MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology1998-12-11011 December 1998 Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology ML20198C2501998-12-11011 December 1998 Forwards Rev 45 to Zion Nuclear Power Station Security Plan, Per Requirements of 10CFR50.4(b)(4).Rev Includes Listed Changes.Licensee Has Concluded That Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed A98051, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology A98055, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 A98059, Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error1998-11-11011 November 1998 Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,1998-11-10010 November 1998 Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20198C7401998-10-21021 October 1998 Informs That Encl Correspondence Was Received from Constituent,C Paxton Re Request for Investigation as to Documentation Also Encl.Without Encl ML20154J4951998-10-0707 October 1998 Forwards Revised Security Plans for CE Listed Nuclear Power Stations,Per 10CFR50.4(b)(4).Changes Do Not Decrease Effectiveness of Station Security Plans.Encl Withheld A98050, Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal1998-10-0505 October 1998 Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal ML20151Y5101998-09-11011 September 1998 Provides Results of drive-in-drill Conducted on 980804 & Augmentation Phone Drills Conducted Between 980601 & 0831 ML20238F7571998-08-28028 August 1998 Forwards fitness-for-duty Program Performance Data for Each of Util Nuclear Power Stations for Six Month Period Ending 980630 A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV1998-08-28028 August 1998 Forwards Revised Scope of One Commitment Contained in Response to NOV ML20153F6811998-08-26026 August 1998 Informs of E Dienethal & R Robarge Concerns Re Safety of Areas in & Around City of Zion ML20237D9281998-08-24024 August 1998 Provides Description of Approach Being Taken by Comed to Develop Dsar.New Safety Classification Will Be Developed for Equipment Determined to Be Important to Defueled Condition 1999-09-30
[Table view] |
Text
Commowicahh I:dison Company
- Zion Gcncrating $tation 5* 101 $hdoh Ikmlevard tion,n.un w n
. Tel H C-762OH1 November 25,1996 .
I U. S. Nuclear Regulatory Commission Washington, D.C. 20555 )
Attention: Document Control Desk
Subject:
Commonwealth Edison (Comed) Response to Notice of Violation; Zion Nuclear Power Station Units I and 2; .i NRC Inspection Report 50-295/304-96010 I NRC Docket Numbers 50-295 and 50-304
Reference:
- 1. J. L. Caldwell letter to J. H. Mueller dated October 22,1996 (NRC Inspection Report 50-295/304-96010) !
)
- 2. J.H. Mueller letter to USNRC dated September 27,1996 (Response to I NRC Inspection Report 50-295/304-96007) )
i Attached is the Comed response to the Notice of Violation (NOV) transmitted by the Reference 1 letter and discussed in the subject inspection report. The NOV cited four severity level IV ;
violations, with one violation containing two examples. One of the violations concerned the i second occurrence of overflowing the OB lake discharge tank, which Comed responded to in the Reference 2 letter. Therefore, this violation will not be addressed in the attachnient to this letter as noted in Reference 1. Also, an extension to November 25,1996, for this response was obtained in a phone call between Mr. Dapas of Region III and Mr. Farrar of the Zion Staff.
The violations discussed in the subject inspection report indicate concerns with tue adequacy of procedures, procedure adherence, and timely and effective corrective actions. We agree with your conclusion that improvements are needed in these areas, and we are committed to taking ;
action to correct them. '
Strategy Three of the Zion Operations Performance Improvement Plan: " Plant Procedures" ;
addresses the issue of procedure adequacy and adherence. In this Action Plan, we will improve l I
the ability of the workers to use plant procedures by improving the quality of our procedures, and we will improve our adherence to them.
i s !
l 9612040022 961125 PDR ADOCK 05000295 G PDR t
\
A Unicom Compan)
To address the issue of timely corrective actions, a Zion Corrective Action Improvement Plan has also been established. Strategy 1 of this Plan is designed to strengthen department head ownership of the corrective actions process. The process is being streamlined to ensure timely review of significant events and timely implementation of corrective actions. Problem Identification Forms (PIFs) are now reviewed daily by senior management and significant events are assigned for evaluation and prompt correction by line management.
Con ective actions to address the specific violations are discussed in the attachment to this letter.
If you have any questions or require additional information, please contact Mr. Dennis Farrar, Regulatory Assurance Manager, at (847) 746-2084, extension 3353.
Sincerely,
)
VU, J. H. Mueller Site Vice President Zion Station l
l Attachment A: Summary of Commitments i Attachment B: Response to the Notice of Violations cc: A. Bill Beach, Regional Administrator, Region III l C. Y. Shiraki, Zion Project Manager, NRR l Acting Senior Resident Inspector, Zion Station Office of Nuclear Facility Safety - IDNS l l
ATTACHMENT A
- Summary of Commitments identified in this Violation Response:
- 1) Actions required in Technical Specifications for inoperable radiation monitors have been reviewed to verify that the procedural action requirements in ZRP 5820-12 are in agreement with those listed in the Technical Specifications. As a result of this review, minor discrepancies were found in ZRP 5820-12. The necessary procedure. changes to ZRP 5820-12 required to correct these discrepancies will be completed by November 27, 1996.
