ML20134P953

From kanterella
Jump to navigation Jump to search
Forwards Amend 67 to License DPR-61 & Safety Evaluation. Amend Changes Tech Specs Re Discharge Pressure Requirements for ECCS Periodic Flow Testing to Reflect True Pump Performance W/Allowance for Pump Degradation
Date released: 05/27/2020 Download: ML20134P953


Safety Evaluation Supporting Amend 67 to License DPR-61
ML20134P968
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/03/1985
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML20134P968 (2)
Amend 67 to License DPR-61,changing Tech Specs Re Discharge Pressure Requirements for ECCS Periodic Flow Testing to Reflect True Pump Performance W/Allowance for Pump Degradation Due to Normal Wear
ML20134P963
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/03/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
References
Download: ML20134P963 (4)
Forwards Amend 67 to License DPR-61 & Safety Evaluation. Amend Changes Tech Specs Re Discharge Pressure Requirements for ECCS Periodic Flow Testing to Reflect True Pump Performance W/Allowance for Pump Degradation
ML20134P951
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/03/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: OPEKA J F
CONNECTICUT YANKEE ATOMIC POWER CO.
References
Download: ML20134P951 (2)