Forwards SER Re Control Complex Dedicated Cooling Sys for post-fire Alternate Shutdown Capability.Design of Control Complex Dedicated Cooling Sys Meets Requirements for Sections III.G.3 & Iii.L of 10CFR50,App R & Acceptable
ML20135F878
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/11/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20135F881 List:
References
NUDOCS 8509180001
Download: ML20135F878 (2)


Text

September 11, 1985 hw3 o\%

Docket No. 50-302

Mr.' Walter S. Wilgus

.Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing

& Fuel Management P. O. Box 14042; M.A.C. H-3 St. Petersburg, Florida 33733

Dear Mr. Wilgus:

After our review of the safe shutdown capability of Crystal River Unit 3 (CR-3) in the event of a fire, we noted in our letter of January 6,1983 and the accompanying Safety Evaluation (SE) that we would provide a separate review of your design for a dedicated HVAC system to provide ventilation and cooling for control complex equipment. You submitted a conceptual design for such a system by letter dated January 2, 1985.

We have completed our review of that submittal and conclude that the design of the control complex dedicated cooling system meets the requirements of Sections III.G.3 and III.L of Appendix R to 10 CFR Part 50, and is therefore acceptable. We further confirm our previous conclusion in the SE of January 6, 1983 regarding alternate shutdown capability at CR-3.

Sincerely, "CGIGlhAL SIGED M J0U:i Fy @=.r-John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc: See next page DISTRIBUTION GEdison JWermiel Gocket Film JPartlow NRC PDR ACRS-10 L POR RIngram ORB #4 Rdg HSilver HThompson Gray File

- 0 ELD EBrach 8509180001 850911 EJordan H0rnstein PDR ADOCK O g2 BGrimes WPaulson

. d$

ORB #4:DL 3

ORB #4:DL HSilver;cf JStolz 9/ll/85 9/jl/85

Mr. W. S. Wilgus Crystal River Unit No. 3 Nuclear Florida Power Corporation Generating Plant cc:

Mr. R. W. Neiser Bureau of Intergovernmental Relations Senior Vice President 660 Apalachee Parkway and General Counsel Tallahassee, Florida 32304 Florida Power Corporation P. O. Box 14042 Mr. Wilbur Langely, Chaiman St Petersburg, Florida 33733 Board of County Comissioners Citrus County Nuclear Plant Manager Inverness, Florida 36250 Florida Power Corporation P. O. Box 219 Crystal River, Florida 32629 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector U.S. Nuclear Regulatory Comission Route #3, Box 717 Crystal River, Florida 32629 Regional Administrator, Revion II U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia '30303 Mr. Ulray Clark, Administrator Radiological Health Services Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304