ML20135E086
| ML20135E086 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/28/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20135E089 | List: |
| References | |
| NUDOCS 9703060251 | |
| Download: ML20135E086 (5) | |
See also: IR 05000313/1996009
Text
_
.
- " "% g
UNIT E D STATES
'
[, ,
.%
NUCLEAR REGULATORY COMMISSION
-
R E GloN IV
,8
611 RYAN PL AzA DRIVE, SUITE 400
%.....#
AR LINGT oN, T E X AS 76011 8064
FEB 2 81997
C. Randy Hutchinson, Vice President
Operations
i
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
i
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/96-09:50-368/96-09 AND NOTICE OF
VIOLATION
l
Dear Mr. Hutchinson:
An NRC inspection was conducted December 22,1996, through February 1,1997, at your
,
Arkansas Nuclear One, Units 1 and 2, reactor facilities. The enclosed report presents the
scope and results of that inspection,
j
During the 6-week period covered by this inspection, your conduct of activities at the ANO
facility was generally characterized by safety conscious operations, sound engineering and
maintenance practices, and appropriate radiological controls. Two violations of NRC
requirements were identified. The first violation resulted from the improper clearance of a
hold card while work on a 480 volt breaker was in progress. Although no personnel were
injured, this error created the potential for a personnelinjury or fatality. Significant
weaknesses were noted in the lack of communications between the control room
supervisor and shift superintendent and the failure of an auxiliary operator to question the
work being performed by the electricians in a panel that he knew was energized. Although
this violation satisfied the criteria to be noncited pursuant to Section Vll.B.1 of the NRC's
Enforcement Policy, it is being cited due to the potential significance of the issue.
Equipment isolation and restoration programs and the implementation of these programs
are principal barriers in ensuring both personnel and nuclear safety. The second violation
resulted from your failure to update the Unit 1 Updated Safaty Analysis Report (USAR).
i
These violations are cited in the enclosed Notice of Violation (Notice) and the
circumstances surrounding the violations are described in detail in the enclosed report.
Please note that you are required to ret"ond to this letter and should follow the
instructions specified in the enclosed Nace when preparing your response. The NRC will
use your response, in part, to determine whether further er.forcement action is necessary
to ensure compliance with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response should not include any personal privacy, proprietary,
or safeguards information so that it can be placed in the PDR without redaction.
/(
9703060251 970228
ADOCK 05000313
C
.@
,Q,
. . _ _ _
-
-
.
.
l
i .
' Entergy Operations, Inc.
-2-
,
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
-
l
Sincerely,
/
/
,
<
rthur T. Howell Ill, cting Director
Division of Reactor Projects
,
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosures-
i
2. NRC Inspection Report
50-313/96-09:50-368/96-09
cc w/ enclosures:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Mx. sager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300Twinbrook Parkway, Suite 330
'
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
[
..
_
-.
- =.
.
o
Entergy Operations, Inc.
-3-
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
l
Bernard Bevill, Acting Director
,
Division of Radiation Control and
Emergency Management
'
j
4815 West Markham Street, Slot 30
Little Rock, Arkansas 72205-3867
1
1
Manager
Rockville Nuclear Licensing
i
Framatome Technologies
i
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
i
i
i
-
l
.
Entergy Operations, Inc.
-4-
FEB 2 81997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Don Taylor (DRT)
bec to DMB (IE01)
bec distrib. by RIV
L. J. Callan
Resident inspector
DRP Director
MIS System
Branch Chief (DRP/C)
RIV File
'
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
,
i
DOCUMENT NAME: R:\\_ANO\\AN609RP.KMK
'
RIV: SRI
C
AC:DRP/C,
N
AD:DRPf
N
l
lg
ATHo%ll
KMKennedy 4%
LAYandell
02/0/97
02/1V97
02/J97
"
OFFICIAL RECORD COPY
1
_
_ _ . .
-._
S'
W
!
Entergy Operations, Inc.
-4-
FEB 2 81997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Don Taylor (DRT)
bec to DMB (IE01)
bec distrib. by RIV
'
L. J. Callan
Resident inspector
!
DRP Director
MIS System
{
Branch Chief (DRP/C)
RIV File
i
Project Engineer (DRP/C)
DRS PSB
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
'
I
1
l
i
I
DOCUMENT NAME: R:\\_ANO\\AN609RP.KMK
RIV: SRI
C
AC:DRP/C,
N
AD:DRPf
N
l
l
KMKennedy 4%.
LAYandelljg
ATHo%ll
02/0/97
02/p/97
02/J97
"
OFFICIAL RECORD COPY