ML20134N223
| ML20134N223 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/28/1985 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20134N220 | List: |
| References | |
| NLS-85-315, NUDOCS 8509050042 | |
| Download: ML20134N223 (2) | |
Text
-
ENCLOSURE 2 TO SERIAL: NLS-85-315 PROPOSED BRUNSWICK-2 TS PAGE i
t P
O&
4 4
~ * ^
~., _ _. _ _ _ _ _ _,,,,, _,
~ -
(BSEP-2-74)
\\
to h
TABLE 3.6.3-1 (Continued)
E5 PRIMARY CONTAINMENT ISOLATION VALVES R
I ISOLATION TIME VALVE FUNCTION VALVE CROUPAI (Seconds)
U$
1 HPCI steam line isolation valves 4
w i
E41-F002 55 E41-F003 50 HPCI torus suction isolation valves 4
80 E41-F042 E41-F041 RCIC steam line isolation valves 5
20 E51-F007 E51-F008 Drywell purge exhaust backup valve 6
15 y
CAC-V10 Containment air purge isolation valve 6
15 CAC-V15 Suppression chamber vent valve 6
15 CAC-V22 Drywell purge exhaust backup valve bypass valve 6
15 CAC-V23 l
Suppression chamber makeup and containment atmosphere 6
15 dilution inlet valve CAC-V47 I
B Drywell makeun and containment at' osphere dilution 6
15 m
t inlet valve
,5 CAC-V48 n
5 1.
See Specification 3.3.2, Table 3.3.2-1 for isolation signal that operates each valve group.
I