hh August 27 1985 0

MEMORANDUM FOR:

John F. Stolz, Branch Chief, ORB #4, DL FROM:

Owen Thompson, Project Manager, ORB #4, DL

SUBJECT:

THREE MILE ISLAND, UNIT 1 (TMI-1), SPDS AUDIT On August 12-14, 1985, the NRR staff performed an audit of the Three Mile Island, Unit 1 (TMI-1) Safety Parameter Display System (SPDS).

The audit team consisted of Leo Beltracchi and tiichard Shaker from Human Factors Engineering Branch (HFEB), and Joseph Joyce from Instrument and Control Systems Branch (ICSB).

I was present on the first and last days of the audit.

The licensee provided a two-hour briefing of the overall SPDS system.

Copies of the slides used are enclosed. The staff then audited the licensee's documents and observed the SPDS system in operation. The audit. programs outlined in letters to the licensee dated April 5 and July 9,1985 were basically followed.

i At the exit briefing on Wednesday, August 14 the staff informed tne licensee that the TMI-1 SPDS system is generally a good system which reflects the value resulting from Human Engineering input throughout development. The staff will be requesting the licensee to provide a copy of the validation test program report. Also, additional information will be requested to confirm the adequacy of certain isolation devices that protect the Class 1-E electrical circuits. The staff also indicated that the Procedures and Systems Review Branch (PSRB) review of the selection of critical parameters was not covered during the audit.

04531 R*J 59 Owen Thompson, Project Manager Operating Reactors Branch #4, DL

Enclosure:

As Stated cc w/ enclosure:

~

G. Lainas W. Regan L. Beltracchi R. Shaker F. Rosa J. Joyce D. Ziemann DISTRIBUTION F. Orr Docket File J. Thoma ORB #4 Rdg l

0. Thompson Memo File i

PDR l

L PDR i

'TO'T[

p ORB #4:DLST ORP#4:9L ORB 4:D HF IC l

0 Thompson;cr G $h-JStolz LBel racchi JJoyce 8/v /85 8/3)/85 85l/85 8g /85 8/3?/85 l

8508300494 850827g9 DR ADOCM O

h, %

Bll2/8.s' 0

TMI-l SPDS OVERVIEW NRC AUDIT AUGUST 12,13, AND 14,1985 J

H. C CRAWFORD

f.,

n INTRODUCTION o

EVOLUTION OF THE SPDS IDEA SLIDE 1 o

DESCRIPTION OF PT PLOT SLIDE 2 CONCEPT OF SPDS o

FLOW CHART (PAGE 1)

SLIDE 3 o

USERS SS/STA 0

CSFs SLIDE 4 o

SELECTED PARAMETERS UNIQUELY DEFINE CSFs NUREG 0737 SUPPLEMENT 1 REQUIREMENTS o

SAFETY ANALYSIS SUBilTTED 4/30/84 o

B11-1 SPDS DEFINITION SLIDE 5 o

TMI-1 SPDS PURPOSE SLIDE 6 o

USED FOR OVERVIEW PURPOSES NOT TO CONTROL THE PLANT o

B11-1 SPDS HAS BEEN PROMPTLY IMPLEMENTED

~

N0 TECH SPEC CHANGES OR UNREVIEWED o

SAFETY QUESTIONS o

HUMAN FACTORS DESIGN PHILOSOPHY o

USER TRAINING WITH & WITHOUT SPDS

DISPLAY DESIGN o

FLOW CHART (PAGE 1)

SLIDE 7 o

USE EXISTING PLANT COMPUTER SYSTEM SLIDE 8 RELIABLE OPERATING EXPERIENCE (5-10 YRS)

ENHANCE USEFULNESS OF SPDS (F#ilLIARITY, CONFIDENCE, LOCATION)

V&V ONLY ITEMS ADDED TO SYSTEM BY SPDS SPDS IMPLEMENTATION o

FLOW CHART (PAGE 2)

SLIDE 9 o

DISPLAY HIERARCHY SLIDE 10 o

ALARM CRT SLIDE 11 0

CRT CONSOLE SLIDE 12 o

SPDS MENU SLIDE 13 SPDS FINAL DISPLAYS POWER OPERATION l

0 REACT / POWER DIST & PRIM SIDE HEAT REMOVAL LOW POWER 3 RC PUMPS SLIDE 14 l

POWER > 20% 4 RC PUMPS SLIDE 15 POWER > 55% 4 RC PUMPS SLIDE 16 LEVEL 2 DISPLAY SLIDE 17 o

RCS INTEGRITY SLIDES 17 AND 18 o

RADIATION CONTROL SLIDES 19 AND 20 o

CONTAINMENT CONDITIONS SLIDES 21 AND 22 l

l

POST TRIP o

REACTIVITY / POWER DISTRIBUTION SLIDES 23 AND 24 o

PRIMARY SIDE HEAT REMOVAL FORCED FLOW SLIDE 25 o

RCS INTEGRITY FORCED FLOW SLIDES 26 AND 27 o

PRIMARY SIDE HEAT REMOVAL SLIDES 28 AND 29 NATURAL CIRCULATION o

RCS INTEGRITY NATURAL CIRCULATION SLIDES 30 AND 31 4

O e

w

r Evolution of the SPDS Idea TMI-2 Lessons Learned 5

Vendor Abnormal Pressure Transient Temperature Operating Plot Guidelines (PT Plot)

(ATOG)

~

Symptom Safety Oriented Parameter Emergency Display Procedures System (EOPS)

(SPDS)

\\

,n,e,r

.---------,-..--,w,

-..-.----_...n

SPDS Definition The Safety Parameter Display System (SPDS) will aid the control room personnel in determining the overall plant safety status and determining if the actions taken by the operators have brought the plant to a stable and safe condition.

f$f q 4 (f 0

SPDS Purpose

1. Provide organized information at one location.
2. Continuously monitor information.

P'w c~v'lo

3. Primary use for off normal events.
4. Secondary use during normal evolutions.
5. Critical safety function approach.]

I/'/[-I-.

$/'f' S

n a n.,

f*wornef,$%t.cruv{

wla,W,4 q, y, a-

a b

i SPDS DISPLAY HIERARCHY nrACum usea CENT

  • irs essa Desimes ymp A CSF woufCN PWT SAFETY M CRT) '

STATUS mEviEW lI patssspos BUTTON ON CRT CONSOLE 1P

{(

Spos weNu

)I 2

DesPLAy APPgAng ON UTIUTY CMT COMPUTEM

/

AU10MATICALLY ACruA es j g Y

E.f} //

/

1 "Es* MEW

?

