OPERATING DATA REPORT DOCKET NO. 050-0331 DATE 11-15-85 COMPLETED BY Bradford Thomas TELEPHONE 319-851-7309 OPERATING STATUS Petes
- 1. Imit Name Duane Arnol d Eneray Center
- 2. Reporting Perloj October, 1985
- 3. Licensed Thermal Power (MWt):
1658
. 4. Nameplate Rating (Gross MWe):
565 (Turbine)
- 5. Design Electrical Rating (Net MWe):
538
- 6. Maximum Dependable Capacity (Gross MWe):
545
- 7. Maximum Dependable Capacity (Net MWe):
515
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since the Last Report, Give Reasons:
' 9. Power Level to Which Restricted, if Any (Not MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 745.0 72 %.0 94224.0
- 12. Number of Hours Reactor Was Critical 745.0 3269.2 65857.9
- 13. Reactor Reserve Shutdown Hours 0
0 150.3
- 14. Hours Generator On-Line 745.0 3247.8 64095.5
- 15. thlt Reserve Shutewn Nurs 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1008216 4398324 80858259
- 17. Gross Electrical Energy Generated (MWH) 344090 1470540 27057894
- 18. Net Electrical Energy Generated (MWH) 323554 1378927 25335078
- 19. thlt Service Factor 100.0 44.5 68.0
- 20. thlt Availability Factor 100.0 44.5 68.0
- 21. thlt Capacity Factor (Using MDC Net) 84.3 36.7 52.2
- 22. thlt Capacity Factor (Using DER Net) 80.7 35.1 50.0
- 23. thit Forced Outage Rate 0
0 16.3
- 24. Shutcbwns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
April, 1986 Maintenance Outaqe, d; ration to be determined.
- 25. If $ hut Down At End Of Report Period, Estimated Date of Startup:
N/A 8511200107 8 1115 ggf773 POR ADOCK 0 331 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0331 UNIT Duane Arnold Energy Center '
b DATE 11-15-85 COMPLETED BY Bradford Thomas TELEPHONE 319-851-7309 MONT84 October, 1985 e
DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL (MWe-No t)
(MWe-No t)
I 54 2 17 35 3 2
54 0 18 350
.3 537 19 35 8 4
537 20 34 6 i
5 541 21 34 5 6
53 22 M2 7
54 0 23 34 6 l*
8 5 34 24 34 6 i
9 543 25 350 10 54 5 si 34 6 It' 5 39 27 35 3 12 520 28 351
+
~l3 5 38 29 34 5 14 527 30 34 9 15 394 31 34 9 16 -
34 3 l
INSTRUCT 10NS On this format, list the average daily uni t power level in MWe-Net for each day In the reporting month. Compute the nearest whole megawatt.
(9/77) l I
b l
f
[
I I
Dockot No, 050-0331 Unit Name Duane Arnold Energy Center Date 11-15-85 MAJOR / SAFETY RELATED MAINTENANCE Completed by Bra df or d Thomas Telephone E 9-851-7309 l
l DATE SYSTEM COMPONENT DESCRIPTION 10/04/85 Control Rod Drive (CRD)
'A' CRD Pump Removed
'A' CRD pump from service to repair minor leaks in the pump seal cooling piping l10/05/85 Drywell Sump DryweII Sump Timers Replacement of inoperable dr y w e l l sump l
timers (LER 85-042) l10/07/85 River water Supply (RWS)
RWS
'C' Pump Motor Replaced pump motor
!10/09/85 Res i dua l Heat Removal Service RHRSW
'C' Pump Discharge Removed from service for plannod Water (RHRSW)
Check Valve maintenance on discharge Check valve, Radiation Protection Offgas (Post-Treatment)
Replaced ba d coaxia l cable Ra di a t ion Monitor connector 10/14/85 Emergency Diesel Generator
'B' Emergency Diesel Generator Quarterly blower l o be inspection Emergency Service water (ESW)
'B' ESW Pump Repacked pump 10/16/85 Emergency Diese Generator
'A' Emergency Diesel Generator Quarterly blower lo be Inspection
- 10/23/85 Core Spray
'B' Core Spray Piping Hy draulle Replaced a leaking hy draul le snubber Snubber
- 10/24/85 River water Supply (RWS)
'B' RWS Pump Ref urbishe d pump 10/25/85 Electric Fire Pump Minimum Flow Valve Replaced va lve operator coup ling nut
. I l
m m
t mm
- e se
=e O
y N
e w
@ M O,
n Pe n ne me t=
n O
O e.
