ML20136D680

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/85-30 on 850921-1018.No Violation Noted.Actions Taken to Correct Violation 07 in Insp Rept 50-271/84-21 Re Failure to Properly Bolt Separator/Shroud Head Assembly to Core Shroud Reviewed
Date released: 05/29/2020 Download: ML20136D680


Insp Rept 50-271/85-30 on 850921-1018.No Violation Noted. Major Areas Inspected:Actions on Previous Insp Findings, Plant Shutdown Operations,Plant Physical Security,Followup of Events & Refueling Activities
ML20136D714
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/14/1985
From: Raymond W, Lester Tripp
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20136D714 (21)
Forwards Safety Insp Rept 50-271/85-30 on 850921-1018.No Violation Noted.Actions Taken to Correct Violation 07 in Insp Rept 50-271/84-21 Re Failure to Properly Bolt Separator/Shroud Head Assembly to Core Shroud Reviewed
ML20136D676
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/14/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: MURPHY W P
VERMONT YANKEE NUCLEAR POWER CORP.
References
Download: ML20136D676 (2)