/

08 SPLAY N

O aAcn lf COMPUTER

}

tviEmunes POST TmiP conCao PtOw Pmopem PLANT CONDITON POST TRep NAruRAL CWICULATION s

v V V 1r V

y y

SaOE REACTMTV N"

cm RADIATON

/

CoNTAINutNT MEAT REwowAL DeSimesuTioN Ev57tu CONTROL eNitomiTy CSF DISP Af

/ 9[

CON 0iTON L

CSF 04 SPLAY CSF DISPW CSF DISPLAY CSF DISPLAY OR W 6

DESIGNING AND IMPLEMEf4 TING AN SPDS

./

T/

N / _... T

' 0;,s:NG

- E.,o,SPoS i

{ REQUsRE WE NTS

.(

( E XPER*E NCC h

UTE RATURE

\\

N

_E OsxCYlvtS gf 'W k(lP*

1%'ai I

DEVELOP INa TIAL USER GUIDELINES vev ogs,Gu i

bL C

SAFETV f

FUNCTIONS f

Risw ASSESSWENT i

PROGRAM Ij NEw mSTRussENTATON l

RS f

[ TRANSrENT a n.

(ATDO. EOPS

'*"'7 U~ SAT DESIGN DOCUMENT ANO g

SAT

(

SarETv ANatvSiS) f [8 p g6 i

(

g )e

[

oiSet Av of SeGN I

,ER,ORu PRE LiMINARY a,

E NGINEERsNG vav I

TEAM cc,,,,,

of$iG

,g DEsiNE l

l g

ENG DISPLAY NIERARCNY PURCNASE PERFORu EQuePMENT DE TAiLE D ENG* NEE RING RtSK l

ASSESSMENT ORGANt2E PROGRAM PARAMETERS k

IN1Q 2,

DISPLAYS f TRANS3ENT ANALYSsS PROGRAM REV EW (A100 EOPS)

EWLUAfsDN UNSAT UNSAT SAT l

l WOOiFY NO PLANT 80tLD CEvfLO*

DEVELOP STATIC PARAME TE R DETAILED i

DISPLAYS WLIDATCN USER ON CRT WETN00 GUIDELINES PEasORu l

1 I

TE STING I

PRESENT SPDS70 PLANT MANAGEMENT RE vif W UNSAT hu

\\

7,,'a*G ENGR N

7 USERS AND"

/

URVEY pg

[

TURNOVER I

t=Ga i

NEW OR M00tFIED l

EOuipue NY ALL U$

COuwENTS

[ REOuiREufNTS \\

RESOLVED i

DOCUwtNT L

GuiD L NE5 A

A

[

Ie0PLE a0E N TATION l

6 l

l

[

TRAINsNo j

[

PROCEDURES l

l SOFT WARE DE SK.N

]

l 2 L2 F'

l' COWPUTE 2

DESGN SYSTE u enc DEFINE CENTiFy MARDWARE 4 LESSON M,,gy*nay ARE F

NE W 08JECTivES PROCEDURES DEFINE DATA BASE CNANGES CENT DE SIGN CMANGE'FY E VALUATON ENGR S TO WSAT E utSteNG PROCEDURES SAT DEFINE INTE RF ACE S SETWEENEN: STING AND NE W OESGN warTE A

ENG LESSON REVIEW i

FLOinCMART 8"I CODE iSP AY L

SOFTWARE EVALUATCN SUOuif NEW AND REVi$EQ VEd f

UNSAT PROCEDURES TEAW m,,

FLOW CNART SAT AND CODE ALAmu SOFTWARE PERFORu

$^go TRAIN 8NG ygggg,g gy UNSAT SAT SOFTWARE ' T '.

DE SGN DOCUMENT

[

WEmer CAflON AND WALIOAftOM

]

t WRITE

{f#,y

  • Ns Nehs PROCEDURE o

ygg Va PROJECT SOUNOAntES 8%*

PLAN DESGN DOCUMENT AND

$'AR SAFETY vpg

% es.

DESGN REVIEW ANALYSIS rgsy av ENGR PERFORM UNSAT PROCEDURES PEQUIRE ME NTS VE RIFICATION SAT EOUsREMtNTS DOCUMENT AND MEOUIRE MENTSTa USER GU'OE UNE S PERFORM VIkg' ON TEAM s

s PROCEDURE PERFORM SOFTWARE SOFTWARE DESGN

,h DOCUMENT SOFTWARE 1

DE SGN

,2 gpg

. ogefg DE$lGN REv'EW i

a%a ENGR RESJLTS REPORT TI UNSAI DEFINE TE ST

$At METNOOOLOGY I

TEST a

PLAN DE FINE ADOfTCNAL DS TESTING C TESTPy YES i

l l

FINAL REPORT l

l

y

/

SPOS DISPLAY HIERARCHY POWFR OPERATION L 2776 = 3 and SPDS M N RCS Tergerature 1 525'r 1.

Reactivity / Power Dastribution 2

Primary Side Ileat Removal 3

Reactor Coolant System Integrity 4

Radiation Control 5.

Containment Conditions Select I or 2 Select Then Execute Ji Then Execute p-7____q l

l J6 tW-V-5 NO NIPWR NO 8

PAGE A and B

< 55%

l lose <f BACK j

l l

1 YES YES l

S Y ILEVEL 1 NOTE 1 l

SELfrr 3 Stif'CT 4 SELfrr 5 1

3 P q p q p l

THEN EXfrUTE THl'N EXtr PTE TifEN E(ECUTE I

l g

DISPLAY l DISPLAY 2 DISPLAY 3 DISPLAY 5 DISPIAY (o DIS? LAY 7 g

PRf'VIOUS OR PT PIBr PT PIEF PT PIUT TABULAR' TAPULAR

.Nd:bT o e e TABUIAR I

FLUX /FIDW/IMB FLUX /FIDW/IMB FLUX /FIDW/IMB l

INFORMATION INf'ORMATION INFORf 4ATIOff I

fw FIDW/POWP:R FW FIDW/ POWER FM FLOW / POWER l

4 7l 8

l l

t 5

i PAGE PAGE FORWARD BACK l

1 r I

I l

t DISPLAY 4 I

l l

g TARULAR l

N(7FE lt If display 3 is active it will not INFORMATION g

automatically transfer luck to 8

Display 2 until N!PWR t 45%

8 L.

.J 4

I SPDS DISPEAY HIERARCHY TOST TRIP FORCED FtDW PUMPS # 0 and 12776

  • O or PtfMPS # 0 arkt RCS T1J4Pf7AB1RE < '25*F PT P1HT BUTTON g

SPDS F1tNU l

l.