- 2) Based on lessons learned from this event, all fuel handling surveillances and instructions were reviewed. One involving receipt ofnew control rods was ' determined to be deficient -
and will be revised by December 31,1996 prior to use.
- 3) Three fuel handling instructions were identified as ones which could be enhanced.
These enhancements will be complete by January 10,1997.
~
- ATTACHMENTB Notice of Violation Response VIOLATION: 50-295/304-96010-03,50-295/304-96010-09 During an NRC inspection conducted on July 13 through August 29,1996, a violation of NRC l requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
10 CFR Part 50, Appendix B, Criterion V, " Instructions, Procedures and Drawings," !
requires that activities afTecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
i Procedure ZRP 5820-12, "Out of Service Surveillance for Radiation Monitors," Revision j 4, requires implementation of Technical Specification action statements for inoperable radiation monitors.
Technical Specification, Table 3.14, " Radiation, Monitoring Instrumentation," requires that with radiation monitor 2R-AR03 inoperable, an alternate method of monitoring containment be initiated within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Procedure, FHI-02, " Handling of Shipping Containers and Site Removal of New Fuel Assemblies From Shipping Containers and Inspection of New Fuel," Revision 2, Step 9, requires that the fuel handling crew slowly lift one end of the shipping container for new j fuel assemblies being moved with the overhead crane using a minimum rated two ton nylon sling, until the lateral lock tubes slide into their support housing.
Contrary to the above,
- a. On July 26,1996, ZRP 5820-12 was not appropriate to the circumstances, in that it stated that an alternate method of monitoring containment within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with radiation monitor 2R-ARO3 inoperable was not required, when an alternate method was required by TS Table 3.14.
- b. On July 30,1996, FHI-02, Step 9, was not appropriate to the circumstances, in that it did not specify how to properly rig the shipping container for the lift.
Consequently, personnel inadvertently dropped a shipping container with two new fuel assemblies, during new fuel assembly receipt inspection.
This is a Severity Level IV Violation (Supplement IV).
ATTACHMENT B Notice of Violation Response REASONS FOR THE VIOLATION Comed acknowledges the violation. The reason for the violation was inadequate procedures and practices concerning LCO management.
- a. Technical Specifications, Table 3.14 requires that an alternate method of monitoring containment be established within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of radiation monitor 2R-ARO3 becoming inoperable. However, due to inadequate review and oversight, Procedure ZRP 5820-12 "Out-of-Service Surveillance for Radiation Monitor" incorrectly specified that no action was required.
- b. The Fuel handlers rigged the assemblies based on past experience due to the absence of adequate procedural guidance. Procedure FHI-02,
" Handling of Shipping Containers and Site Removal of New Fuel Assemblies from Shipping Containers and Inspection of New Fuel",
did not provide guidance relative to attaching shackles for positive engagement of the sling.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND RESULTS ACHIEVED
- a. Procedure ZRP 5820-12 has been revised to include the required action that an alternate method of monitoring the appropriate parameters be established within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of a containment range area monitor becoming inoperable. This revision also lists the alternative methods which may be used in preferential order.
The Operations performance plan includes actions to heighten Operations Standards towards their control of Technical Specification actions regarding Limiting Condition for Operations (LCO). Implementation of the plan results in the Operations Department taking clear control and ownership of the LCO management process.
ATTACHMENTH Notice of Violation Response
$ b. The effected fuel assemblies were inspected and no visible damage was noted. Accelerometers were checked and none were found in the tripped condition. Westinghouse was contacted and it was verified that there were
. no adverse effects to the fuel.
. Subsequently, FHI-02 was revised to require fuel handlers to attach the
- sling to the pillow blocks on the bottom of the support frame with rated ,
shackles or hooks. To further reinforce knowledge of this event, the circumstances surrounding it were discussed with the Fuel Handling ;
- Department in a tailgate session.
Additionally, this event was discussed during a " Station Safety Stand-Down" held on August 1 and 2,1996. At this time, station management re-emphasized the expectation that all work should be completed; safely, per procedure, and if a governing procedure is found to be inadequate the work should be immediately suspended until the procedural inadequacy is corrected.
CORRECTIVE STEPS TIIAT W!LL BE TAKEN TO AVOID FURTIIER VIOLATIONS Actions required in Technical Specifications for inoperable radiation monitors have been
, reviewed to verify that the procedural action requirements in ZRP 5820-12 are in agreement with those listed in the Technical Specifications. As a result of this review, minor discrepancies were found in ZRP 5820-12. The necessary procedure changes to ZRP 5820-12 required to correct these discrepancies will be completed by November 27,1996.
Based on lessons learned from this event, all fuel handling surveillances and instructions were reviewed. One involving receipt of new control rods was determined to be deficient and will be
- revised by December 31,1996 prior to use.
Three other fuel handling instructions were identified as ones which could be enhanced. These enhancements will be complete by January 10,1997.
