ML20134P951

From kanterella
Jump to navigation Jump to search
Forwards Amend 67 to License DPR-61 & Safety Evaluation. Amend Changes Tech Specs Re Discharge Pressure Requirements for ECCS Periodic Flow Testing to Reflect True Pump Performance W/Allowance for Pump Degradation
ML20134P951
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/03/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20134P953 List:
References
LSO5-85-09-004, LSO5-85-9-4, NUDOCS 8509090108
Download: ML20134P951 (2)


Text

'l September 3, 1985 l

Docket No. 50-213 DISTRIBUTION l LS05-85-09-004 Docket File OELD NRC PDR ELJordan Mr. Jchn F. Opeka, Senior Vice President Local PDR BGrimes Nuclear Engineering and Operations OPB #5 Reading JPartlow Connecticut Yankee Atomic Power Company NSIC ACRS (10)

Post Office Box 270 HThompson RDiggs (w/TACS)

Hartford, Connecticut 06141-0270 JZwolinski TParnhart(4)

FAkstulewicz LJHarnon

Dear Mr. Opeka:

CJamerson MVirgilio OELD WJones

SUBJECT:

CMiles, OPA CGrimes VJensen AWang Re: Haddam Neck Plant The Commission has issued the enclosed Amendment No. 67 to Facility Operating License No. DPR-61 for the Haddan Neck Plant. This amendment is in response to your application dated May 31, 1984.

This amendnent modifies the Technical Specifications to change the discharge pressure requirements for ECCS periodic firy testing to reflect true pump performance with allowance for FCCS pump degradation due to normal wear.

A Notice of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Deternination and Opportunity for Hearing related to the requested action was published in the Federal Register on July 12, 1984 (49 FR 28484). No ccrrents or requests for hearing were received.

A copy of our related Safety Evaluation is enclosed. This action will appear in the Conmission's biweekly notice publication in the _ Federal Renister.

Sincerely, Original 31gned by:

John A. Zwolinski, Chief Operating Reactors Branch f5 Division of Licensing

Enclosures:

1. Amendrent No.67 to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next page DL:-ORB # DL: ORB #5h4 0 D DL: ORB #5 DL >

CJamerson 4 FAkstulewicz:Jb JZwolinski CDDCrutch eld t

$ /ly /85 8/l9/85 7/s.i/85  %/4/85 6 /p85 [s ,p L.

U

$MM P

5 oA l

I

if o

~~

Mr. John F. Opeka .

, Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

, Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superirtendent Haddam Neck Plant RDF #1 Post Office Box 127E East Hampton, Connecticut 06424 l

Edward J. Mroczka -

Vice President, Nuclear Operations Northeast Utilities Service Cerpeny Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street

Hartford, Connecticut 06106 Resident Inspector Haddan Neck Nuclear Power Station c/o U.S. NRC East Faddam Post Office East Haddam, Connecticut 06423 Regional Adninistrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 k.