UNITED STATES j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 2006H001
\\...../
BOSTON EDIS0N COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE l
Amendment No.168 License No. DPR-35 1.
The Nuclear Regulatory Commission (the Comission or the NRC) has found i
that:
1 l
A.
The application for amendment filed by the Boston Edison Company (the i
licensee) dated May 1, 1996, as supplemented August 12, 1996, complies I
with the standards and requirenents of the Atomic Energy Act of 1954, as amended (the Act), and the Co mission's rules and regulations; 1
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; l
C.
There is reasonable assurance:
(1) that the activities authorized by l
this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defanse and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulhtions and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended to approve the relocation of certain Technical Specification requirements to licensee-controlled documents, as described in the licensee's application, dated May 1, 1996, as supplemented on August 12, 1996, and reviewed by the staff's safety evaluation report dated November 12, 1996.
This license is also amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating
~
I License No. DPR 35 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.168, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
9611210146 961112 i
POR ADOCK 05000293 P
PDR e
. I
\\
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
Implementation shall include the relocation of Technical Specification requirements to the appropriate licensee-controlled document as identified in the licensee's application dated May 1, 1996, as supplemented on August 12, 1996, and reviewed by the staff's safety evaluation report dated November 12, 1996.
l FOR THE NUCLEAR REGULATORY COMMISSION I
l S. Singh Bajwa, Acting Director i
Project Directorate I-1 l
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l
Attachment:
l Changes to the Technical Specifications Date of Issuance: November 12, 1996 i
a i
ATTACHMENT TO LICENSE AMENDMENT N0.168 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 i
~
Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and l
contain vertical lines indicating the area of change.
i Remove Insert 6-7 6-7 6-8 6-8 6 15 6-15 i
l
6.0 ADMINISTRATIVE CONTROLS (Cont) i 6.5 REVIEW AND AUDIT (Cont)
B.
Nuclear Safety Review and Audit Committee (NSRAC) (Cont) 8.
Audits Audits of facility activities shall be performed in accordance with the Boston Edison Quality Assurance Manual under the cognizance of the NSRAC.
l l
i l
l l
I t
9.
Authority The NSRAC shall report to and advise the Senior Vice President Nuclear on those areas of responsibility specified in Section 6.5.8.7 and 6.5.B 8.
l 10.
Records l
Records of NSRAC activities shall be prepared, approved and distributed as indicated j
below:
l Minutes of each NSRAC meeting shall be prepared, approved and forwarded a.
to the Senior Vice President Nuclear, NSRAC members, and others the Chairman may designate.
l i
l l
"; i::.. W-Amendment No. 29, 30, S S, 00, 'i, SS,104,122,132,132,168 6-7 i
4 4
i s,
l 60 ADMINISTRATIVE CONTROLS (Cont) l
- 6.5 REVIEW AND AUDIT (Com)
\\
B.
Nuclear Safety Review and Audit Commntee (NSRAC)(Cont) l 10.
Records (Cont) b.
Reports of reviews encompassed by Section 6.5.B.7.e, f, g and h abow, shall be prepared, approved and forwarded to the Senior Vice President - Nuclear, with a copy to the Station Director within 21 davs i
following the completion of the review.
I c.
Audit reports encompassed by Section 6.5.B.8 above shall be pmet in accordance with the Boston Edison Quahty Assurance Manual.
6.6 REPORTABLE EVENT ACTION The foK. ru actions shall be taken for each reportable event:
A.
The Comnussion shall be notified and/or a report submitted pursuant to the requirements of either 10 CFR 50.72 or 10 CFR 50.73.
B.
Each Reportable Event Report subnutted to the Comnussion shall be raiewed by the ORC and subnutted to the NSRAC Chairman and the Station Director 6.7 Deleted 6.8 PROCEDURES A.
Written procedures and adnurustrative policies shall be establichert, impicenented and maintaia~l hat meet or t
exceed the requirements and imiwis.dations of Sections 5.1 and 5.3 of ANSI N18.7 - 1972 and Appendix "A" of USNRC Regulatory Gmde 1.33, except as provided in 6.8.B and 6.8.C below.
B.
Each procedure of 6.8.A above, and changes thereto, shall be raiewed by the ORC and approved by the responsible department manager prior to implementation. These procedures shall be resiewed periodically as set forth in adnunistratise procedures.
NOTE: ORC review and approval of procedures for vendors / contractors, who have a QA Program approved by Boston Edison Company, is not required for work perfonned at the vendor /contmetor facility.
C.
Temporary changes to procedures of 6.8.A above may be made provided:
1.
The intent of the original procedure is not ahered.
1
(
l i
1 Amendment No. 29,30,15,69, ?', SS,101, !22,132,133,168 6-8 i
i l
6.0 ADMINISTRATIVE CONTROLS (Cmg i
THIS PAGE INTENTIONALLY LEFT BLANK 6-15
,