REACTIVITY /POWf1t DISTRI HtfTION

^

i PUMPS # 0 3.

REACTtAt COOLAN' SYSTEM INTtERITY 4

RACIATION CONTROL W776 mm 7

5 CYWTAINMINT CullulTIONS g

g g

l MiD PUMPS # 0 SELECT 1

j g

THEN ExtrUTE I

J k PAGE BACK LEVEL 1 1

SELECT 1 SELECT 2 SFLECT 3 SELECT 4 STLECT S htN EXECUTE THFN EXECUTE 1 F THIN EXtrVTE

. *THEN EXtrtJT1 THEN EXECUTE DISPLAY 8 DISPLAY 9 OtSPLAY 10 DISPLAY 6 TABULAR PRfNIOUS OR PT PIDr DISPLAY 7 INFORMATION TABULAR NTXT TAIMJLAR INFORMATION INFORMATION TAl9UI.AR ea INFORMATION i_

a w

LEVEL 2

W SPDS DISPLAY HIFRARCtfY POST TRIP NATURAL CIpcutAfgry4 PUMPS. O ar,3 g,;, y,,

/

or PUMPS = 0 and RCS T12? :.RATU.< R < 52 %,

PT PIDT RUTTm ON CRT 4 7

Cm SOLE IS DEPRESSED AND PUMPS

  • 9 SPOS MENU 1.

REACTIVITY /MMER DISTRIBUTION 2.

PRIMARY SIDE HEAT REMOVAL L2776 CHANGES STATE 3.

REACTUR COOLANT SYSTfN INTEGRITY m

rpm I to O AND 4.

RADIATIm CMTROL pumps. o 3.

CONTAINMfMT CONDITIONS Sf: LECT J

g TIf1N EXtrUTE d b PAGE ItACK Lf'VII 1 SELECT I SELfr7 2 St1ECT 3 SELFCT 4 THEN EXECUTt; SELir? 5 THl.N EXECUTE.q p THEN EXECUTE THEN EXECtrl TlifN EXECtrrt DISPLAY a I

I ng3pgy g g r

DISPLAY 12

[

TABUI.AR DISPLAY 6 PT Plaf PREVIOUS OR DISPLAY 7 1

INFORMATION TAfsULAR AND TAttULAR g e e eN. e ItAR CitART g

j INFORMATION INFOR W W TA ULAR

]*

  • INfDRMATION a

l I_

j 7

LEVEL 2 j

"3 E

LLJ E

2:

LLJ U~)

D-f.h M

W J

W CL 3

CO o

W S:t D-M 2

H W

CM C3 LLJ CM

=

c W

H (D

L&J ll"3 LLJ I

3 C

5:A H

CC J

Z c

r.

CE:

E C

CC

==.

C Q

Ch O

2C Ch E

L.LJ

=

D-A LLJ CD H-CA:

CA

  • -e LJJ CM D--

6- -

LL.

LLJ Ch J

  • -e C

3 CC o

s:a U")

CD LLJ CM M

C1.

Z Z

F-O CC 2

W LLJ J

C3 f=3 CD W

D-M C"3 2

th W

X LAJ o

g 2>

D-CM

  • e Z

Cn CD O

H CC T

CC W

2:

r_.)

>e CC f=a 2

u.J CL*

LLJ CI:

CD

- to OJ M

T Lf")

2 **

WQ

OO OO NN

.O 4 CD 4 CD

_J J C

(A A DD

' U1 OO to la OO C0 N

.J J vi vi O

.r

++

M Ce 2

O LLJ

,0 M

=

CZ" Ch.:

CD LLJ U1 ts

,o

\\

(4 C1 CL.

01 U1 i

O

\\

O CO

  • \\

' *O CC LL.D

=

CD 4 f.D

\\

CL.

=E U1 O

k L O

U1 O

U1 O Lf1 O

'O l 3 3L

?

M M

C4 04 J

d O

O Cr.

LA. =

LL.

JO=

CJCQ%Z%

O I

C LLJ CC OU T

04 0

<j e

w CC O O l

LLJ L

CL.

O Z co rs bb r

OC N

=

L.U U10:

O C=6 sb LD CD f/>

O LU H

'(4 4 to O

CII CJ (o

1 w >- >=

sp U1 C

l CC O

cl.

i O CC y

ou O

OO J

eJ v.-

un O

g CC f O. w w 7 01 e

O Aww

, 04 CQ i

e4 c4 O

Cn.'

=

T O LLJ U1 E

l 3 4 (D Z

O O LL Q.

u.

T Q

O O O O O O O O O O O O O8 O

O O O O O O O 03 m ?

04 t

I'1 (4

a O m (0

()

(4 (4

(4 (4

(4 w

w T

LL.J Ca.;

CL f.O - O CL. CD = LLJ CC

.N' t.J CL CC 1u (O fO i

l l

REACT /P0llER DIST t PRIM SIDE HEAT REMOVAL ~- POWER OPERATION PA 2164.O THA ESS. o FB 2165.o THB 535.o yFHA 1.53 TCA 572.o 2900,,

g ri4B 1.51 FHR 3e RS 2200-F EI 2 00-W.'*~

SG 2000

3. 5 i

S isee F

I

3. 0-tese L

i 59e 560 580 Goo 62o 02.5-H0T LEG TEMP F

W

/

t 2.e-i FHR 30 It1B

-t. 9 l

P toe- [j

\\

M*'5-

/

O so-L r. o.

/

U Go B

E se

0. 5.

/

1 R

H o. e 2o' o

10 20 30 9e 5e se p

i o

7

-90

-20 o

20 9o P0WER 7

i I ll B A L A f1 C E 3

  • Loop A i

...... -f-L o o P B I

5SE> NEWT

}

DISPI.AY 2 i

D R

OO (0 W ttiin O

tti iti

, O.

  • * +

4 CD 4 CD C

CL CL OO

'O OO HH OO N

JJ N

O N

' (o

+.f.

CE*

2 W

O

.O b

M C

C K

O L.AJ O (0

\\

'W CL.

CL 7 w A

Q in tn m o

Cd O

'in t.LJ

=

O 4 C0 O

k L2O

g" C1.

Og.

in C

til O

O in, C

in r Ltl i 3 Ea.

W Lti iti r

t M

M ' 04 04

  • ss' J

C LA. =

LA.

J C"3 =

E J CA **

T Cd k

_=.

