Requests Amend to 850823 Application to Amend Licenses NPF-11 & NPF-18 to Incorporate Suppression Pool Water Level & Water Temp W/Remote Monitoring Instrumentation During First Refueling Outage to Reflect Only Unit 1
ML20134M937
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/27/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
References
NUDOCS 8509040352
Download: ML20134M937 (3)


Text

I~

\

AUO 2 7 Docket Nos. 50-373/374 Mr. D. L. Farrar Director of Nuclear Licensing Conconwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

REQUEST OF AMENDMENTS TilAT ARE IllPLEMENTED IN THE FUTURE FOR LA SALLE UNIT 2 We note that in your August 23, 1985 letter requesting amendments for La Salle Units 1 and 2, you requested implementation of these changes for the first refueling outage for each respective unit. The first refueling outage for Unit 2 is projected sometime in 1987. As was indicated to your staff

-(Mr. Massin), a proposed amendment should not be left pending on a docket-for a long time before implementation. This guidance was provided to your staff at the time you submitted the proposed anendments to incorporate the instruments for the suppression pool water level and water temperature with the reacte shutdown monitoring instrumentation, dated April 18, 1985.

We, therefore, request that you amend your August 23rd request to only reflect the change for Unit 1; and at about the tine for the the Unit 2 refueling outage, this request should be submitted for Unit 2. We also request that this approach be followed for the remote shutdown instrumentation and for all future proposed changes that affect both Units'of the La Salle plant.

Sincerely,

- - - . ergetant sYanoa bys' Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing cc: See next page DISTRIBUTION: lDiichidili NRC PDR Local PDR PRC System NSIC LB#2 Reading EHylton ABournia.-Woodhead,0 ELD ACRS (16) JPartlow BGrimes Edordan

,LB#2/ L/PH LB#2/DL/BC

-ABournia:lb- WButler s 08/A7/85 08/g7/85 ~

8509040352 850827 PDR ADOCK 05000373

_P_ PDRc u

e Q TEC 8  %, UNITED STATES - j 8 o NUCLEAR REGULATORY COMMISSION 5 ;j WASHINGTON, D. C. 20555

\*****/

AUG 2 71985 Docket Nos. 50-373/374 Mr. D. L. Farrar.

Director of Nuclear Licensing Connonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

REQUEST FOR LICENSE AMENDMENTS THAT ARE TO BE IMPLEMENTED AT A FUTURE DATE FOR LA SALLE UNIT 2 We note that in your August 23, 1985 letter requesting amendments for La Salle Units 1 and 2, you requested implementation of these changes for the first refueling outage for each respective unit. The first refueling outage for Unit 2 is projected sometime in 1987. As was indicated to your staff (Mr. Massin), a proposed amendment should not be left pending on a docket for a long time before implementation. This guidance was provided to your staff at the time you submitted the proposed amendments to incorporate the instruments for the suppression pool water level and water temperature with the remote shutdown monitoring instrumentation, dated April 18, 1985.

We, therefore, request that you amend your August 23rd request to only reflect the change for Unit 1; and at about the time for the the Unit 2 refueling outage, this request should be submitted for Unit 2. We also request that this approach be followed for the remote shutdown instrumentation and for all future proposed changes'that affect both Units of the La Salle plant.

Sincerely, -

Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing cc: See next page

._. l.

IMr. Cer.nis L. Farrar - .

La Salle County Nuclear Poxer Station

-Commonwealth Edison. Company Units 1 & 2 cc:

Philip P. Steptoe, Esquire John W. McCaffrey Suite 4200 Chief. Public utilities Division One First National Plaza 100 forth La Salle Street,-Roon S00 Chicago, Illincis 60603 Chicago, Illinois 60601 Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago,' Illinois 60601

~ Resident Inspector /LaSalle, hPS .,

U.S. liuclear Regulatory Commission Rural Rcute No. 1 Post 0Ffice Box 224 Harseilles, Illinois 61341 Chairman La _Salle County Board of Supervisors La _Salle County Courthouse Ottawa Illinois 61350 Attorney General 500 Scuth Eno Street Springfield, Illinois 62701 Chairm'na Illinois Comerce Cotmission-Leland Building 527 East Capitol Avenue Springfield, Illinois 62706 s

Mr. Gary N.' Wright, llanager.

.~

Nuclear Facility Safety .

Illinois Department of Nuclear' Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois .62704 Regional Administrator, Region III U. S.~ Nuclear Regulatory Commission

- 799 Rcssevelt Road Glen Ellyn,~ Illinois 60137 n.:.