ML20134N251
| ML20134N251 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/26/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20134N254 | List: |
| References | |
| NUDOCS 8509050053 | |
| Download: ML20134N251 (1) | |
See also: IR 05000413/1985034
Text
Yf C00
..
AUG 2 61985
Duke P
r Company
..TTN
Mr. H. B. Tucker, Vice President
Nuclear Production Departmant
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJtCT: REPORT N0S, 50-413/85-34 AND 50-414/85-31
On August 5-8, 1985, NRC inspected activities authorized by NRC Operating License
NPF-35 and Construction Permit No. CPPR-117 for your Catawba facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
'S
L
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
,
Enclosure:
Inspection Report Nos. 50-413/85-34
'
j
and 50-414/85-31
cc,w/ encl:
. L. Dick, Vice President - Construction
L'M. I!ampton, Station Manager
bec w/ encl:
lgMjg gg13'
N
NRC Resident Inspector
W Johnson, ELD
e
pm ,
V N. Jabbour, NRR
,
'
' Document Control Desk
Sfate of South ' Carolina
R l
I
RII
II
g
l
,
g:cdg
$ ake
AHerdt
A
son
i
I
[]
3/p /85
,/vl/85
08/3)/85
0/ /85
S Ec> I