C

-U CC O L.A.

7 c4 0

>-~

=*

CW*

l

-l LAJ CL O

Z.4.*

t c

OO OC N

LAJ w w O

A W L1J CD w

A I

O LA.J (O

6-

' 04 4 CD C

U CII (0

  • -*>- F tti C

CC (D

c O CC L2; i.

ou O

J OO eJ 6--

La

@ g C

t.O t la O

O veww

. C4 CG A.*

)

I (4 04 O

C CL*

7C LAJ La E

3 4 CD T

O O D. a.

a t

CL.

O O O O O O O O O O O O of O

.O O O O O O O 0:e W r (4

H 7

(')

('d

.* O (ft 0:1

.4 f) r4

(-4 (4

(4 (4

w CI-LAJ CC CL. (.O - t D CL. C :"2 LA.J C A.*

N l1 CL CC 1.1J t O t n

o 1

i, i

i

{i REACTIVITY / POWER DISTRIBUTION POWER OPERATION POWER RAtlGE INTERNEDIATE RANGE i

POWER IMBALANCE

~

STARTUP RATE 4

11 1 - 5 99.2 PCT

- 1.1 PCT NI - 3

0. 0 DPM tlI - 6 99.1 PCT

-1.4 PCT NI - 4

0. 0 DPM fil - ?

99.2 PCT

-1. 0 PCT l

!!I - 8 99.3 PCT

-1. 0 PCT i

l t

i

{

RCS TOTAL FLOU 102.6 PCT l

l l

l i

MM EM I

1 DISPLAY 4 I

I 1

2 REACTOR COOLANT SYSTEM INTEGRITY POWEP, OPERATION RB SUMP RCS FLOW BALANCE 9.1 GPM

' VOID FRACTION 0.00 PCT LEVEL A 45.00 IN AVG PRESSURIZER LEVEL 220.00 IN LEVEL B 45.00 IN SUBC00 LING MARGIN 70.00 DEGF 6

IIASS BALAllCE 0.0 GPM RADIATION Rft-A5 C0flDEllSER EXHAUST 2.7E01 CPM Ril-A2 RB ATl10 SPHERE 2.0E01 CPM Ril-G8 RB D0f1E 5.0E00f1R/HR RM-L9 ICCU 1.0E00 CPM

'I b

Y DISPLAY 5

~

RADIATION CONTROL RM - L1 LO 2.0E01 CPM LETD0uti RM - R4 GAS 2.5E01 CPM F H BLDG Rn - R6 GAS 1.0E01 CPM RUX BLDG Rn - R8 GAS 3.0E01 CPM PLANT STACK R!t - R9 GRS 4.0E01 CPM RB STACK Rf1 - A5 2.7E01 CPM CtlDSR EXH 6 EMW DISPI.AY 6

1 C0llTAINNENT CONDITIONS 4

3 PRESSURE RADIATION i

i R

0.0 PSIG F.M-82 RB ATMOSPHERE 2.0E01 CPM l

B 0.0 PSIG RM-G8 RB DONE 5.0E00 MR/HR I

TEMPERATURE (TE655)

U (!!E SEC SHIELD ELV 364) 110.0 DEGF A (SE URLL ELV 352) 109.0 DEGF E (S SEC SHIELD ELV 352) 111.0 DEGF l

I (flu WRLL ELV 352) 112.0 DEGF LEVEL l

HYDROGEN C0!! CENTRATION SUMP 3

R 0.0 PCT R

A5.0 Ill B

45.0 IN FLOOD I

A 0.0 IN B

0. 0 ill i

\\

i I

DISPIAY 7 4

REACTIVITY / POWER DISTRIBUTION POST TRIP POWEP,RRNGE INTERMEDIATE RANGE

~

POWER STARTUP RATE NI - 5

8. 0 PCT NI - 3
0. 0 DPM NI - 6
8. 0 PCT NI - 4
0. 0 DPM fil - 7
8. 0 PCT NI - 8
8. 0 PCT SOURCE RANGE STAP, TUP RATE NI - 1
0. 0 DPM NI - 2
0. 0 DPn

'4 E

4 DISPLAY 8

r

\\

M O

te W

\\

g N

M g

F -

g C

O O

\\

O W O

\\

se 0)

\\

0.

O 3

c- _ __________\\y__a____

g I

W m

g g

W p

\\

T e

\\.

\\

J

\\

O CL.

\\

\\

is N

ui

\\

S

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ y _ _t. _ _ g g

2_

d

)

U1 M

C

\\

Cu :"

\\

O CD

  • \\

==

,J O

w u.

  • \\

r4 W

1 u,

A

\\

H Lu

\\

$ g.

\\

~2: O g

e 3

LA.

g b1 W

g 6:: CL

\\

I 5

g E

g O

.m 3

(.n C (n

\\

\\

F r

Q 0-N

\\

w H-

\\

\\

\\

'\\

cc r_n

O O

'\\

\\

e9

-a

\\

r x

CA.

1

'\\

1 o

1 0

\\

\\

t y

r EE

>>11

\\

l KKOO

\\

\\

<1 <I = =

t

\\ l i

i i

a i

i O

==oo e

i r

i i

i MMQO r4 r

EKWW OC O

O O

O O

O Q. E bi be 00 O

O O

O O

O ut t (4

O W

O

  • e

('l

<! ac <! w

( 4 s. 4 (4

(4

.e Q. Q. LL (L

^ #", O OO 3^OO 0000

=CC D

O tt,. O O 0000 N.,

ess 00

.J I JJJJ O LOC iJ e'e s e LNCO VWO 13 W ^

in

  • f
  • t-N. H W Os D =

2.J l

D 10 0 E HWM kr

=

ill I Lt. - u s

  • O J -,I m

= w --

\\

\\

C t

0 C 6-

\\

W mm

\\

\\

7

%C

't 1

AA

\\

\\

'e 1

O 1

y

\\

\\

r EK

>>44 8,

1 EEOQ g

\\

6 1 l 44==

i O

EEOO (d

wwuo

?

KKWW OO O

O O

O O

O o.u.blus 00 O

O O

O O

O ut t (4

O eb O

W l'1 4W4m (4t4 (4

(4 K Q. lk E aOO CO W ie 0000 COO G.

O e.

0000 N

O C0 4

.J.J.J J O

te. O O I.J a u) ks W.J O W t.3 13 W 6 IWa

  1. +*+

N >. W b) > 0 DH l

D4Q=E H W u.

> W La.

Ils.