e
==
=
e N
&w
.J
- g g m m O O (D > m g
e e i e a e e 4 e y
a e
sype O,O > 0.m.m a m e o u ea W O n 4,
D
+-G O
O,,
.m.
s a m -
-a. -e -. o
.O e.
e e
~4 m-O, e a v s
,4 O,
Duration uO e e a ea 4 h
-ee
-44 n
O a
=
(Hours) o -
a.
em e
e
- e a e
a 0,
- e 3m4
,ea
=4 w,
e
- 4 C
o, 3 i
= <,
a m
e -
ee m
z 2
n.
m
- ~
=
m x
Reason O
a.
~
m.
M m
O 0
O, V
-4 w
f=
=
O n
e E
x Method of
?
Shutdown or Power o
3 m
Reduction a.
u 4
0 m
==
D 7
N e
e m
.a m
O O
a a
u mn
.e 8
=
O, < e s:s e
.3
.+
3 o
O a
=
e
=m W
YY-!
System 4
O D E E 4 4
foue A
4 C e m 7 v
2 4 3 3 O eO C C a "I
3 e e **
Component O
5 O
M - m I
goge e n n, O
=4 v c0
-mme e
==
3 n me n n
-e me W o
e 4 4 e 3
e"1 u 9 4
w E
"O 2 Q O2 O
e e 2 e
O u e 3 & 4 g O 4 3 e4 eee
== 3 p
h 3 9 W
(D O
O
== n
=e "I
==
c m
m Omm*m N
e I
e o
M
== 4 3 O M eu e
n
==
3 0
2 04 e 4 "1
2 O
O m
W e O
==
ao 3 "I
=
+ a e
o O
e w
w 44 "O &
C e C
=e "I
W D
W e
"I e
8 g
se "I
==
=
e 4
3 4
= me 4
==
e2 O
- l u
=4 0
.e O e m, ()
C e O
2
=
e e n e
O a
0, e
a 4 e -
e C 3
me 4 W 4 3 C n a
m
== W e
9 3
4 3e a + 0 4 e
a-r= 0 J "1
O "I
m m
"1 C
3 O
- D 0 n 4
C w
F*
- 4 40 O
t
==
n 9 n OO e
e
== 0 m 3 3
3 4 W 4
==eW e e,
o j
a e 2
Cm m
l
Docke t No. 050-0338 Uni t Name Duane Arnold Energy Cen ter Da te 11-15 85 Comp l e ted by Bradford Thomas Telephone 319-858-7309 REFUEllNG INFORMATION 1.
Name of f acil i ty.
l A.
Duane Arnold Energy Cen ter 2.
Scheduled date f or nex t ref ueling shu tdown.
A.
1987 3.
Scheduled date f or res tart f ollowing ref ueling.
A.
1987 4
Will refueling or resump tion of opera ti on thereaf ter require a technical specif ica tion change or other license amendment?
A.
None curren tly Identitled S.
Scheduled dete(s) f or submi tting proposed licensing ac tion and supporting In f orma tion.
A.
None currently i den ti t led 6.
Impor tan t licensing considera tions associa ted w i th refueling, e.g.,
new or different fuel deslan or supplier, unrevleved design or performance ana lysis me thods, significant changes in fuel design, new operating procedures.
No.
7 The number of fuel assemblies (a) In the core and (b) in the spent fuel s forage pool.
A.
al 368 b) 696 8
The present licensed spent fuel pool e forage capaci ty and the slae of any increase in licensed storage capacity tha t has been requested or is planned, la number of fuel assemblies.
