Forwards Insp Rept 50-445/85-02 on 850101-0228 & Notice of Violation
ML20135F043
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/11/1985
From: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20135F045 List:
References
NUDOCS 8509170134
Download: ML20135F043 (2)


See also: IR 05000101/2002028

Text

. . . . _

.

-c - m

SE.P 11 1985

In Reply Refer To:

j Docket: -50-445/85-02

i

.

1 .

Texas Utilities Generating Company

ATTN: Mr. W..G. Counsil

Executive Vice President

400 North Olive, L.B. 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Kelley and W. F. Smith

, of this office during the period January 1 through February 28, 1985, of

activities authorized by NRC Construction Permit CPPR-126 for the Comanche Peak

Facility, Unit 1, and to the discussion of our findings with Mr. J. C.

Kuykendall and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included: (1) preoperational test results-

evaluation; (2) applicant actions on previous inspection findings; (3) plant

tours; and (4) plant status. Within these areas, the inspection consisted of

selective examination of procedures and repre::entative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

I Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

Three new unresolved items are also identified in paragraph 2 of the enclosed

inspection report. Unresolved Items are matters requiring more information in

order to ascertain whether they are acceptable items, violations or deviations,

a

g9170134850911

G ADOCK 05000445

PDR

'

RIV:RPB2 RPB2 RPB2/ RP DRS&P N

g ,

DKElley:ac WSmi DMHun utt DRH nter RPDenise VNoon

9/10/85 9 / io /85 g /to/85 4/ ti/85 /85 4/p /85

g 0I

_. .

aff.

.

.

-

Texas Utilities Electric Company -2-

The response directed by this letter and the accompanying notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

'

Criginal S",' II

IlichEd P N ' l

R. P. Denise, Director

. Division.of Reactor Safety

and Projects

Enclosure:

Appendix A - Notice of Violation

Appendix B - NRC Inspection Report

50-445/85-02

Texas Utilities Electric Company

ATTN: J. W. Beck, Manager,

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB * MIS System
  • RRI-0PS *RSTS Operator
  • RRI-CONST *R&SPB
  • T. F. Westerman, CPTG R. Denise, D/DRSP

V. Noonan, NRR R. Martin, RA

S. Treby, ELD Juanita Ellis, Pres.- CASE

  • RIV File Renea Hicks, A/ Atty General, EP Div.-TX
  • D. Weiss, LFMB (AR-2015)
  • w/766

.