Forwards Insp Repts 50-313/96-09 & 50-368/96-09 on 961222- 970201 & Notice of Violation
ML20135E086
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/28/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20135E089 List:
References
NUDOCS 9703060251
Download: ML20135E086 (5)


See also: IR 05000313/1996009

Text

_

.

  1. " "% g UNIT E D STATES

'

[, , .% NUCLEAR REGULATORY COMMISSION

-

R E GloN IV

,8 611 RYAN PL AzA DRIVE, SUITE 400

%.....# AR LINGT oN, T E X AS 76011 8064 l

FEB 2 81997 l

l

C. Randy Hutchinson, Vice President l

Operations i

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333 i

Russellville, Arkansas 72801-0967

SUBJECT: NRC INSPECTION REPORT 50-313/96-09:50-368/96-09 AND NOTICE OF

VIOLATION

l

Dear Mr. Hutchinson: l

An NRC inspection was conducted December 22,1996, through February 1,1997, at your ,

Arkansas Nuclear One, Units 1 and 2, reactor facilities. The enclosed report presents the I

scope and results of that inspection, j

!

During the 6-week period covered by this inspection, your conduct of activities at the ANO

facility was generally characterized by safety conscious operations, sound engineering and

maintenance practices, and appropriate radiological controls. Two violations of NRC

requirements were identified. The first violation resulted from the improper clearance of a

hold card while work on a 480 volt breaker was in progress. Although no personnel were

injured, this error created the potential for a personnelinjury or fatality. Significant

weaknesses were noted in the lack of communications between the control room

supervisor and shift superintendent and the failure of an auxiliary operator to question the

work being performed by the electricians in a panel that he knew was energized. Although

this violation satisfied the criteria to be noncited pursuant to Section Vll.B.1 of the NRC's

Enforcement Policy, it is being cited due to the potential significance of the issue.

Equipment isolation and restoration programs and the implementation of these programs

are principal barriers in ensuring both personnel and nuclear safety. The second violation

resulted from your failure to update the Unit 1 Updated Safaty Analysis Report (USAR). i

These violations are cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding the violations are described in detail in the enclosed report.

Please note that you are required to ret"ond to this letter and should follow the

instructions specified in the enclosed Nace when preparing your response. The NRC will

use your response, in part, to determine whether further er.forcement action is necessary

to ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary,

or safeguards information so that it can be placed in the PDR without redaction.

9703060251 970228

/(

PDR ADOCK 05000313

C PDR

.@ ,Q,

. . _ _ _ - - . .

l

i .

' Entergy Operations, Inc. -2-

,

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you. -

l Sincerely,

/

/ <

,

rthur T. Howell Ill, cting Director

Division of Reactor Projects

,

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

Enclosures-

1. Notice of Violation i

2. NRC Inspection Report l

50-313/96-09:50-368/96-09 l

cc w/ enclosures:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

I

Vice President l

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Mx. sager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300Twinbrook Parkway, Suite 330 l

'

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801 l

[

.. _ -. - =.

.

o

Entergy Operations, Inc. -3-

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

l

Bernard Bevill, Acting Director ,

Division of Radiation Control and l

Emergency Management '

Arkansas Department of Health j

4815 West Markham Street, Slot 30

Little Rock, Arkansas 72205-3867 l

1

1

Manager

l

Rockville Nuclear Licensing i

Framatome Technologies i

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

l

I

i

i

i

-

1

l

l

.

Entergy Operations, Inc. -4-

FEB 2 81997

!

E-Mail report to T. Boyce (THB) I

E-Mail report to NRR Event Tracking System (IPAS)  ;

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Don Taylor (DRT) l

I

bec to DMB (IE01) l

l

bec distrib. by RIV

L. J. Callan Resident inspector l

DRP Director MIS System

'

Branch Chief (DRP/C) RIV File

Project Engineer (DRP/C) DRS-PSB )

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)  !

I

1

,

i

!

l

l

l

'

DOCUMENT NAME: R:\_ANO\AN609RP.KMK

RIV: SRI C AC:DRP/C, N AD:DRPf N l

KMKennedy 4% LAYandell lg ATHo%ll i

"

02/0/97 02/1V97 02/J97 l

OFFICIAL RECORD COPY

l

1

_ _ _ . . -._

S'

W

!

Entergy Operations, Inc. -4-

FEB 2 81997

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Don Taylor (DRT)

bec to DMB (IE01)

bec distrib. by RIV  !'

L. J. Callan Resident inspector  !

DRP Director MIS System

Branch Chief (DRP/C) {

RIV File i

Project Engineer (DRP/C) DRS PSB

!

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10) '

I

l

l

l

1

l

i

!

l

l

I

l

DOCUMENT NAME: R:\_ANO\AN609RP.KMK

RIV: SRI C AC:DRP/C, N AD:DRPf N l l

KMKennedy 4%. LAYandelljg ATHo%ll

02/p/97 "

02/0/97 02/J97

OFFICIAL RECORD COPY