I E w h e.*

O.J w 4 Q3 g.J w 4 Q2

~.

I j

REACTOR C00LAllT SYSTEM IllTEGRITY POST TRIP flATURAL CIRCULATI0fl l

RB SUl1P RCS FL0ll BALANCE 9.1 GPM lilCORE SUEC00 LING MARGIN 68.0 DEGF j

LEVEL A 45.00 Ill LEVEL E 45.00 Ill

' ' ' ~

so

-so ttRSS BALANCE 0.0 GPl1 ws ws No RADIATI0fl

--M e as

-4o8 as

-3 o l

RH-A5 00flDEllSER EXHAUST 2.7E01 CPit M "

~~' *

~3 o M "

Rit-G25 00ilDENSEP. EXHAUST 2.0E0011R/HR

" " ~

-20

-20 Ril-G26 OTSG A STEAM RELIEF 1.0E01 CPM

-2eo

-t s

--is RH-G27 OTSG B STEAM RELIEF 1.IE01 CPM 32s-Ril-82 RB ATf10 SPHERE 2.0E01 CPf1 22+

7 RM-G8 RB D0f1E 5.0E00(1R/HR

--t

--i s

-- t

  • * ~

~

i Ril-L9 10011 1.0E00 CPil l

RM-L2 LOOP A DCCil 1.0E00 CPM 2fo rn Etu so rr 2 rr so rr i

RM-L3 LOOP B DCCll 5.0E00 CPH nor av e:a nor LEG hec.D L G

(

...e /

p j.

umanarrecutz marzr-DISPLAY 12

~---. -. -.. - _... -

.~ _

pun i r Ah'sli hi LC*ll10H f

1 LP.M f

CON T ACT COPitR

A ;, r t;;

l 84"UI AA AG Tapt$

MULT PLEXtf4 s

e l w

&l9 AN ALOG

\\

lNPUT n

MULisP6L A t A MH j

=

N D854 i

I

[E/[]

3 C R A PHIC j

f PROGRAMMER $

J R E ACTIMETE R i

i 1

i i

r 1

sA M woRo TMl1 Moo comp CLASSIC 3

TSC "o'5 "

l Hartiware,

j g'

i Configuration

,ixto n.

30 LID STAT:

s MCMORY 512x woRos r

?!

Ossg EOF 1M WORD 9,

S J

ALARu g

PRiNitR l

200 LPM A

Wxrn.r_a, m

CRT 7

ALEI I

CCat I

COLCR

- Case i

ytvogy C"'

I INitRf ACE UTILITY I

k

)

ba

,5 PRI:TER o

I I

~

200 LPv i

E COLOR p

UTILITY C9T 855 input 6-COLOR Mt;LT::ttxtas CRTS(2) 1 ANALOG

{

oisc cent TRENO REMort ANALOG l

MEMORY MEMOAY "ECC" IR SNPut 32K tiORDS,

OPf4ATORS N

CONSOLE caj,$tga DISPLAY LaCAL 1/INDOI?

r l

snPu PERICOIC N

LOC OfCITAL INPUT PROGRAM TYPER CUh5CLE l

[

^

)

1 1TPtR Uf f tlTY h

l N

PAPER T APE PRocaan p ggg,y i

"i PAPt4 TAPg PUNCH 1

TYPER ppy Rt Cga

.L rIcunt 1 - CURRENT HA M.!ARE CONFlfLUBATION

I l

1 l

I HUX FCA - PROGRA!!MERS AREA I

Switch FUNCTIONAI.

I FCB - DATA ACQUISITION Cott:'trl CRS FCC - HUMAN CO:OfUNICATION5 0-100 2N I

^

~

LOCAL 100 - +100 2;V FCC FCE M1ALOC/

l FCE - EALANCE OF PLANT CALCULATION 4-29 ITA DICITAL,

^

Others

!!UllrI-1 I

FCB

' 52j DATA g

Digital ACQUISITION SOE A

A 3,

l

/

}

~

MODQ.'!P CORE l

V

%/

CLASSIC 7

t PfD10RY I

U

(

LINK x

l BPF SDF

)

(

)

DATA BASE l

LN: VAL

.,*1 I

ColtE

!!DIORY l

g APID CPID CRF t

LN: VAL - Read Bailey SDF, convert value, and I

DISC store in data base.

g DA:EXC - Data Acquisition Executive l

l

\\

l BAILEY 855 DATA BASE

\\

l i

I' BF - BULK POINT FILE I

APID - ANALOC POINT ID FILE CPID - CONTACT POINT ID FILE CRF - CROSS REFERENCE FILE SDF - SYSTDI DATA FILE FIELD BAILEY 855 COMPUTER MODCOMP CLASSIC COMPUTER Data Flow Lines (Bi-Directional)

FICURE 2 NORMAL OPERATION DATA FIIM FROff FIELD TO DATA BASES

/

'~

1 I

I

~

s^

l I

S Tal FUNCTIONAL

~

FCB - DATA ACQUISITIO:J 0-100 HV

'^

FCC - HUMAN C0!!MUNICATIONS g,p 7

FE FCD - NUCLEAR CALCULATIONS

-10G - +1t?O.':V ANatoc/

FCE - BALANCE OF PLANT CALCULATIONS 4-20 ftA DIGITAL

/4

~

Others

!!UI.TI-g I

PLEXER l DATA I -"

Digita l ACQUISITION SOE

) \\

)\\

y v

CORE MOD 00MP

/

I HEf10RY CLASSIC

(

IM CPU g

CPF J

sup q

)

g

)

DATA BASE I

g LN: VAL (X)RE l

DA:EXC HEI:0RY l

APID g

,CPID CRF I

LN: VAL - Read Bailey SDF, convert value, and I

DISC store in data base l

l l

DA:EXC - Data Acquisition Executive N

g N

BAILEY 855 Data Base j

I BPF - DUU' POINT FII.E I

APID - ANALOG POINT ID FII.E CPID - CO: TRACT POINT ID FII.E 4

CRF - CROSS REFERENCE FILE SDF - SYSTDI DATA FILE FIELD BAILEY 855 COMPUTER MODCOMP CLASSIC COMPUTER

(

> Data Flow Lines (Bi-Directional)

FICURE 3 i:

BAILEY 855 OUT OF SERVICE DATA FIDi FROM FIELD TO MODCOMP DATA RASE

h sla/sc HUMAN FACTORS AT GPU NUCLEAR Staff:

Manager, 2 full time HF Engineers, Co-Op student (grad)

Location:

Corporate HQ, Parsippany, NJ Organization:

Computer Appl./ Human Engineering Dept, Systems Engineering, Technical Functions Division, GPU Nuclear Involvement in Projects:

Reviews all new modifications to plant, reviews existing control stations. Reviews all op/maint. mods.

