ML20136D676

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/85-30 on 850921-1018.No Violation Noted.Actions Taken to Correct Violation 07 in Insp Rept 50-271/84-21 Re Failure to Properly Bolt Separator/Shroud Head Assembly to Core Shroud Reviewed
ML20136D676
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/14/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20136D680 List:
References
NUDOCS 8511210344
Download: ML20136D676 (2)


See also: IR 05000271/1985030

Text

O

s

.

NOV 14 1985

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject: Inspection Report No. 50-271/85-30

This refers to the routine resident safety inspection conducted by Mr. W. J.

Raymond of this office on September 21 - October 18, 1985, at the Vermont

Yankee Nuclear Power Station, Vernon, Vermont. The inspection consisted of

observation of activities, interviews with personnel and document reviews.

The results of the inspection are described in the NRC Region I Inspection

Report enclosed with this letter and were discussed with Mr. J. P. Pelletier

of your staff at the conclusion of the inspection.

No violations were identified within the scope of this inspection.

Our inspector also reviewed the actions taken to correct the Violation

(84-21-07) involving the failure to properly bolt the separator / shroud head

assembly to the core shroud as identified in our letter to you dated December

6, 1984. We have no further questions at this time regarding your actions to

correct the violation and to assure the correct performance of routine main-

tenance activities.

Your cooperation with us is appreciated.

Sincerely,

%d D

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-271/85-30

8511210344 e51114

[A 0% gf

is

, ____a

c,

o

-

Vermont Yankee Nuclear Power 2

Corporation NOV 14 1985

cc w/encis:

Mr. R. W. Capstick, Licensing Engineer

Mr. W. F. Conway, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

bec w/encls:

Region I Docket Room (with concurrences)

DRP Section Chief

DRP Branch Chief

M. McBride, SRI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

Management Assistant, DRMA

.

/ Y

/, I:DRP 7 Rk: P I:DRP R

/

f Raymond / Milko Tripp n er

j 11/q/85 f 11/$ /85 11/y/85 11//85

0FFICIAL RECORD COPY IR VY 85-30 - 0002.0.0

11/13/85

_ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ _ _ _ -