Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20196D9751998-11-30030 November 1998 Summary of 981117 Meeting with Util in Rockville,Md Re Proposed Changes to TSs to Provide Longer Allowed Outage Times for Emergency & Balance of Plant Electrical Buses for Plant ML20198L2631998-01-0505 January 1998 Summary of 971202 Meeting W/Util in Rockville,Md Re Changes Proposed by Licensee to TS for BSEP 1 & 2 Allowing Installation of Improvements to CREVS W/Both Plant Units Operating.List of Attendees & Slides Encl ML20217C3021997-09-16016 September 1997 Summary of 970811 Meeting W/Util in Southport,Nc to Discuss Implementation of Endangered Species Act.List of Attendees Encl ML20217H8221997-08-0808 August 1997 Summary of 970801 Meeting W/Util in Rockville,Md to Discuss Scheduling of NRC Reviews of Licensing Actions for Facility. List of Attendees & Activities Planned for Future Encl ML20133E4371996-11-0505 November 1996 Trip Rept of 961016-17 Visit to Southport,Nc to Observe Testing Downcomer Strainer by Brunswick on 961017 ML20059A5881993-10-19019 October 1993 Summary of 930923 Meeting W/Util in Rockville,Md Re Status of Activities Associated W/Crack Indications Observed in Unit 1 Core Shroud.List of Attendees & Slides Presented Encl ML20057E6271993-09-13013 September 1993 Summary of Operating Reactors Events Meeting 93-34 on 930908 ML20057B6321993-09-0909 September 1993 Summary of 930826 Meeting W/Util in Rockville,Md Re Status of Activities Involving Unit 1 Outage Status,Cracks in Core Shrouds & Spray Sparger & Metal Turnings Found in Fuel Assemblies.List of Meeting Attendees & Slides Encl ML20127C3361993-01-11011 January 1993 Summary of 921217 Meeting W/Util Re Possible Concerns W/ Control Bldg Emergency Air Filtration Sys Chlorine Detection Logic.List of Attendees & Viewgraphs Encl ML20127K9071992-08-10010 August 1992 Agenda for 920810 Meeting W/Util to Discuss Status of Nuclear Engineering Dept short-term actions,pre-startup/ post-startup Work Item & Classification & post-startup Backlog Disposition ML20059B7331990-08-23023 August 1990 Summary of Operating Reactors Events Meeting 90-21 on 900822.Reactor Scram Statistics Encl ML20248A6891989-09-13013 September 1989 Summary of 890818 Meeting W/Cp&L in Rockville,Md Re Unit 890617 Loss of Offsite Power Event.List of Attendees,Agenda & Presentation Encl ML20246M8581989-09-0101 September 1989 Trip Rept of 890823-890825 Visit to Plants Re Active Licensing Actions Currently Under Review,Feedback from 890822 Meeting,Pending Type a Ilrt,Potential Amend to Double Allowable Containment Leak Rate & Hydrogen Injection Sys ML20246P1361989-08-31031 August 1989 Summary of 890822 Meeting W/Util in Rockville,Md Re Tech Spec Change Mgt Program for Plant.List of Attendees & Viewgraphs Encl ML20247H5611989-07-12012 July 1989 Summary of 890613 Meeting W/Util & Ncempa in Rockville,Md Re Future Plans for Plant Recirculation Sys Piping Replacement &/Or Repair.List of Attendees & Meeting Agenda Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20246L5121989-03-15015 March 1989 Summary of 890222 Meeting W/Licensee in Bethesda,Md to Discuss Characterization of & Proposed Actions For,Cracks Found in Unit 1 Recirculation Sys Safe Ends.Potential Implications for Unit 2 Also Addressed ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20155E2041988-10-0606 October 1988 Summary of 881004 Meeting W/Util & SAIC in Rockville,Md Re Util Planned Submittal of 10CFR72 License Application for Dry Spent Fuel Storage ML20154D3411988-09-12012 September 1988 Summary of 880714 Meeting W/Licensee in Rockville,Md Re Specifics of Recently Submitted Justification for Continued Operation Concerning Hpci/Rcic Valve Operability & Safety Sys Reliability.List of Attendees,Agenda & Viewgraphs Encl