OPERATING DATA REPORT DOCKET NO. 50-266 DATE November 6, 1985 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001

'0PERATING STATUS l

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES l

2. REPORTING PERIOD:

OCTOBER 1985

3. LICENSED THERMAL POWER (MWT): 1518.
4. NAMEPLATE RATING (GROSS MUE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.

l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.

'8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWED LEVEL'TO WHICH' RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REthDN' FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE l

l THIS MONTH YR TO DATE CUMULATIVE l

11. HC6..'_

....J?JRTING PERIOD 745 7,296 131,376 r

12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,510.4 106,009.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 4.7 634.4
14. H0' RS GENERATOR ON LINE 745.0 5,455.3 103,442.8 J

~

15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 804.0 l
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,124,219 8,008,382 140,957,359

[

g

17. GROSS ELECTRICAL ENERGY. GENERATED (MWH) 386,510 2,748,270 47,393,510 E
18. NET ELECTRICAL ENERGY GENERATED.(MWH) 370,078 2,625,891 45,092,039

' QL

19. UNIT SERVICE FACTOR 100.0 74.8 78.7
20. UNIT AVAILABILITY FACTOR 100.0 74.8 79.3

-=

$o

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.4 74.2 70.3
22. UNIT CAPACITY FACTOR (USING DER NET) 99.9 72.4 69.1

. l

23. UNIT FORCED OUTAGE RATE 0.0 0.1 2.3
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, PATE, AND DURATION OF EACH): Refueling and maintenance h)- [

outage scheduled to commence April 4, 1985.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN l.

- et:r DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l

f

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH OCTOBER, 1985 COMPLETE K a so TELEPHONE 414/277-2001 "a

a H tp o 9

.M "a

.'i t Pe in

- e au o

1s e n v 'g gy Cause and Corrective Action o

ne No.

Date g

gc g

jgg

. Licensee Event g

p pm

.e v ;c Report No.

m eo To Prevent Recurrence o~

m gmg g

8 1

3 4

F: Forced Reason:

Method:

Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)

(NUREG-0161)

E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same

\\D-28B G-Operational Error (explain)

Source 01-78)

II-Other (explain)

_ = _. _

.3..._._.

DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE November 6, 1985 COMPLETED BY-C. W.' Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER, 1985

-AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 21 497 1

487 11 500 2

497-12 498 22 496 3

491 13 501 23 497

~

4 496 14 498 24 497 5

497 15 499 25 496 6

501 16 499 26 496 499 17 499 27 501 7

498 18 497 28 497 8

500 19 497 29 498 9

499 20 497 30 497 10 31 497 I

i EQR-28a (01-79)

l

' NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date November 6, 1985 Completed By C. W.

Krause Telephone 414/277-2001 Unit 1 operated at approximately 497 MWe net throughout the period with no significant. load reductions.

On October 2, 1985, a containment inspection team opened the outer door of the personnel hatch air lock.

When the outer door was opened, the inner door became unlatched and containment integrity was lost for a few seconds.

The problem was identified as an interlock. failure between the outer and inner air lock doors and was subsequently repaired.

The NRC was notified of this event via the red phone and LER 85-008 was issued.

On October 9, 1985, during a test of the nuclear instrument-ation (NI) power range, a 2% turbine runback was caused when a technician incorrectly operated the runback bypass switch.

LER-009 was issued for this event.

Safety-related maintenance included repair of a leaking service water pump, repair of the motor on the 4D diesel generator lube oil sump circulating pump, and replacement of the glycol cooler on the 4D diesel generator.

F OPERATING DATA REPORT DOCKET NO. 50-301 DATE November 6, 1985 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIOD:

OCTOBER 1985

3. LICENSED THERMAL POWER (NUT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MUE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 745 7,296 116,161
12. NUMBER OF HOURS REACTOR WAS CRITICAL 103.0 6,654.0 102,626.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.1
14. HOURS GENERATOR ON LINE 99.0 6,650.0 100,959.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 198.1
16. GROSS THERMAL ENERGY GENERATED (MWH) 141,568 9,997,906 141,750,878
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 48,150 3,400,100 48,040,240
18. NET ELECTRICAL ENERGY-GENERATED (MWH) 43,808 3,248,339 45,759,744
19. UNIT SERVICE FACTOR 13.3 91.1 86.9
20. UNIT AVAILABILITY FACTOR 13.3 91.1 87.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 12.1 91.8 80.3
22. UNIT CAPACITY FACTOR (USING DER NET) 11.8 89.6 79.3
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOVEMBER 22, 1985 DATA REPORTED AND FACIORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 REPORT MONTII OCTOBER, 1985 COMPLETED Y

a e

TELEPIlONE 414/277-2001 I

m 4

C M U1 o e

on N

oCe G9 C

r-e

,4 m C

r4 o eo en o

ou o

mee om ao No.

Date g

gg g

jgg Licensee Event y

g'g Cause and Corrective Action e

om

.o v4 Report No-m so To Prevent Recurrence o-a; omc o

E M

U oA 1

851005 S

645 C

1 N/A ZZ ZZZZZ:

Commenced refueling and maintenance outage 1

3 4

F: Forced Reason:

Method:

Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER Fil@

D-Regulatory Restriction 4-Other (explain)

(NUREG-0161)

E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)

Source (01-78) 11-Other (exrplain)

I

~

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE November 6, 1985 COMPLETED BY - C.

W.

Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER. 1985 AVERAGE AVERAGE AVERAGE l

DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET l

493 11

-2 21

-2 l

l 2

472 12

-2 22

-2 l

3 494 13

-2 23

-2 4

446 14

-2 24

-2 5

-7 15

-2 25

-2 6

-10 16

-2 26

-2 7

-11 17

-2 27

-2 l

-6 18

-2 28

-2 8

9

-2 19

-2 29

-2 10

-2 20

-2 30

-2 31

-2 EQR-28a (01-79)

O NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date November 6, 1985 Completed By C. W.

Krause Telephone 414/277-2001 Unit 2 operated at approximately 494 MWe net until October 4, 1985 when refueling ramp-down commenced at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />.

The generator was taken off line at 0211 hours0.00244 days <br />0.0586 hours <br />3.488757e-4 weeks <br />8.02855e-5 months <br /> on October 5,

1985, and at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />, the reactor was subcritical.

The unit operated during all of the 319 days since the previous refueling, with the generator being taken off line only once for about six hours.

The unit operated for the last 298 consecutive days without any significant power reductions.

On October 28, 1985, during a fuel inspection, assemblics L56 and L59 were discovered to have some damaged fuel cladding due to baffle jetting.

A visual inspection of the suspect baffles is planned.

If evidence of baffle joint gaps is found, an attempt will be made to gauge them.

A licensee event report will be issued regarding this event.

Maintenance activities conducted during this period included eddy current testing of the steam generator tubes, plugging of 10 tubes in the "A" and 44 tubes in the "B"

steam generator, and ultrasonic testing of the control rod guide tube split pins.

Work is currently under way to replace four split pins with crack indications.

Several minor repairs were made to valves on miscellaneous safety-related systems.

L

o l%SC0nSin Electnc eowra couraur 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI $3201 VPNPD-85-511 NRC-85-120 November 11, 1985 Director of Nuclear Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of October 1985.

Very truly yours,

/

gie

/ w()

C. W.

Fay Vice President Nuclear Power Attachments Copies to R. S. Cullen, PSCW J. G. Keppler, NRC Region III NRC Resident Inspector

,1,