P ll6U c
Auoust 7,1985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. W. Powell, Training Director, and Mr. K. Brockman, Operator Licensing Section, arrangements were made for administration of the initial licensing examinations at the Carolina Power and Light Company, Shearon Harris Nuclear Power Plant.
The written and operating examinations are scheduled for the weeks of November 4-15, 1985.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the selected reference material from the approved list in Enclosure 1 by September 6, 1985. Any delay in receiving this material will result in a delay in administration of the examinations. Our examinations are scheduled far in ad-vance with considerable planning to utilize our present limited examiner manpower and to meet the examination date requested by the various facilities. Therefore, missing the September 6,1985, deadline, even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities. Mr. Powell has been ac<ised of our selected reference material require-ments, and the number of reference material sets that are required; the examiners' names and addresses where each set is to be mailed is enclosed as Enclosure 3.
This request for information was approved by the Office of Management and Budget under a blanket Clearance Number 3150-0101 which expires on June 30, 1986.
Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations. Enclosure 2, "Administra-tion of Operator Licensing Written Examinations," describes our requirements for conducting these examinations. Mr. Powell has also been informed of these require-ments.
All operator and senior license applications should be submitted on Form NRC-398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certi-fications, and prepare final examiner assignments after candidate eligibility has been determined.
8509050277 850007 PDR ADOCK 05000400 V
PM f 10x
u Carolin:<. Power and Light Company 2
August 7, 1985 Thank you for your consideration in this matter.
If you have any questions regarding the examination procedures _and requirements, please contact Mr. Bruce A. Wilson, 404/221-5542, or Mr. Ken E. Brockman, 404/221-2694.
Sincerely, (Original signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosures:
1.
Reference Material Requirements 2.
" Administration of Operator Licensing Written Examinations" 3.
Examiner Addresses cc w/encls:
W.'Powell, Training Supervisor R. M. Parsons, Project General Manager A. Tollison, Nuclear Training Manager bec w/encis:
Senior Resident Inspector Document Control Desk State of North Carolina R I y RII acy' v/
R
.R RII RII a
EBrockman h W[,/85 son CATullan DMVerrelli LL e: f PR-w 08/6 /85 F 08/
08/ (, /85 08/7/85 08/02/85 08/ /85.
..o I
ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR. REACTOR-OPERATOR LICENSING EXAMINATIONS 1.
Procedure Index (alphabetical by subject)
2.
All administrative procedures'(as applicable to reactor operation or safety) 3.-
All integrated. plant procedures (normal or general operating procedures)'
4.;
Emergency procedures (emergency instructions, abnormal or.special procedures) 5.
-Standing orders (important orders that are safety-related and may supersede
~
the' regular procedures) 6.
Fuel-handling and core-loading procedures (initial core-loading procedures when. appropriate) 7.
Annunciator procedures (alarm procedures, including set points) 8.
Radiation-protection manual (radiation control manual or procedures).
9.
Emergency plan implementing procedures
- 10. Technical Specifications
- 11. Lesson plans (training manuals, plant orientation manual, system descriptions, reactor theory, thennodynamics, etc.)
- 12. System operating procedures
- 13. Piping and instrumentation diagrams, electrical -single-line diagrams, or flow diagrams
- 14. Technical Data Book and/or. plant curve infornation as used by operators
- 15. Any other material the examiner feels is necessary to adequately prepare a written examination, such as reactor traces of ~significant plant evolutions
- 16. ~ Questiens and answers,that licensee has prepared (voluntary by licensee) s i
4 m
... ~
2 August 7, 1985 17.- ' Malfunction and initial condition material for simulator-(if applicable)
~
All of the above reference' material should be approved,~ final issues and should be so marked. Uncontrolled, preliminary..or other such issues will (not. be acceptable. except for, cold-license : examinations.
If a cold-license.
- plant has not _ finalized some of the neterial, the. chief examiner is respon-sible for ensuring that the most complete, up-to-date' material -is available and that agreement has been reached with the licensee for. limiting changes before the administration of the examination. All procedures and reference
+
material should be bound or in the form used by the control room operators,
, ith appropriate indexes or tables of contents so that they can be used w
. efficiently.
[
l i
+
w
ENCLOSURE 2 ADMINISTRATION OF OPERATOR LICENSING WRITTEN EXAMINATIONS NRC Requirements:
1.
A single room should be provided by the facility for completing the written examination. 'The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility / contractor personnel for the duration of.the written examination.
If necessary, the facility should make arrangements for the use of a suitable room at a local
-school, motel, or other building. Obtaining this room is the responsibility of the licensee.
2.
Minimum spacing is one candidate per 5 X 21 ft., minimum size table with 3-feet spacing between tables. No wall charts, models, and/or other training materials may be present in the examining room.
3.
Suitable arrangements are to be made by. the facility for the candidates to have lunch, coffee, etc. These arrangements will be reviewed by the examiner and/or proctor.
4.
The facility shall arrange to have a maximum of one facility staff member per section available to review the examination questions and answer key.
This review will begin after the completion of the written examination and normally be limited to.two hours per examination (R0, SRO).
5..
The facility will provide sealed pads of paper for each candidate's.use in completing the examination. All reference material needed to complete'the
. examination will be furnished by the examiner. Candidates may bring calcu-lators but no other equipment or reference material to the examination room.
6.
Only black ink or dark pencil should be used for writing answers to questions.
7.
Candidates will be asked to provide positive identification at the start of the written examination.
v
,,q.
m 2
}.'
ENCLOSURE 3 Contractor Addresses:
'EG8G - Idaho, Inc.-
ATTN:.. F. Jaggar; P. 0. Box 1625/TSB 1580 Sawtelle Drive.
Idaho Falls, ID 83415 Pacific Northwest Laboratories ATTN: R..Schreiber
. Sigma 3 Building P. 0. Box 999 Richland, WA 99352 w