First Interim Deficiency Rept Re Deficient Documentation for Conduit Fire Stops in Unit 1 Diesel Generator Bldg.Initially Reported on 850724.Addl Work Required.Next Rept Will Be Submitted by 860221
ML20135E621
Person / Time
Site: Bellefonte Tennessee Valley Authority icon.png
Issue date: 08/20/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8509160476
Download: ML20135E621 (2)


Text

~1 1*

9 TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374o1 S5 g n26 400 Chestnut Street Tower II Alf August 20, 1985 BLRD-50-438/85-22 U.S. Nuclear Regulatory Commission Region II Attn:

Dr.-J. Nelson Grace, Ragional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANI UNIT 1 - DEFICIENT DOCUMENTATION FOR CONDUIT FIRE STOPS IN THE UNIT 1 DIESEL GENERATOR BUILDING - BLRD-438/85 FIRST INTERIM REPORT This subject deficiency was initially reported to NRC-OIE Inspector Linda Watson on July 24, 1985 in accordance with 10 CFR 50.55(e) as NCR 4414.

Enclosed is our first interim report. We expect to submit our next report on or about February 21, 1986.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY

,J. W. Hufham, Manager Licensing and Risk Protection Enclosure cc:

Mr. James Taylor, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8509160476 850820

^

hDR ADOCK 05000438 PDR

5

\\

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNIT 1 DEFICIENT DOCUMENTATION FOR CONDUIT FIRE STOPS IN THE UNIT 1 DIESEL GENERATOR BUILDING BLRD-50-438/85-22 NCR 4414 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency Conduit fire stop sealing program initiated in the unit 1 diesel generator building was performed under the requirements of Bellefonte Nuclear Plant (BLN) Quality Control Procedure (QCP) 3.5, " Penetration Fire Stops and Pressure and Moisture Seals," and cognizance of the Electrical Engineering Unit (EEU). At the time the seals were installed, temporary identification numbers were assigned to the documentation. After the installation activit; was completed, the Office of Engineering (OE) issued drawings depicting the official identification (reference SDWO816-RZ, -818 RZ series). An unsuccessful attempt was made by BLN personnel to reassign the completed documentation with permanent identification. Therefore, the actual status of the fire stop sealing program is indeterminate.

The apparent cause of the deficiency was due to an excessive overall work load, which caused the activity to not be adequately monitored, and the method of temporary identification was not applied consistently.

Interim Progress BLN Office of Construction (OC) has conducted a sampling of the seals in the unit 1 diesel generator building in accordance with BLN QCP 5.18, "Firestops, Moisture, Pressure, and Radiation Seals," and Military Standard (MIL-STD) 105D to check for cell structure and fill. The sampling identified that additional work will be required to complete the fire stop sealing program.

This will be done in accordance with the applicable site procedures.

TVA will provide additional information on this condition to NRC on or about February 21, 1986.

-.