ML20151Q8131988-08-0303 August 1988 Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20236A5211987-10-20020 October 1987 Summary of 870917 Meeting W/Util in Bethesda,Md Re Generic Ltr 87-09, Sections 3.0 & 4.0 of STS on Applicability of Limiting Conditions for Operation & Surveillance Requirements. W/O List of Attendees ML20235L4151987-09-28028 September 1987 Summary of 870721 & 22 Site Meetings W/Licensee & Eg&G Idaho,Inc Re Inservice Testing Program Submittals.Attendance List & Questions & Comments Re Pump & Valve Inservice Testing Program Encl ML20237L1341987-08-12012 August 1987 Summary of 870804 Meeting W/Util in Region II Ofc to Discuss Recent Studies Performed on Reliability of Both RCIC & HPCI Sys ML20237G3791987-08-11011 August 1987 Summary of Operating Reactors Events Meeting 87-23 on 870721.List of Attendees,Viewgraphs & Summary of Reactor Scrams & Significant Events Encl ML20236J7051987-07-29029 July 1987 Summary of 870707 Operating Reactors Events Meeting 87-21 W/ Nrr,Aeod,Res & Regional Ofcs Re Events Occurring Since 870630 Meeting.List of Attendees,Discussion of Events & Summary of Reactor Scrams Also Encl ML20206A9531987-04-0303 April 1987 Summary of 870318 Meeting W/Util Re Hydrogen Recombiner Capability.Util Agreed to Submit Tech Specs for Nitrogen Sys Pressure & Nitrogen Switchover Function by 870327.Generic Ltr 84-09 & NRC 861030 Safety Evaluation Also Discussed ML20210T4031987-01-28028 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 of Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20212J3871987-01-21021 January 1987 Summary of 861103 Meeting W/Util,Westinghouse & O'Donnell & Assoc,Inc Re Possible Use of Pipe Locks to Repair IGSCC at Facility.List of Attendees & Slide Presentation Encl ML20210T3641987-01-16016 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 Re Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214D4001986-11-18018 November 1986 Summary of 861015 Meeting W/Util Re Acceptance Criteria for Fire Barrier Penetrations.Util Described Configuration of Proposed Seals & Seal Matls Used.Further Review by NRC Required.List of Attendees Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20206Q0821986-09-0202 September 1986 Summary of 860716 Meeting W/Util & GE Re Need for mid-cycle IGSCC Insp of Facility.List of Attendees Encl ML20212N6801986-08-27027 August 1986 Summary of Operating Reactor Events Meeting 86-30 on 860825 to Discuss Events Which Occurred Since Last Meeting on 860818 ML20203P6801986-04-22022 April 1986 Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20153H2281986-02-21021 February 1986 Summary of 860116 & 17 Meetings W/Util in Raleigh,Nc & at Site,Respectively,Re Status of Licensing Actions,Including Emergency Response Facilities & Cable Penetrations in Control Room Floor.Attendee Lists Encl ML20153H2501986-02-18018 February 1986 Summary of 860214 Meeting W/Util Re Five Licensing Issues, Including Hydrogen Recombiner Capability,Spds,Integrated Schedule,Excess Flow Check Valve Relief & App J Exemption Request.Attendee Lists Encl ML20205H8791986-01-22022 January 1986 Summary of Operating Reactor Events Meeting 86-02 on 860116 in Bethesda,Md Re Events Since 860106 Meeting.List of Attendees,List of Significant Elements of Events,Assignments & Status of Previous Assignments Encl ML20138M9821985-12-17017 December 1985 Summary of 851204 & 05 Meetings W/Util in Raleigh,Nc & at Plant Site Re Status of Licensing Actions.List of Attendees & Licensing Issues Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20137U5031985-11-22022 November 1985 Summary of 851108 Meeting W/Util Re Util Response to Generic Ltr 84-09 on Hydrogen Recombiner Capability.List of Attendees Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 1999-10-21