DATE WHEN FULL COMPLIANCE WILL BE ACIIIEVED Zion Station is currently in full compliance
- - i l
ATTACHMENT B i
Notice of Violation Response l VIOLATION: 50-295-96010-05 i
During an NRC inspection conducted on July 13 through August 29,1996, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure i for NRC Enforcement Actions," NUREG-1600, the violation is listed below: j i
10 CFR Part 50, Appendix B, Criterion XVI, " Corrective Action," states that measures ;
shall be established to assure that conditions adverse to quality, such as failures, ,
malfunctions, deficiencies, deviations, defective material and equipment, and
]
nonconformances are promptly identified and corrected. l Contrary to the above, inadequate corrective actions were taken after the licensee identified a scaffold interference with the Unit I turbine stop valves on June 17,1996. As a result, on August 5,1996, the inspectors identified that a scaffold around the IB containment spray pump obstructed operation of the 1B containment spray discharge valve.
This is a Severity Level IV Violation (Stpplement IV).
1 REASONS FOR THE VIOLATION l Comed acknowledges the violation. The reason for the violation was untimely implementation l of corrective actions. The corrective actions identified for the June 17,1996 scaffold problem included walk downs of existing scaffolding and the revision of procedure ZAP 920-01 "Use of scaffolding and Ladders" to clearly delineate accountability for erecting scaffolding and to clarify i the requirement that Operations inspect installed scaffolding for operational interference. These corrective actions had not been fully implemented prior to the August 5,1996 event. ;
i CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND RESULTS ACHIEVED As a result of the August 5,1996 event, all scaffolding work was stopped while scaffolds were inspected and procedure changes were made and put in place before work resumed.
j
,s -+
1 ATTACHMENTH j Notice of Violation Response i
I To further reinforce the knowledge of contractors responsible for scaffold construction, management reiterated the expectation that scaffolding be erected such that it in no way interferes with plant equipment. To improve worker awareness, the mechanical contractor added guidance regarding building scaffolding without impacting the operation of plant equipment to l the carpenters' training. l s
Maintenance Engineering revised ZAP 920-01 "Use of scaffolding and Ladders" to clearly . l delineate accountability for erecting scaffolding and to require that an Operations representative ;
inspect installed scaffolding for any operational interference. .{
To address the issue of timely corrective actions, a corrective action improvement plan has been established. Strategy I of the plan is to strengthen department head ownership in the corrective actions process. As a result,' this process is being streamlined to ensure timely review of significant events and timely implementation of corrective actions. All Problem Identification i Forms (PIFs) are now reviewed daily by senior management and those involving significant events are assigned for evaluation and correction by line management.
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED ;
Zion Station is currently in full compliance l
5-4
( ,
ATTACllMENT H i
Notice of Violation Response VIOLATION: 50-295/304-90010-06 I
'1 During an NRC inspection conducted on July 13 through August 29,1996, a violations of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below: '
10 CFR Part 50, Appendix B, Criterion XVII, " Quality Assurance Records," requires in ,
part that sufficient records shall be maintained to furnish evidence of activities affectmg a quality and that the records shall record the type of observation, the results, the j acceptability, and the action taken in connection with any deficiencies noted.
)
1 Contrary to the above, on August 16, inspectors identified that a missing part and an inadequately secured part had not been documented in the as-found condition pc,rtion of
- the work package for the IB CCP shaft driven oil pump.
REASONS FOR Tile VIOLATION l
Comed acknowledges the violation. The reason for the violation was failure to follow procedures. The mechanic was aware of the missing plate on the 1B charging pump, but failed to ;
accurately and completely document the as-found condition of the component as required by procedure. )
l l
CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND RESULTS ACHIEVED i
The Mechanical Maintenance Supervisor counseled the mechanic and he now understands the expectation that as-found conditions be recorded accurately and in appropriate detail and that i maintenance history documentation be maintained. j The 1B Charging pump shaft driven lube oil pump (IVC 007) missing cover plate was identified ]
when the pump experienced degraded flow and caused the IB charging pump auxiliary tube oil pump to cycle on and off. Immediate actions were taken to ensure that this problem did not exist on similar Emergency Core Cooling Pumps:
- 1) The maintenance history was reviewed for the 1A Charging pump shaft driven lube oil pump (1VC006), previously disassembled and reassembled in July 1995.
The pressure of the pump was found within the design required limits by the system engineer.
i
I ATTACHMENT B l
Notice of Violation Response i
- 2) The maintenance history was reviewed for the 2A/2B Charging pump shaft driven lube oil pumps (2VC006/2VC007), and no previous disassembly and reassembly ,
tasks were found. l
- 3) The maintenance history was reviewed for the AFW and SI pump shaft driven tube oil pumps. These shaft driven lube oil pumps do not have a gear pump cover {
retaining plate. !
To further emphasize the significance of this event, the Mechanical Maintenance Department included lessons learned from this event in Pre-job briefs. Mechanics and Mechanical l Maintenance Supervisors received briefing on the expectation that they ensure the accuracy and ;
completeness of work package documentation.
i DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED ;
Zion Station is currently in full compliance.