between 0.75 L and 1.25 L*
fd d.
Type S and C t ts shall be conducted witn gas at a pressure nor.
X less than F,,
psig, at. incarvals, no greatar than 24 months except for-tests involving:
E' I):
Alr-locks, and Purge supply and exnaust isolation valves with resilient :natarfal:
~-[
2)-
sears.
Air locks shall se tasted and demonstratad CPERABLE ty 'the requirements e.
of Specification a. 6.1. 3
's.
isolation salves with resfTient satarfar seals -
f.
Purge sucply and exnau.
~
shaII Oe testad and demonstrated GPERA8LE ty ne requir-ments at" Scecifications 4 s.1.7. 2 and 4. s.1. 7.1,. as acpticacie; anc accifcacie.
The ;revisiens of Icecification 1.0.2 tre not g.
~
I/a 3-1 CALL.WAY - 4MCT.
. w m,,
WW.~wy Jn-;
g.,
n r.
REVISIOy' 1 -
7
' CONI AINMENI ',YSit MS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION k
Each containment air lock shall be OPERABLE with:
3.6.1.3 Both doors closed except when the air Tock is being used for nonnal transit entry and exits through the containment, then at least one -
a.
air lock door shall be closed, and air Tock leakage rata of Tess than or equar ts 0.0E L, b.
An over x
at P,,
psig.
_ + r. /
APPLICABILITY: MODES 1, 2,. 3, and 4 ACTION:
With one containment afr Tack daar fnoperabTe:
a.
Maintain at least the OPERABLE air Tock door cTosed and either
' restore the-inoperabTe air Tock door ts GPERABLE status within.
1.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or Tock.the OPERAELE air Tock. door crosed,.
~~
Operation :nay then. continue untiT. performanes of the next required overait air Tack Teakage test provided that the OPERABLE 2.
s 1:
air-Tock door is verffied' to be rocked cTosed at. Teast onca ;:er
./
31 days,.
Otherwise, be in at least HOT STAND 8Y within the next i hours 3.
and in CDLD SHUTDC%N within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,. and The provisions of Specification 3.0.a tre not acclicacie.
4.
is tne result of in With the containment air lack inoceracle, excant inoperable air locx door, saintain ac Teas: one air lock door closed:
b.
restore the inoceraale air Iack to GPERABLE status within 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> or be in at Teast HOT STANOBY within the next 5 nours Inc in CLO SHUTCC%N within ene following 30 nours.
'w l
s 3/4 5-a l
CAL.LAWM - UNii 1 l
M. i.
v
~ ~: : n - w~.
e
,, s.
i REVIS10N y~
CONTAINMENT SYSTEMS f
SURVEILLANCE REQUIREMENTS 4.6'.1.3 Each containment air lock shall be demonstrated OPERABLE:
Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each. closing, except when the air lock is a.
being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that the seal leakage is less than 0.005 L, as datarmined by precision flow seasurements when measured for at least 30 seconds with the volume bat,veen the-seals at a constant pressure of greater than or equal to 10 psfg;.
By conducting ~ overall au. lock Teakage tests at not Tess than P,,
b.
ff, / -
$psig, and verifying the overall air Tock Teakage rata is within X
its Timit:
1)
At least crice per 6 aanths,# and 2)
Prior to estanifshing CONTAINMENT INTEGRITf when maintenanca has been performed on the air lock that couTd affect the air
.Tock sealing capability."
At Teast enca per :s scnths by-verifying that onTy one dear in each c.
air Tack can be opened at a time.
8 t he ;2rev is ions 2 f iceci ficacion 1.0. 2 2n ciac acciicaci.e.
'This recru encs in esemot:cn is accencia.'. 2373g73cn ::,3.2.(3)(fi), ;f
!,0 CR 33r*. $0.
~
CAL',WAY - UN '.7 2/ 7. 3-5
~
. ;+4 y y -
ihvf. W
~. ' ~ -
4
^'
REVISloy 3
1 CONTAINMENT SYSTEMS
~~)
SURW.ILLANCE REQUIREMENTS Each 36-inch containment shutdown purge supply and exhaust isolation shall be verified blank flanged and clos,ed at least once per 31 days.
4.6.1.7.1 valve (s)" M r.IEach 36-inch containment shutdown purge supply and ex its associated blank flange shall be leak tested at least once per
- 4. 6.1. 7. :
i d and following each reinstallation of the blank flange when pressur ze K
valve an<
and flanges, including stem leakage, is added to the lea 24 mont to P,
for all other Type S and C valv$5 determined pursuant to Specification 4.6.1.2d.
penetrations, the c::moined leakage rate is less than 0.60' L,.
The cumulative time that all 18-inch containment mini-purge supply ll~ be and exhaust isolation valves have been open curing a calendar year sha 4.6.1.7.3 determined-at least once per 7 days.
At least once per 3 months each 18-inch containment mini-purgel seals shall be supply and exhaust isolation valve with resilient :natariademon 4.6.1.7.a h
0.05 L, when pressucited to P '
a o
t These vaives fianges.nica tre Iccatad insice concainment.hiant, flanges insalled pr
.s
'!<cect eniees and i
shall be eeri fied to :e closec '.i ta.ne :-
into NUE a following taca COLD SHUTCC'nN.
..n tr f 3/4 5-12 C.TLLNaY - UNIT '.