ML20136F167

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1985
ML20136F167
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/31/1985
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8511220053
Download: ML20136F167 (12)


Text

1

~ . . .

l OPERATING DATA REPORT l DOCKET NO. 50-369 DATE 11/15/85 COMPLETED BY TA- Raavis

- TELEPHONE 7n4-373-7567 OPERATING STATUS 1.' Unit Name: McGuire 1 Notes.

  • Nameplate Rating
2. Reporting Period: October 1. 1985-October 31. 1985 (Gross MWe) calculated as 3411 1450.000 MVA x .90 power
3. Licensed Thennal Power (MWt): factor per Page lii,
4. Nameplate Rating (Gross MWe): 1305*

1180 NUREG-0020.

5. Design Electrical Rating (Net MWe). l
6. Maximum Dependable Capacity (Gross MWe): l
7. Maximum Dependable Capacity (Net MWe): 11R0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None l

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,if Any:

. This Month Yr.-to.Date Cumulative

11. Hours in Reporting Period _ 745.0 7 296.0 34 344.0
12. Number Of Hours Reactor Was Critical 745.0 5 623.5 23 787.I
13. Reactor Reserve Shutdown Hours .
14. Hours Generator on-Line 745.0 5 538.2 23 500.8 _
15. Unit Reserve Shutdown Hours -
16. Gross Thermal Energy Generated (MWH) 2 533 965 16 596 473 63 400 773

. 17. Gross Electrical Energy Generated (MWH) 886 287 5 699 912 21 929 157

18. Net Electrical Energy Generated (MWH) 854 528 5 454 250 20 829 505
19. Unit Service Factor 100.0 '75.9 68.4
20. Unit Availability Factor 100.0 75.9 68.4
21. Unit Capacity Factor (Using MDC Net) 97.2 63.4 51.4
22. Unit Capacity Factor (Using DER Net) 97.2 63.4 51.4
23. Unit Forced Outage Rate 0.0 7.1 14.2
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Eachl:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status tPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i COMMERCIAL OPERATION h

8511220053 ADOCK 05 85 0 69 PDR PDR (9/77)

R t - - - . - - . - .

.= . -

~

K

, AVERAGE DAILY UNIT-POWER LEVEL DOCKET NO. 50-369 UNIT ' McGuire 1 DATE 11/15/85 Y COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH October, 1985-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I 1 148 17 1 149 2 1 147 18 1 152 3 1 144 19 1 149

'4 1 146 20 1 150 5~ 1 146 21' 1 150 6 1 146 22 1 149 7 1 150 23 1 149 8 1 148 24 1 146

_9 I 147 25 1 144 10 1 147 26 1 118 11 1 147 27 1 193 12 1 147 28 1 149 13 -- 1 147 29 1 148

~14 I 147 30 1 148 15- 1 153 31 1 148

' 16' 1 154 l

l lNSTRUCTIONS l .On this, format, list the average daily unit power level in MWe-Net for each day

-in the reporting month. Compute to the nearest whole megawatt.

L-l R

?

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. ~ 50-369 UNIT NAME McGuire 1 .

DATE 11/15/85 REPORT MONTH- October, 1985 COMPLETED BY J. A. -Reavis

_ TELEPHONE 704 _373

. _7567 m

5 e o o,3 License y Cause & Corrective.

87 "c v "E "

  • No. Date ~

o n.

%h s- o Je pg,

  • :s a Event hmm "g Action to ,

N 55 g .o E $5S Report # NO oO Prevent Recurrence 36-p 85-10-26 S --

B -

CC VALVEX Turbine. Valve Movement Test I

{

1 2 3 4 Reason: Method: Exhibit G - Instructions S e led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training 4 License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source II-Other (Explain)

9/77)

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 1 .
2. Scheduled next refueling shutdown: June, 1986 .
3. Scheduled restart following refueling: September, 1986 .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 .

(b) in the spent fuel pool: 1s2 .

8. Present licensed fuel pool capacity: 1463 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: August. 2010 .

DUKE POWER COMPANY Date: November 15, 1985 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

4 DOCKET: 50-369

' UNIT: McGuire 1 DATE: 11/15/85 NARRATIVE

SUMMARY

Month: October, 1985 L

- McGuire Unit 1 operated at-100% throughout October.

i

(- i l

l l

1 r

y ~- -, -- -,,,,--,,.w-, - - , - - - - ,,,,nw , , , n, w,,n,..-g-, , ~ , , , ,.ww,,,,e- ,. w ,,w.4, m.m.,,,n. ,-m,m-,,,-,r,, ,,,.r- -,--n-,, , , -r,,, ,-n.--,w-

n 1

j l

OPERATING DATA REPORT DOCKET NO. 50-370 DATE 11/15/85 COAIPl.ETED BY J.A. Reavis TELEPIIONE und-373-7567 OPERATING STATUS

1. Unit Name: McGuire 2 Notes '* Nameplate Rating
2. Reporting Period: October 1, 1985-October 31, 1985 (Gross MWe) calculated as 3411 1450.000 MVA x .90 power
3. Licensed Thermal Power (51Wt):

1305* factor per Page lii,

4. Nameplate Rating (Gross blWe):

1180 NUREG-0020.

S. Design Electrical Rating (Net SIWE):

6. Staximum Dependable Capacity (Gross blWe):
7. Staximum Dependable Capacity (Net alWe): 1180
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net SIWE): None
10. Reasons For Restrictions,if Any:

' This hionth Yr..to.Date Cumulative II. Hours in Reporting Period 745.0 7 296.0 14 640.0

