ML20134M884

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-395/85-26 on 850603-07. Violations & Deviation Described Under Consideration for Escalated Enforcement Action.Number & Characterization of Violations May Change as Result of NRC Review
ML20134M884
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/20/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20134M887 List:
References
NUDOCS 8509040324
Download: ML20134M884 (2)


See also: IR 05000395/1985026

Text

, i

If llou)

-

.t

AUG 2 u ison

South Carolina Electric and Gas Company

/ ATTN: Mr. O. W. Dixon, Jr.

Vice President, Nuclear Operations

P. O. Box 764 (167)

Columbia, SC 29218

Gentlemen:

SUBJECT: REPORT N0. 50-395/85-26

A special announced safety inspection was conducted by this office during the

period of June 3 - 7, 1985, of activities authorized by NRC Operating License

No. NPF-12 for the Summer facility. This inspection included a review of SCE&G's

implementation of 10 CFR 50, Appendix R, Sections III.G, III.J. III.L, and III.0

requirements at your Summer facility. As a result of the inspection, failures to

comply with NRC regulatory requirements were identified.

The violations and deviation described in the enclosed Inspection Report are

under consideration for escalated enforcement action. Accordingly, no Notices of

Violation or Deviation are being issued at this time. No response to this letter

is required. However, please be advised that the number and characterization of

violations described in the enclosed report may change as a result of further NRC

review.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

You will be advised by separate correspondence of the results of our delibera-

tions on this matter.

Sincerely,

DRIGINAL SIGNED BY!

9. NELSON GRACE

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-395/85-26

cc w/ encl:

v0. S. Bradham, Director, Nuclear Plant

Operations

A . G. Croley, Group Manager

d. Technical &SupportServices

R. Hunt, Associate Manager

Surveillance Systems

/J. B. Knotts, Jr.

bec w/ encl: See page 2

'g

9509040324 B50820

PDR ADOCK 05000395

G

PDR ggo g

,

.

South Carolina Electric & Gas Company 2 AUG 2 01985

bec w/ encl:

/NRC Resident Inspector

/J. Hopkins, Project Manager, NRR

Document Control Desk

State of South Carolina

v F. McKee, IE/ORPB

. Benaroya, NRR/CHEB

. D. Parr, NRR/ASB

4. Whitney, IE/0RPB

4.H. Miller

4. A. Taylor

sH. D. Hunt

f. M. Madden

R RII RII$3 RII A RII RI

P.a in TEfonlon

1/(o/85 Of//,/85

RII.N

4

ARHerdt

08/ /85

AGibson

$

DVerrelli

08/d/85 08/jp/85

ftlr

Wai

c

08//h/85

J lshinski

08//[, /85

"

.