Forwards Lists of Applications for Tech Spec Changes for Review as Part of Upgrade Program & Applications Intended to Be Reviewed Separately.Applications Not Completely Acceptable Will Require Mods.Review of Encls Requested
ML20134N727
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/28/1985
From: Wagner P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Holmes M
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8509050310
Download: ML20134N727 (5)


Text

.

AUG 281985 Docket:

50-267-Public Service Company of Colorado ATTN:

M. Holmes, Licensing Manager P. O. Box 840 Denver, Colorado 80201-0840 Gentlemen:

As we discussed during the meeting on Technical Specifications (TSs) at the Fort St. Vrain Station on July 26, 1985, and during the telephone conference on August 13, 1985, it is our intention to include the review and approval of some of the applications for proposed changes to the TSs as part of the Upgrade Program. Attached as Enclosures 1 and 2 are the lists of applications which we inter.d to review'as part of the Upgrade Program and those we intend to review separately.

It is our present opinion that the applications included in Enclosure 1 are not completely acceptable and would require soine modification; the comparable requirements in the Upgrade Program draft, however, appear to be'more acceptable.

Therefore, it appears that a more efficient use of your and our resources can be achieved by incorporating certain reviews into the Upgrade. Program.

I would appreciate your review of the roclosures to ensure the accuracy and completeness of the pending applicatiohs.and any comments you may have on our approach.

l Sincerely, f

h)

O (A) p Philip C. Wagner Senior Project Manager

Enclosures:

As stated cc:

Mr. D. W. Warembourg, Manager Nuclear Engineering Division Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 i

RSB/ES ES RSB PCWagner:gb RElreland DRHunter i/)N85 4/L6 /85 6 //g85

'r 5 P 2888! S E 67

\\ \\

l e

r=

w

. Mr. David'Alberstein, 14/159A GA Technologies, Inc.

P. O. Box 85608 San Diego, California 92138 Kelley, Stansfield.& 0'Donnell Public Service Company Building 550 15th Street, Room 900 Denver, Colorado 80202 Chairman, Board of County Comm.

of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs-Environmental Protection Agency 1860 Lincoln Street Denver, Colorado 80203 Mr. H. L. Brey, Manager Nuclear Licensing / Fuels Div.

Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 J. W. Gahm, Manager, Nuclear Production Division l

Fort St. Vrain Nuclear Station 16805 WCR 19) i Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (sameaddress)

Colorado Radiation Control Prr. gram Director bec distrib. by RIV:.

R. D. Martin, RA RPB Resident Ir.spector RSB Section Chief, RSB/ES EP&RPB P. Wagner, RSB/ES R. Denise, DRSP E. Haycraft DRSP/LA RIV Official Reading File E. Butcher, ORB 3 CPB/NRR D. Eisenhut, D/DL G. Lainas, DL K. Heitner, ORB 3 J. Taylor, IE E. Jordan, IE T. King. ARG/NRR G. L. Plumlee, TSRG/NRR i

ACTIONS TO BE INCLUDED IN THE TECHNICAL SPECIFICATION UPGRADE PROGRAM 1.

Electrical Technical Specifications (TAC 51955)

~

The original application (P-83415) dated 12/30/83, which was submitted in response to Safety Evaluations dated 8/17/82 and 10/12/82 related to degraded grid and onsite power systems undervoltage protection, was superseded by a rewrite of the electrical systems section of the TSs in response to a 10/12/83 enforcement conference commitment. The 6/26/84 (P-84187) reapplication did not contain all of the requested upgrades and was further revised by a 2/6/85 (P-85041) application.

(This application also responds to Generic Letter 84-15 (TAC 55861) for diesel generator reliability.)

Since the latest submittal is not completely acceptable and since recent NRC positions of diesel generator testing appear to be more acceptable to PSC, the needed revisions will be included in the Upgrade Program and no further action will be taken on the submitted applications.

The recently completed modifications to the AC and DC electrical systems are being reviewed for acceptability as a separate issue.

2.

NUREG-0737 Technical Specifications (TAC 54535)

Theapplicationdated7/31/84(P-84242)wassubmittedinresponseto Generic Letters 83-36 and 37. Review of the Upgrade Program draft indicates that the requirements contained therein more closely follow the guidance contained in the Generic Let+.ers than the proposed application. Therefore, inclusion of this review in the Upgrade Program seems to be appropriate.