12. Number Of Hours Reactor Was Critical 714.0 4 362.8 10 501.0
13. Rdetor Reserve Shutdown Hours --- ---
14. Hours Generator On Line 700.1 4 050.2 10 141.2

)

15. Unit Reserve Shutdown Hours --- ---
16. Gross Thermal Energy Generated (SiWH) 2 342 207 13 084 945 32 455 616 .
17. Gross Electrical Energy Generated (31WH) 818 878 4 555 695 11 393 418
18. Net Electrical Energy Generated (htWH) 787 755 4 342 057 10 899 857
19. Unit Service Factor 94.0 55.5 69.3
20. Unit Availability Factor 94.0 55.5 69.3
21. Unit Capacity Factor (Using blDC Net) 89.6 50.4 63.I
22. Unit Capacity Factor (Using DER Net) 89.6 50.4 63.1
23. Unit Forced Outage Rate 6.0 30.0 22.3
24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.and Duration of Each):

Refueling - April 4, 1986 - 9 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status tPrior to Commercial 0peration): Forecast Achieved 4

INITIA L CRITICALITY INITIAL ELECTRICITY C0stalERCIAL OPERATION (9/77)

AVERAGE DAILY UNIT POWER LEVEL 4

DOCKET NO. - ' 50- 3 70 UNIT McGuire 2 DATE 11/15/85 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 HONTH October, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1 151 17 1 151 2 1 150 18 1 152 3 1 149 19 1 152 4 1 149 20 1 152 5 1 149 21 1 153 6 1 149 22 1 ist 7 1 152 23 1 151 8 1 151 24 398 9 1 151 25 155 10 1 150 26 128 11 1 150 27 1 068

  • 12 1 150 28 1 150 13 1 150 29 1 151 14 1 149 30 1 151 15 1 152 31 1 154 16 1 154 lNSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

t

UNIT SHUTDOWIS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME McGuire 2 -

DATE 11/15/85 REPORT PONTH october 1985 COMPLETED BY J. A. Reavis

.__ _ _. ___. TELEPHONE 704-373--7567

%o e o my License .g Cause & Corrective q 32 "c. n5E *

  • No. Date ~.  % !; o yg Event h h Action to ,

S Report # hb bb Prevent Recurrence 18 85-10-24 F 28.98 A 3 IE INSTRU Loss of Power (2EKVB) to Nuclear Instrumentation (CH-II) i 27-p 85-10-25 F -

F -

HH xxxxxx Hold for Secondary Chemistry 28-p 85-10-25 F -

B -

IB INSTRU Nuclear Instrumentaton Calibration-29-p 85-10-26' F -

B -

IB INSTRU Nuclear Instrumentation Calibration 19 85-10-26 F 15.97 A 3 HA GENERA Loss of Voltage Regulator for Generator Exciter When Switched From Auto to Manual 30-p 85-10-27 F -

B -

IB INSTRU Nuclear Instrumentation Calibration 31-p 85-10-27 F -

A -

CC VALVEX #4 Governor Valve Problem 32-p 85-10-27 F -

B -

IB INSTRU Nuclear Instrumentation Calibration l! 33-p 85-10-27 F -

A -

CC VALVEX #4 Governor Valve Problem I 34-p 85-10-27 F -

A -

CC VALVEX #4 Governor Valve Problem I- I ,

1 2 3 4 N Reason: Method: Exhibit G - Instructions S led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

, E-Operator Training 4 License Examination F-Mninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain) l@/77)

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire Unit 2 ,
2. Scheduled next refueling shutdown: April 1986 .
3. Scheduled restart following refueling: June. 1986 .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in de. sign or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 .

(b) in the spent fuel pool: 69 .

8. Present licensed fuel pool capacity: 1463 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: August. 2010 .

DUFF POWER COMPANY Date: Novembe r 15, 1985 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

DOCKET: 50-370 UNIT: McGuire 2

'DATE: 11/15/85 j NARRATIVE

SUMMARY

4 Month:- October, 1985 1

McGuire Unit 2 began the month at 100%. On 10/24 the unit tripped when power J: .

was lost to Nuclear Instrumentation Channel II, then returned to service on 10/25. The unit tripped on 10/26 due to a generator differential. The unit returned to service that evening and operated at 100% for the balance of the-i month.

i r

i

McGUIRE NUCLEAR STATION Monthly Operating Status Report

1. Personnel Exposure For the month of September, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release for September has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for September has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

i t

i

DuxE PowEn GOMPANY e.o. mox aanse cumwrre. x.c. ses4e HALH. TUCKER n u rssown T." ~ "_ November 15, 1985 m amm Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:- Document Control Desk Ret McGuire Nuclear Station Docket Nos. 50-369 and 50-370

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nucicar Station for the month of October,1985.

Very truly yours,

(/( (6L Hal B. Tucker JAR: sib Attachment ec: Dr. J. Nelson Grace, Regional Administrator American Nucicar Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INPO. Records Center U. S. Nuc1 car Regulatory Commission Suite 1500 MNBB-5715 1100 circle 75 Parkway Washington, D. C. 20555 Atlanta, Georgia 30339 Mr. Darl Hood Ms. Judy Dovers Office of Nuclear Reactor Regulation Nuclear Assurance Corporation U. S. Nuclear Regulatory Commission 5720 Peachtree Parkway Washington, D. C. 20555 Norcross, Georgia 30092 Mr. W. T. Orders NRC Senior Resident inspector McGuire Nuclear Station p