ML20134N274
| ML20134N274 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/22/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20134N277 | List: |
| References | |
| NUDOCS 8509050074 | |
| Download: ML20134N274 (2) | |
See also: IR 05000313/1985020
Text
_ _ _ _ _ _ _
.
,
AUG 2 21995
In Reply Refer To:
Dockets:
50-313/85-20
50-368/85-21
Arkansas Power & Light Company
ATTN: John M. Griffin, Senior
Vice President - Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the special inspection conducted by Mr. C. A. Hackney of this
office during the period June 19-20, 1985, of activities authorized by NRC
Operating License DPR-51 and NPF-6, for Arkansas Nuclear One, Units 1 and 2,
and to the discussion of our findings with Mr. James M. Levine and other
members of your staff at the conclusion of the inspection.
l
l
Areas examined during the inspection included determining the status and plans
l
for updating letters of agreement with offsite agencies. Within these areas,
l
the inspection consisted of selective examination of your emergency plan,
representative records, and interviews with personnel.
These findings are
documented in the enclosed inspection report.
During this inspection, it was found that one of your activities appeared to
deviate from a commitment made to the NRC.
This item and reference to the
commitment are identified in the enclosed Notice of Deviation.
You are
requested to respond to this Notice within 30 days by providing a written
statement or explanation which describes the corrective steps taken or
planned, the results achieved and the date when corrective action will be
completed.
The response directed by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
l
.
8509050074 850822-
ADOCK 05000313
G
7
g ,
1
ABO
k
C:RPBf
s
RIV: EPA:EPSi/[
C:AC:EP&SPS
C:R&SPB
C:P
C. Hackney: de
JBBaird
REHal1
LEM tin
(Johnson
3 /15/85
1/II/85
b/fG/85
J//0/85
[ /g\\/85
_ _ _ _ _
'
.
' Arkansas Power and Light' Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
.
Sincerely,
orgin-t m2r.ed By
E. M. Jour.rn
E. H. Johnson, Chief
Reactor Project Branch
Enclosures:
Appendix A - Notice of Deviation
, .
Appendix 8 - NRC Inspection Report
-
50-313/85-20
50-368/85-21
cc w/ enclosures:
J. M. Levine, General Manager
Arkansas Nuclear One
l
P. O. Box 608
l
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
E
bec to DMB (IE35)
i
bcc distrib. by RIV:
- RP82
- Resident Inspector
R. D. Martin, RA
,
- EP&RPB
- Section Chief (RP82/A)
- D. Weiss, LFMB (AR-2015)
- RIV File
R. Denise, DRS&P
- C.
Hackney
- MIS SYSTEM
- RSTS Operator
- J. Baird
R. Bangart, DRS&S
- w/766
.,-.
S
.}
-
,