Summary of 850827 Meeting W/Cp&L,Besu & Terera at Site Re 10CFR50,App R Exemptions.Request for Addl Info & Attendees List Encl
ML20135B059
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/05/1985
From: Grotenhuis M
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8509100392
Download: ML20135B059 (6)


Text

_

September 5,1985 Docket Nos. 50-325/324 LICENSEE: Carolina Power & Light Company (CP&L)

FACILITY: Crunswick Steam Electric Plant, Units 1 and 2 (BSEP)

SUBJECT:

MEETING AT THE SITE ON AUGUST 27, 1985 REGARDING APPENDIX R

Background:

By letter dated March 8,1981, as supplemented April 15, June 30, September 3 and October 1,1982 and Fay 2,1983, CP8L recuested exerr.ptions of Appendix R to 10 CFR 50. By letter dated July 27, 1983, the NRC summed up the situation by granting some exemptions not related to alternate shutdown capability and denying others. The letter set out the conditions for future actions by CPal which included an alternate shutdown capability assessrent (ASCM ry crt within 9 months. In addition, monthly meetings were held with the staff to assure that the analysis would be expeditious and according to the staff requirements. By letter. dated April 24, 1984 as supplemented December 28, 1984, CP&L submitted the Alternate Shutdown Capability Assessment Report and requested eight exemptions from the technical requirements of Appendix R to 10 CFR 50.

Conference calls were held in August 1984 to ascertain certain information needed to complete the staff review of the ASCA Report. A draft Safety Evaluation (SE) and a draft Request for Additional Information (RAI) were provided to CP&L to clarify the staff need for information. During a conference call on August 14, 1985 it was concluded that a meeting would be necessary to properly define the staff need for information and that it should be held at the site. The draft RAI would serve as the agenda (Enclosure 1) and the meeting was to be held on August 27, 1985. Attendees are listed in Enclosures 2 and 3.

Meeting Summary:

The meeting consisted of discussions to clarify the agenda (i.e., draft RAI). The discussion quickly centered on item 1(c), the table showing separation of function. CP&L determined that a strict interpretation of this request would regtWe an excessive amount of work. After some discussion of'this point, a tour of the facility was held to observe the areas in question. After the tour, a short discussion was held and the meeting recessed for a caucus.

After the caucus, the working group discussed the question further and then convened for a short summary meeting which included CP&L management.

8509100392 BWb24 ADOCK OS000 PDR PDR F

t

The staff position regarding question 1(c) was restated, namely, that, while the addition of the halon system provided added assurance, the lack of knowledge regarding the cable separation distance was making completion of the SE and granting of the related exempt'on difficult, if not impossible. After discussing the relationship of the Appendix A separation distance, CP&L ugreed to review the question as restated, "l(c) Provide a characterization of the separation of functions in fire area DG-1."

Two additional subjects were briefly discussed, the water curtain question (i.e., RAI item 2) and the status of the Control Room floor under Appendix R which was designated as a 3-hour barrier in the Appendix A review. The CP&L resolution to the water curtain question will be presented in its response to the staff RAI when it is formally submitted. The discussion of the control room floor was tabled until the Appendix R review is completed.

As a result of the meeting, the RAI will be formally issued and CP&L will respond in 45 days.

Original signed by/

Marshall Grotenhuis, Project Manager Operating Peactors Branch #2 Division of Licensing

Enclosures:

As stated cc w/ enclosures:

See next page DISTRIBUTION

[DocketFile' s

NRC PDR ~~' '

Local PDR ORBf2 Reading ORB #2 Mtg Summ File DVassallo MGrotenhuis OELD ELJordan BGrimes ACRS(10 NRC P i[ ants DL:0RB# DL:0RB#2 MGrotenhu s:ajs DVassallo 09/,f/85 09/f/85 f

t Mr. E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C. 20036 Mr. Charles R. Dietz Plant Manager Post Office Box 458 Southport, North Carolina 28461 Mr. Franky Thomas, Chairman Board of Comissioners Post Office Box 249 Bolivia, North Carolina 28422 Mrs. Chrys Baggett -

State Clearinghouse Budget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector '.

U. S. Nuclear Regulatory Comission Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Regional Administrator, Region II U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dayne H. Brown, Chief l Radiation Protection Branch Division of Facility Services Department of Human Resources Post Office Box 12200 Raleigh, North Carolina 27605 L

. .- - - .- -. .. . . . . __ - . . - - ~ - . - - --

ENCLO5URE 1 l i

i ,

a REQUEST FOR ADDITIONAL INFORMATION i

APPENDIX R i

j BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 i

The areas of concern and the specific infonnation requests for each are as i follows:

- 1. Separation of redundant functions, the sprinkler system, fire barriers i and plume impingement shields in fire area DG-1.

l j a) Provide photographs of the area.

. b) Provide drawings of the sprinkler system showing sprinkler head

locations and heat collectors.

c) Provide a table showing separation of functions.

i

d) Provide additional information concerning the feasibility study 1

for providing necessary modifications (reference p. 7-14 of the l ASCA Report Volume I).

j e) Provide dimensional sketches showing the location of the plume l j impingement shield and Kaowool wrap.

f) Provide dimensional sketches showing the arrangement of the  ;

rotofoam and your evaluation which justifies its use in a fire barrier. ,

j 2. Provide a sketch showing the arrangement of the water curtains in the reactor building.

i i

i i

i  :

1 l

4 i

i i

' l

. 1 ENCLOSURE 2 1

ATTENDANCE LIST - WORKING GROUP AUGUST 27, 1985 SITE MEETING REGARDING APPENDIX R Name Affiliation M. Grotenhuis NRC

! - R. L. Ferguson NRC S. West NRC

5. D. Floyd NELD j M. R. Oates NELD

~ R. E. Porterfield BSEP 1

K. B. Allison BESU j C. R. Walker BESU L. B. Rothman BESU 3

R. Eberly Terera P. Carier NELD R. Fasnacht BSEP t

i I

i i

l l

I

. O ENCLOSURE 3 4

ATTENDANCE LIST - CUMMARY MEETING AUGUST 27, 1985 SITE MEETIN6 REGARDING APPENDIX R Name Affilation M. Grotenhuis NRC K. B. Allison BESU R. E. Porterfield BSEP L. B. Rothman BESU C. R. Walker BESU R. Eberly Terera S. D. Floyd CP&L S. West NRC R. Ferguson NRC P. W. Howe CP&L R. Groever CP&L L. E. Boyer '

CP&L