ML20135D797
| ML20135D797 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/09/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20135D800 | List: |
| References | |
| NUDOCS 8509160192 | |
| Download: ML20135D797 (2) | |
See also: IR 05000413/1985033
Text
pop
d
-
SAFEGUARDS INFORMATION
SEP 0 91985
Duke Power Company
ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-413/85-33
A special safeguards inspection was conducted by a member of the Region II staff
on July 16-17, 1985, of activities authorized by NRC Operating License No. NPF-35
for your Catawba facility. The NRC's concern relative to the inspection findings
was discussed with members of your licensing staff by telephone on August 14, 1985.
The purpose of this inspection was to review the circumstances of a security
event reported by the licensee concerning a degradation discovered in vital area
barriers.
'
Areas examined durir.g the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
"
Although this inspection revealed no new violations of regulatory requirements,
another example of the violation addressed in a latter to you dated July 17,
1985, was disclosed concerning the failure to implement and maintain in effect
the provisions of your Physical Security Plan regarding degradation of vital
area physical barriers.
In addition to the need for corrective action regarding the specific matters
previously addressed, we are concerned about your implementation of the manage-
ment control system that permitted this situation to . develop.
Consequently,
your response should describe those particular actions taken or planned to
prevent recurrence of these events and to improve the effectiveness of your
security program.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in NRC's Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
8509160192 850909
$M
ADOCK O
3
ENCLOSURE CONTAINS
SAFECUARDS INF0FMATION
SAFEGUARDS INFORMATION
ueon sseiniTron TaIs
PAGE IS DECONTROLLED. ]
$~0f
'
--m
'g
,
ww
-
SAFEGUARDS INFORMATION
.
.
SEP 0 9 S85
Duke Power Company
2
Should you have any questions concerning this letter, ple se contact us.
Sincerely,
Roger D. Walker, Director
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-413/85-33
,
(Safeguards Information)
cc w/ encl:
R. L. Dick, Vice President - Construction
J. W. Hampton, Station Manager
bec w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of South Carolina
RII
RII
RII,
RII
- km
ire
arr
JPShohr
urger
08/J6/85
08d(a/85
g/85
/3/85
08/f /85
RII
RII
RI
0
pd
6
.
ENCLOSURE CONTAINS
HCDance
VBroVnlee
G en ns
sr/q /85
g/k/85
/4 /85
SAFEGUARDS INFORMATION
l
h
A
UPON SEPARATION THIS
SAFEGUARDS INFORMATION
PAGE IS DECONTROLLED. *