ML20134K759
| ML20134K759 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/13/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Sellman M ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20134K762 | List: |
| References | |
| NUDOCS 9611200019 | |
| Download: ML20134K759 (5) | |
See also: IR 05000382/1996024
Text
_
'
i
,
g" "%y
f. ,
NUCLEAR REGULATORY COMMISSION
1
,_
f,
.
REGION N
i
3- '
[
611 RYAN PLAZA DRIVE, SUITE 400
t9.....f
AR LINGTON, T E XAS 76011 8064
NOV 131996
'
Michael B. Sellman, Vice President
Operations - Waterford
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT 50-382/96-24 AND NOTICE OF VIOLATION
Dear Mr. Sellman:
An NRC inspection was conducted October **-25,1996, at your Waterford Steam Electnc
Station, Unit 3 reactor facility. The encic
.eport presents the scope and results of that
inspection.
During the inspection, two violations of NRC requirements were identified. The two
j
examples of the first violation indicate a less than rigorous resolution of identified
deficiencies in a timely manner. The second violation is of concern because your staff
failed to establish requirements to completely test the entire actuating system of
safety-related components.
These violations are cited in the enclosed Notice of Violation (Notice) and the
circumstances surrounding the violations are described in detail in the enclosed repurt.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
One unresolved item was identified (pending resolution of Task Interface Agreement
96TIA017)concerning the closed safety function of certain containment isolation valves
that receive an open engineered safety feature signal and fail open on loss of air. This
matter is discussed in Section E2.1 of the enclosed inspection report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
9611200019 961113
POR
ADOCK 05000382
G
_
.
_.
.-
_ _ _
_
4
i
1
,
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss
,
them with you.
!
Sincerely,
I
l}l
Ak
J. E. Dyer, Director
Division of Reactor Projects
Docket No.: 50-382
'
License No.: NPF-38
Enclosures:
2. NRC Inspection Report
50-382/96-24
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
.Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
l
Entergy Operations, Inc.
P.O. Box B
l
Killona, Louisiana 70066
l
.
,
t
!
l
?
.
Entergy Operations, Inc.
-3-
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director Nuclear Safety
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
William H. Spell, Administrator
Louisiana Radiation Protection Division
]
P.O. Box 82135
i
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
j
P.O. Box 302
i
'
Hahnville, Louisiana 70057
'
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
1
l
Suite 610
Bethesda, Maryland 20814
i
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
l
o
e-
NOV I 31999
,
Entergy Operations, Inc.
-4-
E-Mail report to D. Nelson (DJta)
l
E-Mail report to NRR Event Trocking System (IPAS)
E-Mail report to Richard Corren (RPC)
E-Mail report to Ronald Frahm, Jr. (RKF)
bec.to DMB (IE01)
,
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
{
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
i
,
i
I
1
s
\\(
DOCUMENT NAME: R:\\_WAT\\WT624RP.GEW
To receive copy of document. Indicate in boxj "C" = Copy without enclosures
"E" = Copy with enclosures *N" = No copy
}
RIV:PEpf hl
C:DRP/Q gV
D:DRP
J
l
l
GEWe M W
PHHarrW@
JEDyer 3 's
11/ g k /96
11/ 4/96/
11/ M /96
OFFICIAL RECORD COPY
200005
4
NOV I 31996
.
Entergy Operations, Inc.
-4-
!
E-Mail report to D. Nelson (DJN)
!
E-Mail report to NRR Event Tracking System (IPAS)
!
E-Mail report to Richard Correia (RPC)
'
E-Mail report to Ronald Frahm, Jr. (RKF)
bec to DMB (IE01)
i
bec distrib. by RIV:
L. J. Callan
Resident inspector
. DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
l
i
DOCUMENT NAME: R:\\_WAT\\WT624RP.GEW
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:PEpf h
C:DRP/Q g})
D:DRP
)
,
GEW @
PHHarrQb
JEDyer WK
11/ gk/96
11/) M 96/
11/(q /96
OFFICIAL RECORD COPY