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20196D9751998-11-30030 November 1998 Summary of 981117 Meeting with Util in Rockville,Md Re Proposed Changes to TSs to Provide Longer Allowed Outage Times for Emergency & Balance of Plant Electrical Buses for Plant ML20198L2631998-01-0505 January 1998 Summary of 971202 Meeting W/Util in Rockville,Md Re Changes Proposed by Licensee to TS for BSEP 1 & 2 Allowing Installation of Improvements to CREVS W/Both Plant Units Operating.List of Attendees & Slides Encl ML20217C3021997-09-16016 September 1997 Summary of 970811 Meeting W/Util in Southport,Nc to Discuss Implementation of Endangered Species Act.List of Attendees Encl ML20217H8221997-08-0808 August 1997 Summary of 970801 Meeting W/Util in Rockville,Md to Discuss Scheduling of NRC Reviews of Licensing Actions for Facility. List of Attendees & Activities Planned for Future Encl ML20059A5881993-10-19019 October 1993 Summary of 930923 Meeting W/Util in Rockville,Md Re Status of Activities Associated W/Crack Indications Observed in Unit 1 Core Shroud.List of Attendees & Slides Presented Encl ML20057E6271993-09-13013 September 1993 Summary of Operating Reactors Events Meeting 93-34 on 930908 ML20057B6321993-09-0909 September 1993 Summary of 930826 Meeting W/Util in Rockville,Md Re Status of Activities Involving Unit 1 Outage Status,Cracks in Core Shrouds & Spray Sparger & Metal Turnings Found in Fuel Assemblies.List of Meeting Attendees & Slides Encl ML20127C3361993-01-11011 January 1993 Summary of 921217 Meeting W/Util Re Possible Concerns W/ Control Bldg Emergency Air Filtration Sys Chlorine Detection Logic.List of Attendees & Viewgraphs Encl ML20059B7331990-08-23023 August 1990 Summary of Operating Reactors Events Meeting 90-21 on 900822.Reactor Scram Statistics Encl ML20248A6891989-09-13013 September 1989 Summary of 890818 Meeting W/Cp&L in Rockville,Md Re Unit 890617 Loss of Offsite Power Event.List of Attendees,Agenda & Presentation Encl ML20246P1361989-08-31031 August 1989 Summary of 890822 Meeting W/Util in Rockville,Md Re Tech Spec Change Mgt Program for Plant.List of Attendees & Viewgraphs Encl ML20247H5611989-07-12012 July 1989 Summary of 890613 Meeting W/Util & Ncempa in Rockville,Md Re Future Plans for Plant Recirculation Sys Piping Replacement &/Or Repair.List of Attendees & Meeting Agenda Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20246L5121989-03-15015 March 1989 Summary of 890222 Meeting W/Licensee in Bethesda,Md to Discuss Characterization of & Proposed Actions For,Cracks Found in Unit 1 Recirculation Sys Safe Ends.Potential Implications for Unit 2 Also Addressed ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20155E2041988-10-0606 October 1988 Summary of 881004 Meeting W/Util & SAIC in Rockville,Md Re Util Planned Submittal of 10CFR72 License Application for Dry Spent Fuel Storage ML20154D3411988-09-12012 September 1988 Summary of 880714 Meeting W/Licensee in Rockville,Md Re Specifics of Recently Submitted Justification for Continued Operation Concerning Hpci/Rcic Valve Operability & Safety Sys Reliability.List of Attendees,Agenda & Viewgraphs Encl ML20151Q8131988-08-0303 August 1988 Summary of Operating Reactors Events Meeting 88-031 on 880802.Viewgraphs & List of Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20149F4741988-01-0707 January 1988 Summary of Operating Reactors Events Meeting 88-01 on 870105 Re Events That Occurred Since 871222.List of Attendees & Viewgraphs Encl ML20236A5211987-10-20020 October 1987 Summary of 870917 Meeting W/Util in Bethesda,Md Re Generic Ltr 87-09, Sections 3.0 & 4.0 of STS on Applicability of Limiting Conditions for Operation & Surveillance Requirements. W/O List of Attendees ML20235L4151987-09-28028 September 1987 Summary of 870721 & 22 Site Meetings W/Licensee & Eg&G Idaho,Inc Re Inservice Testing Program Submittals.Attendance List & Questions & Comments Re Pump & Valve Inservice Testing Program Encl ML20237L1341987-08-12012 August 1987 Summary of 870804 Meeting W/Util in Region II Ofc to Discuss Recent Studies Performed on Reliability of Both RCIC & HPCI Sys ML20237G3791987-08-11011 August 1987 Summary of Operating Reactors Events Meeting 87-23 on 870721.List of Attendees,Viewgraphs & Summary of Reactor Scrams & Significant Events Encl ML20236J7051987-07-29029 July 1987 Summary of 870707 Operating Reactors Events Meeting 87-21 W/ Nrr,Aeod,Res & Regional Ofcs Re Events Occurring Since 870630 Meeting.List of Attendees,Discussion of Events & Summary of Reactor Scrams Also Encl ML20206A9531987-04-0303 April 1987 Summary of 870318 Meeting W/Util Re Hydrogen Recombiner Capability.Util Agreed to Submit Tech Specs for Nitrogen Sys Pressure & Nitrogen Switchover Function by 870327.Generic Ltr 84-09 & NRC 861030 Safety Evaluation Also Discussed ML20210T4031987-01-28028 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 of Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20212J3871987-01-21021 January 1987 Summary of 861103 Meeting W/Util,Westinghouse & O'Donnell & Assoc,Inc Re Possible Use of Pipe Locks to Repair IGSCC at Facility.List of Attendees & Slide Presentation Encl ML20210T3641987-01-16016 January 1987 Summary of Operating Reactors Events Meeting 87-02 on 870112 Re Events Which Occurred Since 870105.List of Attendees,Events Discussed & Summary of Events Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214D4001986-11-18018 November 1986 Summary of 861015 Meeting W/Util Re Acceptance Criteria for Fire Barrier Penetrations.Util Described Configuration of Proposed Seals & Seal Matls Used.Further Review by NRC Required.List of Attendees Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20206Q0821986-09-0202 September 1986 Summary of 860716 Meeting W/Util & GE Re Need for mid-cycle IGSCC Insp of Facility.List of Attendees Encl ML20212N6801986-08-27027 August 1986 Summary of Operating Reactor Events Meeting 86-30 on 860825 to Discuss Events Which Occurred Since Last Meeting on 860818 ML20203P6801986-04-22022 April 1986 Summary of 860410 Meeting W/Project Managers & Utils in Bethesda,Md Re Automated Tracking,Integrated Schedules & Tech Specs.Attendees List,Viewgraphs & Meeting Agenda Encl ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20153H2281986-02-21021 February 1986 Summary of 860116 & 17 Meetings W/Util in Raleigh,Nc & at Site,Respectively,Re Status of Licensing Actions,Including Emergency Response Facilities & Cable Penetrations in Control Room Floor.Attendee Lists Encl ML20153H2501986-02-18018 February 1986 Summary of 860214 Meeting W/Util Re Five Licensing Issues, Including Hydrogen Recombiner Capability,Spds,Integrated Schedule,Excess Flow Check Valve Relief & App J Exemption Request.Attendee Lists Encl ML20205H8791986-01-22022 January 1986 Summary of Operating Reactor Events Meeting 86-02 on 860116 in Bethesda,Md Re Events Since 860106 Meeting.List of Attendees,List of Significant Elements of Events,Assignments & Status of Previous Assignments Encl ML20138M9821985-12-17017 December 1985 Summary of 851204 & 05 Meetings W/Util in Raleigh,Nc & at Plant Site Re Status of Licensing Actions.List of Attendees & Licensing Issues Encl ML20137X5091985-11-29029 November 1985 Summary of Operator Reactor Events Meeting 85-24 on 851125 Re Briefing of Ofc Directors & Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851118.List of Attendees Encl ML20137U5031985-11-22022 November 1985 Summary of 851108 Meeting W/Util Re Util Response to Generic Ltr 84-09 on Hydrogen Recombiner Capability.List of Attendees Encl ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20205C4111985-09-16016 September 1985 Summary of 850910 Meeting W/Util Re Util 841210 Request to Amend Dc Sys.Attendance List Encl ML20135B0591985-09-0505 September 1985 Summary of 850827 Meeting W/Cp&L,Besu & Terera at Site Re 10CFR50,App R Exemptions.Request for Addl Info & Attendees List Encl ML20127H3411985-06-19019 June 1985 Summary of Meeting W/Util to Discuss Extension of Time to Complete Environ Qualification.Attendance List Encl 1999-10-21