A.
2050 9
The projec ted da te of the las t ref ueling tha t can be discharged to the spent fuel pool assuming th e present licensed capacity.
A.
1998 I
i l
Oschot No. 050-0331 Un i t Name Ouane Arnold Energy Center Date 11-15-85 Complete d by Bra df or d Thomas Telephone 519-851-7309 NARRATIVE
SUMMARY
OF OPERATINO EXPERIENCE 10/01/85 At the beginning of the month the Ouane Arnoid Energy Center was operating at 100% of rated power with 542 MWe not going out to the grid.
The plant was in day $ of a 30 day LCO for repairs to the 80' Hain Steam line Isolation valve-Leakage Control System (MSiv-LCS), and da y 2 of a 30 day LCO for repales to the
'B ' Resl dua l Heat Removal Service Water (RHR$W) pump discharge check valve.
10/02/85 At 200$ hours after completion of planned maintenance on the pump discharge check valvo, the
'B' RHR$W pump was returned to service thus en dlnq the 30-day LCO.
10/04/85 At 0733 hours0.00848 days <br />0.204 hours <br />0.00121 weeks <br />2.789065e-4 months <br /> the
'A' Control Ro d Dr i ve (CRO) pump was removed f rom service for repairs of minor leaks to the pump seal cooling piping.
At 1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br /> repairs were complete and the pump was returned to ser vice.
10/05/85 At ISIS hours a 7 day LCO was entered when personnel viewing the four Drywell Sump Timers noted three of the four timers did not start at the appropriate times during manual pumping.
Repales were completed on 10/11/85 at 2227 hours0.0258 days <br />0.619 hours <br />0.00368 weeks <br />8.473735e-4 months <br /> and the system was returned to service, thus cancelling the LCO.
(LER 85-042) 10/07/85 At 0747 hours0.00865 days <br />0.208 hours <br />0.00124 weeks <br />2.842335e-4 months <br /> the Fire Suppression System piping was aligned to the well water system In preparation for planned maintenance on the Main Fire Header Coollnq Tower Deluge System isolation valves. Maintenance activltles were completed at 16:40 hour s an d the system was aligned to the normal water supply and tested satisf actorily.
(Special Report 85-041)
At 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> the 80' core spray minimum flow valve f ailed to close dur ing a surveillance test.
The minimum flow seltch was recalibrated and testea satisfactorily.
l 10/09/0S At 0734 hours0.0085 days <br />0.204 hours <br />0.00121 weeks <br />2.79287e-4 months <br /> the Olesel Fire Pump was removed from service, placing the plent in a 7 day LCO.
A belt was replaced on the engine and returned to service at I413 hours, thus cancelling the LCO.
At 0832 the 'Ce RHRSW pump was removed from service for planned maintenance on the discharge check valve, placing the plant in a 30 day LCO.
l Refurbishment of the valve was completed at 2237 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.511785e-4 months <br /> on 10/10/85 and the
(
LCO was terminated as the pump was returned to ser vice, l
At !!38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> a 7 day LC0 was entered when en Of f gas (post-treatment)
Radletion Monitor was dec l a r e d inoperable.
Repales were me de to the coaw I
cable connector an d the moni tor was returned to ser vice at 1725, thus en dlnq l
the LCO.
l t
i l
l
Do c ko t No. 050-0331 Unit Name Duane Arnold Energy Center Date 11-19-85 Completed by Bra df or d Thomas Telephone 319-851-7309 NARRATIVE SUM 4ARY OF OPER ATING EXPERI ENCE (Continued) 10/10/85 4t 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br /> both doo r s o f a seco n da ry containment alelock between the Reactor Buil ding an d Of f qas Retention Buil ding were ina dvertently opened together.
A loose wire was repaired and the doors were tes te d satisfactorily.
