ML20136F577
| ML20136F577 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/15/1985 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20136F568 | List: |
| References | |
| NUDOCS 8511220148 | |
| Download: ML20136F577 (1) | |
Text
)
4.7 A-Primary Containment (Cont'd)
(4) Any one main steam line isolation valve 11.5 scf/hr 023 psig.
4 Method B i
If the total leakage rates listed below as adjusted to a test pressure of 23 psig are exceeded, repairs and retests shall be performed to correct the condition.
(1) Double-gasketed seals - 10%Ls.(23)
(2) (a)
Testable penetrations and isolation valves 60% L. (23) l3,17 (b) Any one penetration or isolation valve except steam line isolation valves 5%L..(23)
(c) Any one main steam line isolation valve 11.5 scf/hr @23 psig Leak rates measured at 45 psig shall be adjusted to a test pressure of 23 psig according to:
LLRT(23). 3 - LLRT.... x L.(23)
L.(45) g.
DELETED e
h.
Drywell Surfaces The interior surfaces of the drywell and torus above water line shall be visually inspected each operating cycle for evidence of deterioration.
B511220148 851115 DR ADOCK 05000293 p
PDN 155
-.