INVOLVEMENT BEGINS AS EARLY AS POSSIBLE IN EACH DESIGN DEGREE OF INVOLVEMENT SELF-DETERMINED (DEPENDS ON NATU One HF Engineer Assigned to Each Project HF GROUP WILL INITIATE NEW PROJECTS TO CORRECT Human Engineering Deficiencies WHICH ARE FOUND IN THE PLANT.

HF will review and aid in preperation of applicable documents *,

drawings, hardware sele'etion, etc. and follows through to project installation.

Other areas of HF involvement:

Ambient Environment surveys Assigns Control Room hardware / alarm locations y p Formats all CRT displays All plant labels ordered through HF All wording (labels, alarms, etc) chosen by HF Reviews / Formats plant procedures on request, Formats all E0Ps Attendance:

HF attends all applicable PEDR and OMCR meetings

SUMMARY

COMPREHENSIVE, FULLY INLOVED HF PROGRAM

llI -

'7 y

.if HUMA3 FACTORS PROCESS fliF G.25tew ef

'l IHF Riview sf T

SPDS goals /

Generic HF g,

SPDS DEVELOPMENT reeutrements Documents W

T (DISPLAY NUTAC SPOS Gutde CE EPRI NRC-L NUREG 0835 J

HF books E

s g

(

k GPU Doctaments )

DESIGN g

F Definition of

]

Functional' 'j

. HF/SAPC V

/

Existing.

l Plant-Specific is Analysis by I

Computer Displar g

Safety Analysis (SA/PC) Red ews/

SPOS Goals

)

Task SA/PC Review.

Y and Needs Analysts E-Background Work by SA/PC C(Objectives-Users),

by SA/PC J

W.

LPARAMETERSELECTIDN.[h I

t r

/____

r 3

r m

r-3 F 3

F 3

HF Review of Secondary Task Analysts Walkthrough #1 Training.

2nd Displays: Color, by SPDS Comuntttee; with all users Session-Walk-Format Scales. Units Relation of SPOS to CR (STAS. SR0s) for A.

through with-l Consistency

. )

Crew Roles / workstations Q done with proper h

SPDS

/

CRT Displays display options by

_U1crs. _

HF/SAPC Coinnent 1

0 i

l Resolution l

l Mit 4 ** /h.>

j y} p~

~J L

J L

j k

I

  • t ! <*. t* t< > s 1/

l AJ! /I L * / t'PWQ f

/*t. wit

  1. *'I--

SPDS Comittee 4

evaluation of-(

j,f[,, y-conenents - final SPDS '.

e Display Scrutiny f

i l

l J

l

.- tw ra o i so

[/MM.

jyjGW * /5AJt'l.-

Z>sp4**fS ll6ke2>

/Ei>:

2beu,w nAs be, w f"

N.

ekspr V8V TEAM MEMBERS o

BRUCE OLAF SOFTWARE DEVELOPER 0

JIM P. Hell 0.A. ENGINEER 0

TAE Y. BYOUN NUCLEAR ENGINEER Zh-e

SPDS V8V SCOPE 1

INDEPENDENT REVIEW & EVALUATION OF THE SPDS SOFT (5 CSF'S & 9 DISPLAY PROGRAMS),

2.

REVIEW AND COMMENTS ON SYSTEM REQUIREMENTS DOCUM AND DESIGN DOCUMENTS PER V8V PROCEDURE.

3.

REVIEW AND COMMENTS ON TEST PROCEDURES AND TE PRIOR TO AND AFTER THE TESTING COMPLETION.

4 MONITOR AND EVALUATE THE TESTING PROCESS.

5.

NOT INCLUDED ARE:

O HdRIDWARE CONFIGURATI0N DESIGN REVIEW 4

PLANT PROCESS COMPUTER HARDWARE AND SOFTWARE WAS INSTALLED PRIOR TO AND INDEPENDENT OF THE SPDS DE THERE IS NO SPDS HARDWARE.

O HUMAN FACTOR REVIEWS HUMAN FACTORS CONSIDERATIONS HAVE BEEN INCLUDED IN THE SPDS AS AN INTEGRAL PART OF DESIGN PROCESS.

THE HUMAN FACTORS EVALUATIONS HAVE BEEN PERFORMED SEPARAT AND DOCUMENTED.

SPDS OBJECTIVES AND REGULATORY REQUIREMENTS O

4

s P.'I.E 7 Or 21 TIREEMILEIILANDUNITI IAFETYPARAMETERDIIPLAYSTITEM REQUIREMENT! TRACEAPILITY MATRIX (RTM II) l GPLW l l

l l

l l

l RTM l REQUIREMENT IREQUIREMENTIDEIIGN/CODEITEITMAN. 1TEITPROC.I I ITEMi DEICRIPTION l u n m l u n n u n n u n n u u n n m u n m n u n n u n n li e n n mi REFERENCE (!)lREFERENCE(IllREFERENCE(!)l REFERENCE REMARKS i 13.36 i Radiation Control Priority 2 CIF flowchart.

l (A) P.163 I (A) P.f44, I l

i VER-M5I i

l l (A) P.350 l 145 I

I lVER-60$J l

-l --l-c I

-1

-l-l 13.35 l Radiation Control Priority i CIF floschart.

1 (A) P.163 l (A) P.143, I I

I l

l j.....l

........................ll..(A) P.356 1 144 l

l l

l

...__...l.c----------1------------I----------1-------.-...-.-.1 l13.46IContainmentConditionearningCIFfloschart.

l(A)P.164 l(A)P.133-l l

l 1

I I

I(A)P.351 1157 l

l l

1 I

l-1

-1.c

-l-

-l-

-g-

-j i 13.45 i Contai nent Condition alare CIF floschart.

1(A)P.164 l(A)P.136-l l

1 1

I I

I(A)P.351 1152 l

I I

I lumulminununununununununnmumninununniecununnlimimnulunnunniumun i 14. M l 3PDI paraseters organized into 5 I(A)P.12 I(A)P.7,191 1

I l

l l critical safety (sactions (CIF).

l l

l l

l l

l aum i mmunu m u n mmmam**mmman lmmunn i nunann i nnmum l umun l 15.H l Reactivity /Pomer listribution CIF l

1-t l.

I I

-l lParaseters.

'l

.l..