(LER 85-040) 10/14/85 At 0727 hours0.00841 days <br />0.202 hours <br />0.0012 weeks <br />2.766235e-4 months <br /> tne plant entered a 7 day LCO when the 80 ' Emergency Service Water pump was removed f rom service for planne d onlntenance.
The pump was repechod and returned to service at 16S3 hours, thus en ding the LCO.
At 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br /> the plant entered a 7 day LCO when the
'0' Emergency Diesel Generator (E00) was remove d f rom service for quarterly blower lobe
[
Inspection.
Inspection was completed with no discrepancies and the diesel was returned to service at IS26 hours on 10/15/85, thus ending the LCO.
10/15/85 Power was being re duced to a 350 MWe (not) to be maintained throughout the month in or der to opflmire fuel usage.
10/1d/e3 At 08S4 the
'A' Emergency Diesel Generator (E00) was removed f rom service for quarterly blower lobe inspection, inspection was complete d with no discrepancies and the diesel was returned to service at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />, thus en din 0 the LCO.
o 10/22/8S At 1520 hours0.0176 days <br />0.422 hours <br />0.00251 weeks <br />5.7836e-4 months <br /> the
'O' M$lV-LCS was declared operable af ter a f low transmitter was recellbrated and tested setlef actorily.
This terminated the 30 day LC0 entered on 09/26/85 10/23/8S At 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br /> the
'A' MSly-LCS was removed f rom service to replace an alarm I
relay.
A 30 day LC0 commence d, which was in da y 8 at the en d of the mo n t h.
At 1442 hott6 it was discovered that a snubber on the
'O' core spray piping was leaking f l u l d.
The plant entered a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCO which was cancelle d on 10/2S/85 at IS?O hours after the snubber was replaced and an engineering evaluation had determined it-had always been capable of performing it's desinn function.
10/25/8S At 14 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> the Pos t-Acc i dent Samplin0 System was dec l ar e d Inoperable 'ev e to a loose viel position limit switch.
A 90 day LCO was commenced which was i
in day 6 at the en d at the month.
l At ISSI hours the plant entered a 7 day LC0 when the electric fire pump was l
de c l a r e d inoperable.
The operator ha d come loose on the pump di sc h a r ge valve.
The operator was flohtened and the valve tested satis f actorily.
The pump was returned to service on 10/28/85 at 1859 hours0.0215 days <br />0.516 hours <br />0.00307 weeks <br />7.073495e-4 months <br />, thus on ding the LCO.
l l
l i' l
Dochot No. 050-0331 Unit Name Duane Arnol d Energy Center Date 11-15-85 Completed by Bra df or d inomas Telephone 319-851-7309 NARR ATIVE
SUMMARY
OF OPER AflNG EXPERIENCE (Continue d) 10/28/85 At 0725 hours0.00839 days <br />0.201 hours <br />0.0012 weeks <br />2.758625e-4 months <br /> a channel on the torus level Instrumentation snowed erratic readings an d was de c l a r e d inoperable.
At 1058 hours0.0122 days <br />0.294 hours <br />0.00175 weeks <br />4.02569e-4 months <br /> an Of f ges Stack Radiation Monitor was dec l a r e d Inoperable an d a7 day LCO was entered. Repales were ma de an d the monitor was returned to t
service at 0821 hours0.0095 days <br />0.228 hours <br />0.00136 weeks <br />3.123905e-4 months <br /> on 10/30/85, thus en ding the LCo.
At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> the fire suppression nystem was aligned to the well water system to permit for planned maintenance on the main fire hea der coollnq tower deluge system isolation valves. Maintenance activities were completed at 1521 hours0.0176 days <br />0.423 hours <br />0.00251 weeks <br />5.787405e-4 months <br /> an d the system was allqne d to the normal water supply and tested satisf actorily.
(Special Report 85-041) 10/29/85 The NRC observe d Emergency Prepareoness Drill was conducted throughout the day.
r 10/31/85 At the end of the month the Duane Arnoi d Energy Center was producing 350 MWe (not).