ML20134P003
| ML20134P003 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/29/1985 |
| From: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 CAL-85-13, NUDOCS 8509060103 | |
| Download: ML20134P003 (3) | |
See also: IR 05000317/1985026
Text
-
e
s
AUG 2 91985
i
Docket Nos. 50-317
50-318
-
CAL 85-13
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject: Combined Inspection Nos. 50-317/85-16; 50-318/85-14
This letter confirms your commitments made during a telephone conference
held on August 23, 1985, between Mr. J. Tiernan, Manager, Nuclear Power,
and other members of your staff and Messrs. T. Martin, W. Kane, and
other members of my staff. The issues addressed were discussed during a
recent Enforcement Conference held in the Region'I office on August 14,
1985 concerning your implementation of certain NUREG-0737 items.
These
issues involved technical, administrative and managerial problems which
led to the deterioration of post-accident sampling, analyses and
measurements . capabilities of reactor coolant, reactor containment .and
effluent parameters.
With regard to the matters discussed, it is our understanding that the
following actions have been or will be taken by September 20, 1985.
A.
Verify ' operability of the Combustion Engineering Post-Accident
Sampling System (CE-PASS) grab sampling capability.
Operability.
will be demonstrated by drawing samples from the reactor coolant
system
and
demonstrating
analytical
accuracy -required
by
NUREG-0737. Any concerns with analytical accuracy will be resolved
-with the NRC staff.
B.
Establish a procedure for periodic surveillance of the capability
to dilute CE-PASS grab samples to ensure accurate assessment of
chemical / isotope concentrations within tolerances specified in
-NUREG-0737.
C.
Establish an action plan and schedule for implementing, (1) a
permanent
post-accident
sampling
capability
which
satisfies
analytical
requirements
and
(ii)
a
post-accident
radiciodine and particulate effluent monitoring capability that
provides' representative measurements of the effluent stream from
each reactor unit vent stack.
,
M
Q7
%
$
,
_
OFFICIAL RECORD COPY
\\)
s
-
,Baltinore Cas and Electric Company
2
,
Such action plan shall include:
1.
Designation of an individual assigned the responsibility of
planning, organizing, directing and controlling implementa-
tion.
2.
Establishment and implementation of detailed pre-operational
test
procedures
for
verifying
and
valida~ ting
system
performance and capability, including:
a.
instrument calibration and accuracy,
b.
representative sampling,
c.
operability of all system components,
d.
practicability of associated operating, and emergency
procedures.
>
3.
Establishment and implementation of
a.
periodic
surveillance
testing
procedures
to _ assure
continued operability, and
b.
a program to assure that sufficient numbers of personnel-
are trained and remain competent in the ability to
operate the systems, analyze samples and evaluate.results.
D.
Establish an administrative procedure for auditing compliance with
new Technical Specification requirements, including: preparation of
procedures,
training
of
personnel ,
successful
completion
of
necessary preoperational testing, and establishment of required
surveillance testing program, within one month of the required
implementation of the actions.
E.
Review and revise, as necessary, the procedures for prioritizing
all maintenance activities to assure that systems required to
be operable are expeditiously returned to operable status.
These
procedures shall include procedures for systems covered either by
license condition or licensee commitment.
Senior Baltimore Gas &
Electric Plant Management shall be kept aware of the status of
these systems.
If your understanding of these commitments does not agree with ours,
please inform this office within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of-this letter.
The implementation of these actions' will be reviewed in a subsequent
inspection of your program.
Sincerely,
-
Original Signed By:
Thomas E. Murley
Regional Administrator
-
- /
0FFICIAL RECORD COPY
V
. ,; :
~
.,
-_-
.
"-
'
Baltimore Gas and Electric Company
3
cc:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
Thomas Masette, Administrator, Nuclear Evaluations
.
R. C. L. Olson, Principal Engineer
J. A. Tiernan,-Manager, Nuclear Power'-
- R. E. Denton, General Supervisor, Training and Technical Services
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
j
NRC Resident Inspector
State of Maryland (2)
-
b'cc:
i
. Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
DRP Section Chief
M. McBride, RI, Pilgrim
J. Allan, RI
J. Gutierrez, RI
C.'Poitier, RI
?
- . .
h
F
S
t :
S
I RSS
R
.<
S
baky
el amy
[ Martin
.a ostecki
We zinger
8
/ 85
8
/85
8/;f/85
8/2S/85
8g/85
'
,
RI:DRA
RI .M
'
Allan
Murl y
8/ / 85
8/
85
o
0FFICIAL RECORD COPY
.
,
, , , . -