3.

Circulator Operability Requirements (TAC 56927)

The application dated 2/6/85 (P-85042) would require numerous changes to be found acceptable. The requirements proposed in the Upgrade Program are being revised as a result of the meetings conducted from July 22 to 26, 1985. Therefore, efficiency would indicate that his application should be included in the Upgrade Program.

4.

Restart Requirements The tendon wire surveillance requirements approved in the July 8, 1985 Safety Evaluation will be included in the Upgrade Program as j

comitted to by PSC.

The revised interim Control Rod Drive Mechanism and Reactivity Control Technical Specifications approved in Safety Evaluations dated July 12, 1985 and July 23,- 1985, will be included in the j

Upgrade Program as committed to by PSC.

=

ACTIONS BEING REVIEWED INDEPENDENTLY i;

i l'

Instrument Setpoints (TAC 47416)

Problems discovered in the methods used to establish instrument-i setpoints resulted in a 10/1/80 applications which was discussed at a meeting in Denver on 10/27/83 during which PSC agreed to a resubmittal. The reapplication provided by letter dated 6/21/85 (P-85214) is 'being reviewed by NRR under TIA 83-15.

The recent application contains some accident reanalyses which will require review in addition to the instrumentation review. Present plans call for completing _our review in ~ a time frame to allow incorporation into the Upgrade Program, however, due to the 1

magnitude of this review effort, a contingency plan to use existing values in the Upgrade at the time of issuance should be developed.

2.

.L.C.O.4.1.9(TAC 52634)

Following the discovery of nonconservative assumptions in establishing these power-to-flow requirements 10/11/83, PSC submitted an LER com-mitting to follow conservative guidance and provide a corrected require-I a

ment.- An application' dated 12/15/83 (P-83403) was reviewed and-i determined to be unacceptable. Meeting between us, our consultant at i

j ORNL and PSC (see summary dated 9/6/84) have not resulted in a revised application. ORNL. guidance on 7/17/85 and PSC submittal 8/1/85 i

(P-85271) indicate progress is being made.

This issue should be resolved in the near future with the result then included.in the Upgrade Program.

It may be appropriate for' another meeting among all' involved parties to reach final resolution l

[1 prior to the connitment of including the new requirements in the 10/15/85 Upgrade submittal.

L 3.

ISI/ISTRequirements(TAC 53417)

I The.12/30/83 (P-83416) application was submitted in response to commitments to include appropriate requirements in the TSs. The l:

preliminary results of our review were discussed during site meetings on July 22 to 26, 1985. The.results of our. review and the meeting discussions will be transmitted to PSC in the near future.

I We have determined that these inspection and testing requirements should not be delayed until completion of the. Upgrade Program and we

-will review the resubmittal PSC committed to submit within 90 days 1

of their receipt of our evaluation as a separate. issue.

~

4.

CirculatorOverspeedTripSetpoint_(TAC 55052)

The application dated 5/10/84 '(P-84137) contained insufficient justifi-cation to allow a compete review. A response to the 10/25/84 questions-

.was submitted by letter dated 12/27/84 (P-84537). A request for NRR review assistance.was made by memo'(Denise to Eisenhut) dated 1/28/85.

l o

2 Since this change will have little effect on the Uprade Program, the review is being handled separately.

5.

Organizational' Changes (TAC 56743) i 4

The 1/14/85 (P-85009): application was determined to be obsolete prior to the expiration of the notice period and a revised set of requirementswassubmittedbyapplicationdated6/10/85(P-85155).

The revised application, however, includes ~ a reference to the Fuel Surveillance Program which was submitted by letter dated 5/3/85 (P-85151)..

Prior to the approval of the revised application, it will be 4

- necessary for NRC to accept the Fuel Surveillance' Program as incorporating all of the past commitments and agreements on this subject. This review should be. completed in the near future so the organizational changes can be approved and issued to reestablish compliance with the TS.

6.

Xenon Stability Testing (TAC 57788)

In order to complete the initial rise-to-power testing program. item

~

on xenon stability, it is necessary to allow a temporary change

-to the TS requirement on control rod position. A special test exception type change was proposed on 5/22/85 (P-85179).

In order to allow completion of the test program during Cycle 4 (see P-85063 dated 3/5/85 for-the PSC commitment to complete these j

tests)thischangeneeds'tobeprocessedasaseparateissue.