[Table view] |
Text
_
September 5,1985 Docket Nos. 50-325/324 LICENSEE: Carolina Power & Light Company (CP&L)
FACILITY: Crunswick Steam Electric Plant, Units 1 and 2 (BSEP)
SUBJECT:
MEETING AT THE SITE ON AUGUST 27, 1985 REGARDING APPENDIX R
Background:
By letter dated March 8,1981, as supplemented April 15, June 30, September 3 and October 1,1982 and Fay 2,1983, CP8L recuested exerr.ptions of Appendix R to 10 CFR 50. By letter dated July 27, 1983, the NRC summed up the situation by granting some exemptions not related to alternate shutdown capability and denying others. The letter set out the conditions for future actions by CPal which included an alternate shutdown capability assessrent (ASCM ry crt within 9 months. In addition, monthly meetings were held with the staff to assure that the analysis would be expeditious and according to the staff requirements. By letter. dated April 24, 1984 as supplemented December 28, 1984, CP&L submitted the Alternate Shutdown Capability Assessment Report and requested eight exemptions from the technical requirements of Appendix R to 10 CFR 50.
Conference calls were held in August 1984 to ascertain certain information needed to complete the staff review of the ASCA Report. A draft Safety Evaluation (SE) and a draft Request for Additional Information (RAI) were provided to CP&L to clarify the staff need for information. During a conference call on August 14, 1985 it was concluded that a meeting would be necessary to properly define the staff need for information and that it should be held at the site. The draft RAI would serve as the agenda (Enclosure 1) and the meeting was to be held on August 27, 1985. Attendees are listed in Enclosures 2 and 3.
Meeting Summary:
The meeting consisted of discussions to clarify the agenda (i.e., draft RAI). The discussion quickly centered on item 1(c), the table showing separation of function. CP&L determined that a strict interpretation of this request would regtWe an excessive amount of work. After some discussion of'this point, a tour of the facility was held to observe the areas in question. After the tour, a short discussion was held and the meeting recessed for a caucus.
After the caucus, the working group discussed the question further and then convened for a short summary meeting which included CP&L management.
8509100392 BWb24 ADOCK OS000 PDR PDR F
t
The staff position regarding question 1(c) was restated, namely, that, while the addition of the halon system provided added assurance, the lack of knowledge regarding the cable separation distance was making completion of the SE and granting of the related exempt'on difficult, if not impossible. After discussing the relationship of the Appendix A separation distance, CP&L ugreed to review the question as restated, "l(c) Provide a characterization of the separation of functions in fire area DG-1."
Two additional subjects were briefly discussed, the water curtain question (i.e., RAI item 2) and the status of the Control Room floor under Appendix R which was designated as a 3-hour barrier in the Appendix A review. The CP&L resolution to the water curtain question will be presented in its response to the staff RAI when it is formally submitted. The discussion of the control room floor was tabled until the Appendix R review is completed.
