APPENDIX A

,

NOTICE OF VIOLATION

'

I

Texas Utilities Llectric-Company

Docket:

50-445/85-02

Comanche Peak Steam Electric

Construction Permit:

CPPR-126

Station, Unit 1

Based on the results of an NRC inspection conducted during the period of

January 1,.1985, through February 28, 1985, and in accordance with the NRC

Enforcement Policy,(10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8,

1984, the following violation was identified:

Failure to follow prescribed procedures

10 CFR 50, Appendix "B", Criterion V requires that, " activities affecting

quality shall be prescribed by documented instructions, procedures, or

drawings, of a type appropriate to the circumstances and shall be

accomplished in accordance with these instructions, procedures, or

drawings."

Contrary to the above, System Test Engineers (STEs) fa'iled to comply with

the administrative requirements of Startup Administrative

Procedure CP-SAP-12. " Deviations to Test Instructions / Procedures." During

routine inspection of the completed preoperational test data package for

-1CP-PT-29-01, " Diesel Generator Auxiliary Systems," the NRC inspector

noted several instances where the STE failed to make changes in accordance

with CP-SAP-12.

Errors in the procedure were either left uncorrected, or

in some cases, errors were corrected by unauthorized pen-and-ink

changes. Example of this can be found on step 7.3.12 and on data sheets

2, 6, 10 and 14.

Examples of this practice were found in other completed

preoperational test data packages which were brought to the attention of

the applicant's representative.

In each case the practice did not cause

the outcome of the test to be adversely affected; however, administrative

requirements in this regard are not being satisfied.

This is a Severity Level V Violation.

(SupplementII.E)(445/8502-05).

l

l

8509170137 850911

-

PDR

ADOCK 05000445

G

PDR

t

4

.. .

_ . _ .

-

-- _ ,,

- , , . . _ ,

-_. .

.

.._.

--

,

.

.-

_

- -

,

.

.

.

.

4

~

..

,

r

-2-

Pursuant to the provisions of 10 CFR 2.201, Texas Utilities Electric Company is

hereby required to submit to this office, within 30 days of'the dates of this'

notice, a written statement or explanation in reply, including: (1) the

.

!

' corrective steps which have been taken and the results achieved;-(2) corrective

j

steps which will be taken to avoid further violations; and (3) the date when

full. compliance will be achie'ved.

Consideration may be.given to extending your

. response time for good'cause shown.

1

SEP 11S

I

Dated:

?

i

)

i

i

,

,

i

5

'

'

g

%

,,

.

i

~

>

1

a.

t

2 9

5

e

su

!

-

.

4

i

i

.

p

-

w

y

,e

p-

-

d

--

t

<7-

e.

f--

ew1

-m

4ew--