Text

Table 2.2-1 1.ULLSTONE NUCLIAR POWER STATION - UNIT No.

2 EFFLUENT AND WASTE DISPOSAL PIPORT

lch, LIQUID EFFLUENTS - SU.WATION OF ALL PILEASES m

Year 3o82 Units W^TALS Errer,h JANUARY TIERUARY MARCH 20 A. Fission and Activation Products

1. Total released (not in-l C1
1. 26E-01' 3.62E-01 1.16 E+00 1.65E+00 1.50E401 cludir.Cii-3, Gases, Alpha)
2. Average diluted con-

~ ~ ~ ~ - ~

2 /nl 1.51E-07 1.65E-07 1.98E-08 2.66E-08 cen.ratica du-ing period *

3. Fercent of applicable li=it **

1.26E+00 3.62E+00 1.16E+01 1.65E+01

    • Based en limit of 10.0 curies per quarter - E.T.S., 2.4.1.2.E
3. Tritium ly.TottiReleased

%f)

Ci 2.6kE-01 1.k2E+00 5.76E+00 7.khE+00

1. 50EQ1
2. Averare diluted cen-ceni.ratien du*ing period o Ci/:1 3.16E-07 6.L6E-07 p.78E-OS 1.20E-07 C. Dissolved and Entrained Geses 1
1. Total Released Ci 6 5.10E-04
  • h.5BE-ok 7.28E-02 T.28E-02 1 50E*01
2. Average diluted con-

~

ccr.tration during period

  • 2CI/^1 1.2hE-09 1.18E-09 fDR509250169 850912 ADOCK 05000245 D. Gross Alpha Radioactivity R

ppg

1. Total Ecleased Ci 6 L.kOE-06 51.16E-05 fl.13E-03 1*50E*01
  • During periods of actual release.

) Volume of waste re-geesed(Prior to dilution) literc 1.10E+05 1.19E+06 2.26E+07 2.39E+07 1.00E+01 F. Volume of dilution liters 1.20 E+11 1.10 E+11 1.46 E+11 3.76 E+11 1.00E+01 water used during per3od

Table 2.2-1 (Continusd)

MIIl. STONE NUCLEAR POWER STATION - UNIT No.

2 EFFLUDiT AND WASTE DISPOSAL PIPORT

,m, LIQUID EFFLUENTS - SU!a.% TION OF ALL RELEASES 7.1 zear 1982 Units APRIL MAY JUNE QUARTERLY Est. Total TOTALS Error, %

A. Fissien and Activation Products

1. Total released (not in-Ci 3.5kE+00 3.32E+00
3. 08E+00 9.9kE+00 1.50E+01 cluding H-3, Gases, Alpha)
2. Average diluted con-

- aci/ml k.29E-08 3.91E-08 3.57E-08 3.91E-08 centration during period.

3. Per::ent of applicable 11:11 **

-5 3.5kE+01 3.32E+01 3.08E+01 6. 8 6 E+01

    • Based on limit of 10.0 curies per quarter E.T.S., 2.4.1.2.E - e f f ee tive unti1 May 28, 1982 at which time the dose limits indicated in Table 2.3-1 E. Tritingec ame effe tive.

(E.T.S.

2.4.1.2.D)

1. Total Released Ci 2.3TE+01 2.56E+01 3 90E+C1
8. 83E+01 1.50E'01

[

.^e C Average diluted con-I centratien curing period - 2Ci/=1 2.87E-07 3.01E-07 k.53E-07 3.h8E-07 C. Dissolved and Entrained Gases

1. Total Released

-4 Ci 5.18E+00 1.80E+00 2.71E+00 9.69E+00 1.50E+01 I

k

2. Average diluted con-centration during period
  • u01/=1 6.27E-08 2.12E-08 3.1hE-08 3.82E-08 D. Gross Alpha Radioactivity
1. Total Release'd Ci

$ 7.19E-Oh 63.8kE-Oh 56.36E-Oh l.50E+01

  • During period of actual release.

1 I

Volume of waste re-led (Prior to dilution) li c'.

