- _

/s12,nj

.\

.USNRC

A NTA. REC8?

7 g / '.f. '23 All 42 TELECOPY ,

4 Mt. J. F. O'Reilly, Director e August 23. 1979 -

  • t:55RC - Of fice of Inspection & Enforcement 101 Marietta St.. Suite 3100 Atlanta. CA 30303 Re: Docket 50-302 Licensee DPR-72 This is to confirm a report to Mr. D. Quick of your ottice at 1608 on 22 August 1979 that at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on 22 August 1979 an unplanned release of radioactive s liquid occurred when the Turbine Building surp was puttred to the settling pcod.

This is cor.trary to EIS 2.4.1.A and is reported under the provisions of E!S 5.6.2.A(2).

The calculated activity f or the apprexinete 27.000 gallen ccepcsite sample van

~

76 Mrc's_with a total activity of 71.12 uc.

The isolation valve fro:s the Turbine Building mut? to the settling pend has been closed and locked and is under Administrative control.

A detailed repcrt of this event will follow within fourteen (14) days.

Guy P. Beatty, Jr.

Nuclear Flant Mgr.

Crystal River l' nit #3 '

Ticrida Power Corporation g ,, p

/ W wom8 *

'I a s s.s. W ' - -

a s.usum g gaa

/rc .

& #useur I' a oss .

e i

\

.~

96 3 .-

l W00NOE{ DOCKT12 cgyi_ .. .

l

~

7909190kk7 P  !

..