_-
-
~~
(Akose-
q
.
.
50 E9 W
.
Duke Power Company
/ ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NO. 50-413/85-36
On August 5-9, 1985, NRC inspected activities authorized by NRC Operating License
No. NPF-35 for your Catawba facility.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-413/85-36
cy w/ encl:
6R. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bec w/ encl:
4. Johnson, ELD
4.,N. Jabbour, NRR
Document Control Desk
Sta_te of South Carolina
1
.
/
'
/
WRoss.bhg
J . lake
ierdt
8//b/85
41 /85
/p9/85
8509170005 850829
ADOCK 05000413
1
O
I
I
%