1.7 9E+07 1.27E+07 1.26E+07 i.32E+07 1.00E+01 F. Volume of dilution l

nier used during period liters 1.59 E+11 1.70 E+11 1.67 E+11 4.96 E+11 1.00E+01 i.

TABLE 2.2-1 1CLLSTONE NUCLEAR PO'.'.'ER STATION - UNIT No.

2 EFFLUDC AND WASTI DISPOSAL REPORT _

LIQUID EFFLUDUS - SUh lATION OF ALL RILEASES t

Year N Units QUARTERLY Est. Tetal JULY AUGUST SEPTE'GER TOTALS Errer, 5 A. Fissien and Activation Products

1. Total released (not in-cluding H-3, Cases, Alpha)

Ci 6.86E-01 1.20E-01 3.33E-01 1.1LE+ 00 1.5CE+01 l

2. Average diluted con-centratien during period
  • aci/d 8.05E-09
1. L 9E-09 3.33E-09 L.29E-09

,3. Fercent of applicable

3....

3 0.54

    • Based on limit of 1.5 mrem whole body dose per quarter - E T S
3. Tritiun 2.4.1.2.D
1. Total Released Ci

\\

\\

5 97E+01 2.35E+01 2.9BE+01 1.13E+c2

2. Average diluted con-i centration during period
  • 101/=1 7.01E-07 2.91E-07 2.99E-07 L.25E-07
..)

C. Dissolved and Intrained Gases a

e eased Ci

2. Average diluted con-1.50E+01 centratien during period uCi/=1 1.18E-07 h.60E-08 7.83E-09 5.L9E-08 D. Gross Alpha Radioactivity
1. Total Eclehsed Ci s

s 6 1.98E-Oh

$ 2.29E-Oh 6 2.30E-OL

1. 50E+ 01 During periods of actual release.

E.

Volt e of waste re-leased (Prior to dilution) iters

-9.h5E+06 1.23E+07 1.L6E+07,

3.6LE+07 1,003.o1 F. Volune of dilution

=ater used during period iters l.65 E+11 1.76 E+11 1.33 E+11 4.74 E+1

3 TABLE 2.2-1 (Continusd)

}/ILLSTCNE NUOLEAR POWER STATION - UNIT No.

?

EFFLUDi' AND WASTE DISPOSAL REPORT LIQUID EFFLUDiTS - Sm. NATION OF ALL RELEASES h,; w,f.' Year icS2 Units QUARTERLY Est. Total OCTOBER NOVEMBER DECDGER TOTALS Errer. %

[

A. Fission and Activation Products

1. Total releasef.(not in-0i cluding H-3, Gases, Alpha)

W -m m -M W -m 1.SE+00 l'Oc '01

2. Average diluted con-

,ggjmy centration during period

3. Percent of applicable 0.87 limit **
  • Based on lim of 1.5 mrem whole body dose per quarter - E.T.S. 2.4.1.2.D
3. Tritiu
1. Total Released C1 1.83E+01 h.30E+01 2.13E+01 8.26E+01 1.50E+01
2. Average diluted cen-1C1/=1 4xen*ratien during period
  • 8.93E-08 1.LLE-07 2.072-07 1.L7E-07 myf t

%/

C. Dissolved and Entrained Gases

1. Tctal Released 1

C^4 1.50Z'01 I

1.91E+00 5.10E+00

1. 96E+00 8.97E+00 l;
2. Average diluted con-uCi/ml centration curing period
  • 9.32E-09 1.71E-08 1.90E-08 1.51E-OS D. Gross Alpha Radioactivity
1. Total Ecleased Ci 2.12E-Oh 6 4.30E-Oh f.L.28E-Ch
  • During periods of actual release.

E.

Volune of waste re-li e,.

1.00I+01 leased (Prior to dilution) 1.26E+07 1.35E+07 1.56E+07 h.17E+07 lF.Voluaeofdilution 1.00E+01 liters I

-syter used during period 9.62 E+10 y 1.31 E+11' l.53 E+11 3.81 E+11 J