DEC 311985 Docket No. 50-443 Public Service of New Hampshire ATTN: Mr. Robert J. Harrison President and Chief Executive Officer P. O. Box 330 Manchester, New Hampshire 03105 Gentlemen:
Subject:
Fire Protection Safe Shutdown Inspection - Seabrook Nuclear Power Station, Unit 1 This letter is to inform you of our plans to conduct an NRC special announced team inspection on January 27-31, 1986 of your facility with regard to the ability to provide safe shutdown in the event of a fire.
To effectively conduct the inspection, we request that analyses, procedures and other documentation on this subject, be available at the site during the inspection.
If possible, engineering personnel knowledgeable of your efforts in this area should also be available.
In addition, we are requesting that one set of such. documentation be made available to the team at the Region I office of the NRC in King of Prussia, Pennsylvania, before January 10, 1986.
We previously discussed this information request with your staff and we have made arrangements to have this information delivered to the NRC.
Your staff has indicated that a work location for the team in an area with easy access to the plant drawing files has been arranged. Additionally, we understand that personnel escorts will be available to allow team members ready access to all areas of the plant. We request that you specify a member of your staff as a primary point of contact for the team to meet with at the end of each' day to discuss any findings the team may have and to receive requests for additional information required to resolve any open issues.
Your cooperation with us during this inspection is greatly appreciated.
Should you have any questions, please do not hesitate to contact me at (215) 337-5283.
Ori::t:'t Cisned Byy Jacque p.Darr Stewart D. Ebneter, Director y
Division of Reactor Safety SW 18sn SI$"h3 0
0FFICIAL RECORD COPY PULLANI911 - 0001.0.0 12/26/85 gg li l
r,,
t-Duquesne Light Company-2 cc:
-John DeVincentis, Director, Engineering and Lict ising William B. Derrickson, Senior Vice President Warren Hall, Operational Services Supervisor Donald E. Moody, Station Manager - Seabrook Station Gerald F. Mcdonald, Construction QA Manager Public Document Room (PDR)
Local Public Document-Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Hampshire bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA R. Gallo, Section Chief, DRP V. Nerses, LPM, (Seabrook), NRR L. Whitney, DQASIP, IE J. Shapaker, PSB/NRR S. West, PSB/NRR A. Singh, PSB/NRR S. Pu11ani, DRS, RI A.-Krasopoulos, DRS, RI J. Taylor, BNL H. Thomas, BNL R. Hodor, BNL h
&f RI:DRS RI:DRS RI:DRP RI:DRS Pu11ani Anderson Gally Dur j
/1/17/Tr
/i,/q[e/
M @I
- U/
OFFICIAL RECORD COPY PULLANI911 - 0001.1.0 12/26/85 l
-