_l

__ _ ____ll.

ll__...l._

......ll..

.ll l-l l 15.65 i Paraseters for CIFs, Table 3.1.

1(B)P.28 l(A)P.26, I l

lVER-M4N l

l 1

1 I116-118 I

I l

l 1

I

-l-l-c I

I I

I i 15.16 l Reactivity / Power listribstion paraseter names.

1(B)P.30 l(A)P.27,271 1

I 1

l l

1

-l-c

-l-1

-l l

i 15.15 i Reactivity / Power distrib: tion critical safety I(A)P.39 I(A)P.26,271 I

i i

I I function parameters, point niebers (Table 6.1). I I

l l

l l

j l..

l 15.26 l R/PD & PSHR poser operation level i display.... _ _l_

.l.g

... l...

l....

l

-l l(A)P.354 l(A)P.27 l

l l

l l

l coopster points - PT Plot.

l l

l l

l l

l-I--

-l l-c

-1 I

I l

! 15.25 i R/PD & P!HR power operation level i display 1 (A) P.355 l (A) P.26 l

1 l

l I

l computer points - Fler Flos I

l l

l g.___. l

...___..............Isb a la nce Pl o t........... __

.l..........l

..... l

.......ll___.__

....l..

l l

l 15.36 l R/PD & PJHR poser operation level i display l (A) P.355 l (A) P.26,271 l

lYER-M4D 1

l g

1 1

Icospiterpoints-FeedsaterFlosPlot.

l I28 I

l l VER/DR-666 l

l I-1

-1

-l l

I l

~l l 15.33 i Correction to R/PD and PJHR poser operation 1(C) l l

l lVER-991A l

(

l I level 1 display computer I RC i M22 I i

I j... l...

............ points..............

.l..........l....__..

..l........... l__....... !

l 15.35 i R/PD poser operation level 2 display - coepiter I(A)P.361 1(A)P.26 I

I IVER-M4E I

l...

.l l

l Ipoints.

l 1

I I

I I

I l-

-l I-c I

I I

I i15.46iReactivity/PowerlistributionposttriplevelI l (A) P.378 I (A) P.26 I

l l

1 1

1 display - computer points.

lanmimunnumununnmunmunnumanalunnunnlminnnninnnunnlun l

1 I

l l

l i

i

\\

~

s OVERVIEW OF SPDS V8V ACTIVITIES

, >.CtX - S o.4.s / h.,u GPUN &V PLAN 4*'M/ # "'#

N"

/%k HS_AC 39 V&V PROCEDURES '

-y V8V PROC. (TDR-711) g V&V TEAM (SAIC/GPUN) y SPDS SAFETY ANALYSIS y

SYSTEM REOUIREMENT TRACEABILITY MATRIX VER. 1 (RTM-Ilg (TR-18)

REQUIREMENT VERIFICAT10N RE0tilREMENT VERirICAT10N REPORT SPDS GUIDELINES 7

6 L

(TDR-g y

VSV (SAlG) @

> DESIGN RTM-Il SPDS DESIGN DOCUMENTAT10N L

h g VERIFICATION -

(IDR_618)

}

DESIGN VERifICAT10h REPORT V8V (GPU) y 1

f VAllDATION TLST PLAN (L)

' bYblLM RIM-11I TEST PROCIDURES R TEST MANUAL VALIDAtl0N VALIDAll0N TEST REPORT g

m SPDS PACKAGE h

TEST g

V8V (GPU)

A M

V8V FINAL FINAL REPORT REPORT V

i v8v (GPu) d 4

CosmeMr/bsow7MN 87mDS &EET

u============================

! REVIEWER'S COMMENT i======================================I SERIAL NO:===============

1 0F 2

==

VER-003 1 PROJECT: TMI-1 SPD g==u================S V&V=======================TE:

06/27/85 l DA

=

1 V&V TASK: Desi

================
=======u=======gnVerification=======================i=

Heil ISSUED BY: T. Byoun/

l DOCUMENT (S) UNDER REVIEW: TDR-618, Rev 0

====

1 I

l===========u=======================================

l COMMENT:

=============

1 A. RTM 05.30 - TDR does not address tha t remova t of points froni scan I

required if instrument string feeding SPDS computer input is removed.

is 1

( RESPONSE ACCEPTABLE 08/08/85) l B. RTM 05.35 - TDR does not address that redundant senso l

used if availible.

re to be 1

( RESPONSE ACCEPTABLE 08/08/85)

I C. RTH 09.05 - TDR does not address when more i

provided for'a parameter, than one computer point against alarm setpoint.

use point closest to limit to compare l

l

( RESPONIE ACCEPTABLE 08/08/85)

I D. RTM 09.15 - TDR does not address any i

exceeding valid point for parameter 1

(. RESPONSE ACCEPTABLEiimit causes CSF atarm,or warning.

08/08/85)

I E. RTM 10.00'- TDR does not address that SPDS spurious alarms I

including L2931.

may occur during I

heatups, and should clear.

cooldowns, cold shutdowns, and I

( RESPONSE UNACCEPTABLE - SEE VER/DR-001 08/08/85) 1 i

F. RTh 45.23 - TDR does not address accuracy I

i chart.

for hot leg A/B tevet bar i

I

(

RESPONSE UNACCEPTABLE - SEE VER/DR-002 08/08/85) l l

G. RTM 45.28 - TDR does not l

chart.

address accuracy for RV Head level bar I

l l

(

RESPONSE UNACCEPTABLE - SEE VER/DR-002 08/08/85) l l

H. RTM 45.33 - TDR does not address accuracy l

i chart.

for Pressurizer level bar I

I

(

RESPONSE UNACCEPTABLE - SEE VER/DR-002 08/08/85) l I

I. RTH 46.00 - TDR does not I

ment of alarms.

address audible alarm or l

user acknowledge-1 I

( RESPONSE A l = = = = = = = = = = = = = = = =C C E P T A B L E 08/08/85)

I

================================

j i RESPONSE:

l (SEE S.M.CAFRELL1 NEh0 5421-85-0062, 07/18/85) l i

i I

i I

I I

I I

I l============================================

l RESPONSE BY: (SC)

DATE: 07/1

====================================== = = = = = = = = = = = = = = =

1

=======

l

~

~

TMl-1 SPDS VEV DOCUMENTATION VERIFICATION & VALIDATION PROCEDURES (TDR-711) o o

VALIDATION TEST PLAN (TDR-710)

SYSTEM REQUIREMENTS VEAIFICATION RER0RT-(COMPLETED) o (RTM-1, COMMENTS / RESOLUTIONS, DISCREPANCY REPORTS)

