Accepts 850731 Revs to 850517 Proposed safety-related Instrument Tubing Program.Compliance W/Requirements Provides Quality Level Commensurate W/Importance of Safety Functions of Attached Fluid Sys
ML20135G232
Person / Time
Site: Beaver Valley
Issue date: 09/09/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-64978, NUDOCS 8509180311
Download: ML20135G232 (3)


Text

  • < .

Docket No.: 50-412 SEP 9 1985 DISTRIBUTION w Docket:;.50-4123 NRC PDR LPDR Mr. John J. Carey NSIC Vice President, Nuclear PRC System Duquesne Light Company LB#3 Reading EJordan Robinson Plaza Building, No. 2, Suite 210 JLee ACRS(16)

PA Route 60 BKSingh Pittsburgh, Pennsylvania 15205 Attorney, OELD JPartlow

Dear Mr. Carey:

BGrimes

Subject:

Safety-Related Instrument Tubing Program for Beaver Valley Power Station Unit No. 2

References:

1. Letter 2NRC-5-072 from J. J. Carey, Duquesne Light Company to G. W. Knighton NRC, dated May 17, 1985.
2. Letter 2NRC-5-113 from J. J. Carey, Duquesne Light Company to G. W. Knighton NRC, dated July 31, 1985.

i By a letter dated May 17,1985, (Reference 1), the DLC proposed a safety-related instrument tubing program. Subsequently, the DLC proposed a number of revisions to the instrument tubing program via a letter dated July 31, 1985 (Reference 2).

These revisions are identified in Reference 2 which includes in Attachments 1 through 4 an updated version of the program. The staff finds the proposed revisions to the safety-related instrument tubing program as identified in reference 2, acceptable. Compliance with these requirements provides a quality level that is commensurate with the importance of the safety functions of the attached fluid systems.

Should ou have any questions please contact the Project Manager, B. K. Singh,

. at(301 492-8423.

Sincerely, ORIGINAL Sl8NED BY George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing cc: See next page

\h DL:LB#

DL:

BKSingh/yt G ton 9/S/85 9/f/85 i

_ kf

  • i .

Duquesne Light Company Beaver Valley 2 Power Station cc:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Engineering Jay E. Silberg, Esq. Beaver Valley Two Project Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 1800 M Street, N.W. Robinson Plaza Building No. 2, Suite 110 Washington, DC 20036 PA Route 60 Pittsburgh, Pennsylvania 15205 Mr. C. W. Ewing, Quality Assurance Zori Ferkin

, Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Mr. John J. Carey Vice President, Naclear Duquesne Light Company Director, Pennsylvania Emergency P. O. Box 4 Management Agency Shippingport, Pennsylvania 15077 Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thones Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. Glenn Walton U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229

~

o-  ;-

Duquesne Light Company Beaver Valley 2 Power Station cc:

Mr. E. F. Kurtz, Jr., Manager Regulatory Affairs Beaver Valley Two Project Duquesne Light Company Robinson Plaza Buidling No.-2 Suite #210 PA Route 60 Pittsburgh, Pennsylvania 15205 48 9

9