ML20134N298

From kanterella
Jump to navigation Jump to search
Confirms 850813 Telcon Re 850829 Meeting at Region II Ofc to Discuss Proposed Revs to Safeguards Contingency & Guard Training & Qualification Plans
ML20134N298
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/23/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8509050083
Download: ML20134N298 (1)


Text

,

O AUG 2 31985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - DOCKET NOS. 50-325 AND 50-324 This confirms the telephone conversation between Mr. P. Leslic of your staff and Ms. C. Perny of this office on August 13, 1985, concerning a meeting to be conducted at the Region II office on August 29, 1985 at 9:30 a.m.

You requested this meeting to discuss proposed revisions to the Brunswick Safeguards Contin-gency and Guard Training and Qualification Plans.

Should you have any questions regarding these arrangements, we will be pleased to discuss them with you.

Sincerely, Original Signed by Roger D. Valker Roger D. Walker, Director Division of Reactor Projects

  1. W. Howe, Vice President cc:

Brunswick Nuclear Project Box 458 Southport, NC 28461 d R. Dietz Plant General Manager Box 458 Southport, NC 28461 bec: A. Tillman State of North Carolipa Resident Inspectort/

Document Control Desk RII 6.lf Riff RII RII

)

CPerny: cs

(

rr JSt.ohr kFredrickson OVerrelli 8/lg85 8/j/85 8

/85 8/;))/85 8/t/ /85 8/ u/85 p'488Rsq.

i0.rE45