As a result of the meeting, the RAI will be formally issued and CP&L will respond in 45 days.
Original signed by/
Marshall Grotenhuis, Project Manager Operating Peactors Branch #2 Division of Licensing
Enclosures:
As stated cc w/ enclosures:
See next page DISTRIBUTION
[DocketFile' s
NRC PDR ~~' '
Local PDR ORBf2 Reading ORB #2 Mtg Summ File DVassallo MGrotenhuis OELD ELJordan BGrimes ACRS(10 NRC P i[ ants DL:0RB# DL:0RB#2 MGrotenhu s:ajs DVassallo 09/,f/85 09/f/85 f
t Mr. E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:
Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C. 20036 Mr. Charles R. Dietz Plant Manager Post Office Box 458 Southport, North Carolina 28461 Mr. Franky Thomas, Chairman Board of Comissioners Post Office Box 249 Bolivia, North Carolina 28422 Mrs. Chrys Baggett -
State Clearinghouse Budget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector '.
U. S. Nuclear Regulatory Comission Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Regional Administrator, Region II U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dayne H. Brown, Chief l Radiation Protection Branch Division of Facility Services Department of Human Resources Post Office Box 12200 Raleigh, North Carolina 27605 L
. .- - - .- -. .. . . . . __ - . . - - ~ - . - - --
ENCLO5URE 1 l i
i ,
a REQUEST FOR ADDITIONAL INFORMATION i
APPENDIX R i
j BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 i
The areas of concern and the specific infonnation requests for each are as i follows:
- - 1. Separation of redundant functions, the sprinkler system, fire barriers i and plume impingement shields in fire area DG-1.
l j a) Provide photographs of the area.
. b) Provide drawings of the sprinkler system showing sprinkler head
- locations and heat collectors.
c) Provide a table showing separation of functions.
i
- d) Provide additional information concerning the feasibility study 1
for providing necessary modifications (reference p. 7-14 of the l ASCA Report Volume I).
j e) Provide dimensional sketches showing the location of the plume l j impingement shield and Kaowool wrap.
f) Provide dimensional sketches showing the arrangement of the ;
rotofoam and your evaluation which justifies its use in a fire barrier. ,
j 2. Provide a sketch showing the arrangement of the water curtains in the reactor building.
i i
i i
i :
1 l
4 i
i i
' l
. 1 ENCLOSURE 2 1
ATTENDANCE LIST - WORKING GROUP AUGUST 27, 1985 SITE MEETING REGARDING APPENDIX R Name Affiliation M. Grotenhuis NRC
! - R. L. Ferguson NRC S. West NRC
- 5. D. Floyd NELD j M. R. Oates NELD
~ R. E. Porterfield BSEP 1
- K. B. Allison BESU j C. R. Walker BESU L. B. Rothman BESU 3
R. Eberly Terera P. Carier NELD R. Fasnacht BSEP t
i I
i i
l l
I
. O ENCLOSURE 3 4
ATTENDANCE LIST - CUMMARY MEETING AUGUST 27, 1985 SITE MEETIN6 REGARDING APPENDIX R Name Affilation M. Grotenhuis NRC K. B. Allison BESU R. E. Porterfield BSEP L. B. Rothman BESU C. R. Walker BESU R. Eberly Terera S. D. Floyd CP&L S. West NRC R. Ferguson NRC P. W. Howe CP&L R. Groever CP&L L. E. Boyer '
CP&L
, H. R. Banks CP&L H. C. Brinkmann CP&L A. B. Cutter CP&L L. V. Wagoner CP&L C. H. Moseley, Jr. CP&L L. E. Jones CP&L T. L. Brown CP&L S. D. Smith CP&L R. Fasnacht CP&L K. E. Snyor CP&L C. R. Dietz CP&L S. R. Zimmerman CP&L
.- -.