DESIGN VERIFICATION REPORT (DRAFT) o (RTM-II, COMMENTS / RESOLUTION, AND DISCREPANCY REPORTS)

~

o VALIDATION TEST REPORT (RTM-Ill, TEST MONITORING RESULTS, DISCREPANCY REPORTS, AND COMMENTS / RESOLUTIONS) o FINAL V&V REPORT

SPDS SYSTEMS REQUIREMENTS VERiflCATION SPDS SAFETY ANALYSIS y REQUIREMENTS (TR-18)

RTM-1 APPROVE IDENTIFICAT10N RTM-l L

m" SPDS USER GUIDELINES RTM-l 7

O (TDR-583) hr V8V (SAIC)

GPUN RESPOND TO 4

REVIEWER V8V PROCEDURES COMMENTS i

GPUN FORMAL SYSTEM REQUIREMENT REQUIREMENTS V}RIFICATIONREPORT g

b VERIFICATION b

,-DISCREPANCY REPORTS a

V&V (SAIC)

V&V PROCEDURES h

, RESOLVE 4

DISCREPANCIES T

DESIGN TEAM (GPU)

D DESIGN VERIFICATION PROGRAM SOURCES OF DESIGN VERIFICATION o

SPDS COMPUTER DESIGN AND IMPLEMENTATION (TDR-618)

BACKGROUND - SPDS CODE, RESULTS OF REQUIREMENTS o

VERIFICATIONS AND ANY IDENTIFIED REQUIRB1ENTS UPDATES DESIGN VERIFICATION CORRELAT' ION OF DESIGN TO SYSTEM REQUIREMENTS o

o REQUIREMENTS TRACEABILITY MATRIX VER. II REVIEW & EVALUATION OF DESIGN DOCUMENTATION FOR o

TECHNICAL CORRECTNESS AND COMPLETENESS o

IMPLICATION ON THE VALIDATION TESTIN3 COMMENTS / RESOLUTION AND DISCREPANCY REPORTS o

DESIGN VERIFICATION ACTIVITIES (GPUN)

V&V PROCEDURES d

RTM-I g

IDENTIFY DESIGN RTM-1I FEATURES AND g

DESIGN 00C.

g ADD RTM-1 f 8V COMMENTS (TDR-618 )

f V&V TEAM 4

RESPONSE TO V&V COMMENTS V8V PRO'CEDURES 1 r 1r DESIGN TEAM FORMALDESIGNl DESIGN VERIFICATION REPORT

'@j VERIFICATION !

A F

t V&V TEAM.

DISCREPANCY REPORTS g

RESOLVE 4

DISCREPANCIES o

I DESIGN TEAM

~

7 E

~

l yALIDATION TEST PROGRAM OVERVIEW OF VAllDATION TEST ACTIV! TIES o

1 PREP. VALIDATION TEST PLAN (GPU V&V TEAM) 2.

PREP. TEST PROCEDURES & TEST MANUAL (GPU 3.

UPDATE TEST PROC. & TEST MANUAL REFERENCE TO

~

RTM-Ill AND TEST PLAN (GPU V&V TEAM) 4 PERFORM (GPU DESIGN TEAM) AND MONITOR (GPU VALIDATION TESTING

~

5.

PREP. VALIDATION TEST EVALUATION REPORT (GPU V&V TEAM) o SOURCE MATERIALS COMPLETED SPDS PACKAGE (CODEDESIGN D0C. AND o

ANY DOCUMENTED DESIGN UPDATES)

RESULTS OF REQUIREMENTS VERIFICATION o

RESULTS OF DESIGN VERIFICATION o

.~

VALIDATION TEST AND ANALYSIS [GPUN) v&v PROCEDURE 4

JDR-618 k -583 DEVELOP g

SPDS VALIDATION VALIDATION TEST PLAN

_RTM. PACKAGE TESI PLAN U{A y

r y

V&V PROCEDURES t

V&V TLAM V

V DESIGN DOCUMENT (TDR-61R) i DEVELOP TEST lEST PROCLDURES & TEST MANUAL RIM-I & II h

PROCEDURES AND V&V PROC.

yg OTHER SPDS PACKAGE TEST MANUAL

~

m 9

-e REVIEW AND DESIGN TEAM RTM-1II EVALUATE p

TEST PROG.

DISCRLPANCY RLPORTS

& TEST MANUAL f

i VAllDATION IEST PLAN ygy TEM RESOLVE

,/.._

N j f,,,,

DISCRLPANCIES "N

4 y

v 4

DESIGN TEAM

%C,

MONIIOR lEST RESULT DOCUMENTAT10N C


) TESTING d

VAllDAT ION TEST EVALUATION REPORT g

V&V TEAM (MONITOR)

,ANALYii&

4 DESIGN TEAM (PERF0 01)

EVALUATE DISCREPANCY REPORTS q

A 7

k Y

k V&V TEAM RESOLVE DISCREPANCIES DESiGJ1aM

CURRENT V8V PROGRAM STATUS o

e ITE*4 DESCRIPTIONS STATUS o

V&V PROCEDURES o

DRAFT BY SAIC (10/22/84) o ISSUED BY GPU (8/8/85) o VALIDATION TEST PLAN o

DRAFT BY SAIC (3/29/85) o ISSUED BY GPU (8/8/85) o SYSTEM REQUIREMENTS COMPLETED BY SAIC (3/29/85) o VERIFICATION RE0'T VERIFICATION REPORT (3/29/85) o o

RTM-1 (3/29/85) 29 V&V COMMENTS ISSUED AND RESPONDED o

o 2 DI.SCREPANCY. REPORTS.lSSUED o

CONCLUSION:

RE0'T DOCUMENTS (TR-18', AND TDR-583)

DEFINE THE SPDS SOFTWARE REQUIREMENT o

DESIGN VERIFICATION DESIGN VERIFICATION REPORT (DRAFT) o o

RTM-Il COMPLETED SUBJECT TO RESOLUTION OF DISCREPANCY REPORTS o

36 COMMENTS WERE ISSUED AND RESPONDED o

9 DISCREPANCY REPORTS WERE ISSUED o

VALIDATION TEST TEST PROCEDURES (DRAFT) AND TEST o

MANUAL (DRAFT) WERE REVIEWED AND COMMENTS WERE ISSUED REVISED TEST PROCEDURES BEING o

REVIEWED & C MMENTED o

16 TESTS HAVE BEEN PERFORMED o

RTM-Ill BEING ADDED e